A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the eligibility requirements for the diesel emissions |
|
reduction incentive program. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 386.104, Health and Safety Code, is |
|
amended by amending Subsection (c) and adding Subsections (c-1) and |
|
(c-2) to read as follows: |
|
(c) Except as otherwise provided by this subsection, for |
|
[For] a proposed project as described by Section 386.102(b), other |
|
than a project involving a marine vessel or engine, not less than 75 |
|
percent of vehicle miles traveled or hours of operation projected |
|
for the five years immediately following the award of a grant must |
|
be projected to take place in a nonattainment area or affected |
|
county of this state. The commission may set the minimum percentage |
|
of vehicle miles traveled or hours of operation required to take |
|
place in a nonattainment area or affected county at a percentage and |
|
for a period that is different from the percentage and period |
|
specified by this subsection. The commission may [also] allow |
|
vehicle travel on highways and roadways, or portions of a highway or |
|
roadway, designated by the commission and located outside a |
|
nonattainment area or affected county to count towards the |
|
percentage of use requirement in this subsection. |
|
(c-1) For a proposed project involving a marine vessel or |
|
engine, the vessel or engine must be operated in the intercoastal |
|
waterways or bays adjacent to a nonattainment area or affected |
|
county of this state for a sufficient amount of time over the |
|
lifetime of the project, as determined by the commission, to meet |
|
the cost-effectiveness requirements of Section 386.105. |
|
(c-2) For a proposed project involving non-road equipment |
|
used for natural gas recovery purposes, the equipment must be |
|
operated in a nonattainment area or affected county for a |
|
sufficient amount of use over the lifetime of the project, as |
|
determined by the commission, to meet the cost-effectiveness |
|
requirements of Section 386.105. |
|
SECTION 2. This Act takes effect September 1, 2019. |