|
|
|
|
AN ACT
|
|
relating to making supplemental appropriations and reductions in |
|
appropriations and giving direction, including direction regarding |
|
reimbursement, and adjustment authority regarding appropriations. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. COMPTROLLER OF PUBLIC ACCOUNTS: TEXAS TOMORROW |
|
FUND. In addition to amounts previously appropriated for the state |
|
fiscal biennium ending August 31, 2019, the amount necessary to |
|
fund the prepaid higher education tuition program described by |
|
Section 19, Article VII, Texas Constitution, for the two-year |
|
period beginning on the effective date of this Act (estimated to be |
|
$210,981,159) is appropriated from the economic stabilization fund |
|
to the comptroller of public accounts for that period for the |
|
purpose of immediately depositing that amount in the Texas tomorrow |
|
fund created under that section. |
|
SECTION 2. APPROPRIATION REDUCTION: FACILITIES COMMISSION. |
|
The unencumbered appropriations from the general revenue fund to |
|
the Facilities Commission made by Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), for use during the state fiscal biennium |
|
ending August 31, 2019, for lease payments are reduced by |
|
$22,589,128. The commission shall identify the strategies and |
|
objectives to which the reduction is to be allocated and the amount |
|
of the reduction for each of those strategies and objectives. |
|
SECTION 3. APPROPRIATION REDUCTION: PUBLIC FINANCE |
|
AUTHORITY. The unencumbered appropriations from the general |
|
revenue fund to the Public Finance Authority made by Chapter 605 |
|
(S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act), for use during the state fiscal |
|
biennium ending August 31, 2019, for bond debt service payments, |
|
including appropriations subject to Rider 3, page I-48, Chapter 605 |
|
(S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act), to the bill pattern of the |
|
appropriations to the authority, are reduced by a total aggregate |
|
of $35,078,954. The authority shall identify the strategies and |
|
objectives to which the reduction is to be allocated and the amount |
|
of the reduction for each of those strategies and objectives. |
|
SECTION 4. APPROPRIATION REDUCTION: OFFICE OF THE ATTORNEY |
|
GENERAL. (a) It is the intent of the legislature that the Texas |
|
Child Support Enforcement System 2.0 project be canceled as of the |
|
effective date of this Act. |
|
(b) The unencumbered appropriations from the general |
|
revenue fund to the Office of the Attorney General made by Chapter |
|
605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 |
|
(the General Appropriations Act), for use during the state fiscal |
|
biennium ending August 31, 2019, for Strategy B.1.1., Child Support |
|
Enforcement, as listed in that Act, are reduced by $21,799,752, |
|
including $11,370,987 from the Child Support Retained Collection |
|
Account. |
|
SECTION 5. TRUSTEED PROGRAMS WITHIN THE OFFICE OF THE |
|
GOVERNOR: DISASTER GRANTS. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$100,000,000 is appropriated from the economic stabilization fund |
|
to the Trusteed Programs within the Office of the Governor for the |
|
two-year period beginning on the effective date of this Act for |
|
disaster grants under Strategy A.1.1., Disaster Funds, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 6. LIBRARY AND ARCHIVES COMMISSION: ADDITIONAL |
|
APPROPRIATIONS. In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $4,400,000 is |
|
appropriated from the general revenue fund to the Library and |
|
Archives Commission for the two-year period beginning on the |
|
effective date of this Act for renovating the Promontory Point |
|
Drive facility in the City of Austin, Texas, for the storage of |
|
public records. |
|
SECTION 7. TEXAS HISTORICAL COMMISSION: NATIONAL MUSEUM OF |
|
THE PACIFIC WAR. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $2,149,600 is |
|
appropriated from the economic stabilization fund to the Texas |
|
Historical Commission for the two-year period beginning on the |
|
effective date of this Act for capital projects at the National |
|
Museum of the Pacific War under Strategy A.1.4., Historic Sites, as |
|
listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act), including: |
|
(1) updates to the electrical, security, and heating, |
|
ventilation, and air conditioning systems; |
|
(2) projects to address accessibility issues; |
|
(3) exterior, roofing, and structural repairs to the |
|
Nimitz Barn maintenance area; |
|
(4) refurbishment of the Bush Gallery to address wear |
|
and tear from visitor volume; and |
|
(5) technology upgrades to exhibits in the Bush |
|
Gallery. |
|
SECTION 8. TEXAS HISTORICAL COMMISSION: COURTHOUSE |
|
PRESERVATION GRANTS. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$25,000,000 is appropriated from the economic stabilization fund to |
|
the Texas Historical Commission for the two-year period beginning |
|
on the effective date of this Act for courthouse preservation |
|
grants under Strategy A.1.3., Courthouse Preservation, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 9. TEXAS HISTORICAL COMMISSION: DEFERRED |
|
MAINTENANCE. In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, and in addition to |
|
other amounts appropriated by this Act, the following amounts are |
|
appropriated from the economic stabilization fund to the Texas |
|
Historical Commission for the two-year period beginning on the |
|
effective date of this Act for the following strategies as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act), for deferred |
|
maintenance projects: |
|
(1) $300,000 for Strategy A.1.1., Architectural |
|
Assistance; and |
|
(2) $2,586,250 for Strategy A.1.4., Historic Sites. |
|
SECTION 10. TEXAS HISTORICAL COMMISSION: LEVI JORDAN |
|
PLANTATION. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, and in addition to |
|
other amounts appropriated by this Act, $2,000,000 is appropriated |
|
from the economic stabilization fund to the Texas Historical |
|
Commission for the two-year period beginning on the effective date |
|
of this Act for historic site planning at the Levi Jordan |
|
Plantation, including architectural, engineering, interpretive, |
|
and site survey services and collections conservation and |
|
acquisition to develop museum exhibits, under Strategy A.1.4., |
|
Historic Sites, as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act). |
|
SECTION 11. DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES: |
|
FOSTER CARE. In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $88,585,541 is |
|
appropriated from the general revenue fund to the Department of |
|
Family and Protective Services for the state fiscal year ending |
|
August 31, 2019, for foster care payments under Strategy B.1.9., |
|
Foster Care Payments, as listed in Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act). |
|
SECTION 12. DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES: |
|
RELATIVE CAREGIVER PAYMENTS. (a) In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $6,833,593 is appropriated from the general revenue fund |
|
to the Department of Family and Protective Services for the state |
|
fiscal year ending August 31, 2019, for relative caregiver payments |
|
under Strategy B.1.11., Relative Caregiver Payments, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
(b) The unencumbered appropriations from federal Temporary |
|
Assistance for Needy Families (TANF) funds to the Department of |
|
Family and Protective Services made by Chapter 605 (S.B. 1), Acts of |
|
the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), for use during the state fiscal biennium |
|
ending August 31, 2019, for relative caregiver payments under |
|
Strategy B.1.11., Relative Caregiver Payments, as listed in that |
|
Act, are reduced by $8,481,040. |
|
SECTION 13. DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES: |
|
DAY CARE. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $5,000,000 is |
|
appropriated from federal Child Care and Development Block Grant |
|
funds to the Department of Family and Protective Services for the |
|
state fiscal year ending August 31, 2019, for day care payments |
|
under Strategy B.1.3., TWC Contracted Day Care, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 14. DEPARTMENT OF FAMILY AND PROTECTIVE SERVICES: |
|
PURCHASED CLIENT SERVICES. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
the following amounts are appropriated from the general revenue |
|
fund to the Department of Family and Protective Services for the |
|
state fiscal year ending August 31, 2019, for the following |
|
strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act), for purchased client services: |
|
(1) $4,908,619 for Strategy B.1.4., Adoption |
|
Purchased Services; |
|
(2) $10,550,475 for Strategy B.1.7., Substance Abuse |
|
Purchased Services; and |
|
(3) $5,792,750 for Strategy B.1.8., Other CPS |
|
Purchased Services. |
|
SECTION 15. DEPARTMENT OF STATE HEALTH SERVICES: X-ALD |
|
NEWBORN SCREENING. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $7,927,458 is |
|
appropriated from the general revenue fund to the Department of |
|
State Health Services for the two-year period beginning on the |
|
effective date of this Act for screening newborns for X-linked |
|
adrenoleukodystrophy (X-ALD) under Strategy A.4.1., Laboratory |
|
Services, as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act). |
|
SECTION 16. DEPARTMENT OF STATE HEALTH SERVICES: EMERGENCY |
|
GENERATOR. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $12,000,000 is |
|
appropriated from the economic stabilization fund to the Department |
|
of State Health Services for the two-year period beginning on the |
|
effective date of this Act for an emergency generator for the Austin |
|
laboratory to continue laboratory functions during a power outage |
|
under Strategy A.4.1., Laboratory Services, as listed in Chapter |
|
605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 |
|
(the General Appropriations Act). |
|
SECTION 17. DEPARTMENT OF STATE HEALTH SERVICES: TRAUMA |
|
CAPACITY AND RESPONSE INFRASTRUCTURE. (a) In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $17,000,000 is appropriated from the economic |
|
stabilization fund to the Department of State Health Services for |
|
the two-year period beginning on the effective date of this Act for |
|
increasing trauma capacity and improving related trauma response |
|
infrastructure under Strategy B.2.1., EMS and Trauma Care Systems, |
|
as listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act). |
|
(b) Of the amount appropriated under Subsection (a) of this |
|
section, $2,000,000 may be used only to provide funding in |
|
accordance with Section 780.004, Health and Safety Code, to trauma |
|
service area regional advisory councils for improving emergency |
|
management services. |
|
(c) Of the amount appropriated under Subsection (a) of this |
|
section, $15,000,000 may be used only to provide funding in |
|
accordance with Section 780.004, Health and Safety Code, to |
|
hospitals that demonstrate regional need and the ability to |
|
efficiently and effectively increase trauma capacity and improve |
|
related trauma response infrastructure. The Department of State |
|
Health Services shall allocate: |
|
(1) at least 40 percent of that amount to provide |
|
funding to hospitals in the Rio Grande Valley, prioritizing, to the |
|
extent consistent with general law, primary teaching hospitals in |
|
that region with a general surgery residency program pursuing |
|
designation as a level I trauma facility; and |
|
(2) not more than 40 percent of that amount to provide |
|
funding to hospitals located in a region directly affected by |
|
Hurricane Harvey. |
|
(d) Any funding provided to an entity under Subsection (b) |
|
or (c) of this section that is not spent for the purpose for which |
|
the funding was provided must be returned to the state. |
|
(e) The unexpended balance of money allocated as provided by |
|
Subsection (b) or (c) of this section as of August 31, 2020, is |
|
appropriated to the Department of State Health Services for the |
|
state fiscal year ending August 31, 2021, for the purpose for which |
|
it was allocated. |
|
SECTION 18. HEALTH AND HUMAN SERVICES COMMISSION: MEDICAID |
|
SHORTFALL. (a) In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $2,000,000,000 is |
|
appropriated from the general revenue fund, and $2,150,000,000 is |
|
appropriated from federal funds, to the Health and Human Services |
|
Commission for the state fiscal year ending August 31, 2019, for |
|
Medicaid client services under Goal A, Medicaid Client Services, as |
|
listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act). |
|
(b) Of the amounts appropriated under Subsection (a) of this |
|
section, the Health and Human Services Commission shall transfer |
|
the following amounts from Goal A, Medicaid Client Services, to the |
|
following strategies as listed in Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act): |
|
(1) $5,500,000 to Strategy D.2.3., Community Mental |
|
Health Crisis Services; and |
|
(2) $2,000,000 to Strategy D.2.2., Community Mental |
|
Health Services - Children. |
|
SECTION 19. HEALTH AND HUMAN SERVICES COMMISSION: RATE |
|
INCREASE FOR CHILDREN'S HOSPITALS. In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $50,000,000 is appropriated from the general revenue fund |
|
to the Health and Human Services Commission for the two-year period |
|
beginning on the effective date of this Act for a rate increase for |
|
children's hospitals under Strategy A.1.5., Children, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 20. HEALTH AND HUMAN SERVICES COMMISSION: |
|
REPLACEMENT OF MONEY TRANSFERRED TO ADDRESS NEEDS RESULTING FROM |
|
HURRICANE HARVEY. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $110,000,000 |
|
is appropriated from the economic stabilization fund to the Health |
|
and Human Services Commission for the state fiscal year ending |
|
August 31, 2019, for Medicaid client services under Strategy |
|
A.1.5., Children, as listed in Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), to replace money transferred from that |
|
strategy to disaster assistance programs to address needs resulting |
|
from Hurricane Harvey. |
|
SECTION 21. HEALTH AND HUMAN SERVICES COMMISSION: STATE |
|
HOSPITAL CONSTRUCTION. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$445,354,363 is appropriated from the economic stabilization fund |
|
to the Health and Human Services Commission for the two-year period |
|
beginning on the effective date of this Act for continuing |
|
improvements to state hospital facilities under Strategy G.4.2., |
|
Facility Capital Repairs and Renovations, as listed in Chapter 605 |
|
(S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act), as follows: |
|
(1) $90,054,363 for construction of a 100-bed |
|
non-maximum security unit at Rusk State Hospital; |
|
(2) $165,000,000 to begin construction of a 240-bed |
|
replacement campus of Austin State Hospital; and |
|
(3) $190,300,000 to begin construction of a 300-bed |
|
replacement campus of San Antonio State Hospital. |
|
SECTION 22. APPROPRIATION REDUCTION: HEALTH AND HUMAN |
|
SERVICES COMMISSION. The unencumbered appropriations from the |
|
economic stabilization fund to the Health and Human Services |
|
Commission made by Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act), for use during the state fiscal biennium ending August 31, |
|
2019, for Strategy G.4.2., Facility Capital Repairs and |
|
Renovations, as listed in that Act, and subject to Rider 221(b), |
|
page II-111, Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act), to the bill |
|
pattern of the appropriations to the commission, are reduced by |
|
$2,000,000. |
|
SECTION 23. HEALTH AND HUMAN SERVICES COMMISSION: CERTAIN |
|
TRANSFERS. From amounts previously appropriated for the state |
|
fiscal biennium ending August 31, 2019, the Health and Human |
|
Services Commission shall transfer $6,154,893 from Goal A, Medicaid |
|
Client Services, to Strategy B.1.1., Medicaid Contracts and |
|
Administration, as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act), for use for contingency contracts. |
|
SECTION 24. HEALTH AND HUMAN SERVICES COMMISSION: HEALTHY |
|
TEXAS WOMEN PROGRAM SHORTFALL. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$10,300,000 is appropriated from the general revenue fund to the |
|
Health and Human Services Commission for the state fiscal year |
|
ending August 31, 2019, for the Healthy Texas Women program under |
|
Strategy D.1.1., Women's Health Program, as listed in Chapter 605 |
|
(S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act). |
|
SECTION 25. HEALTH AND HUMAN SERVICES COMMISSION: MENTAL |
|
HEALTH STATE HOSPITALS. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$31,700,000 is appropriated from the general revenue fund to the |
|
Health and Human Services Commission for the state fiscal year |
|
ending August 31, 2019, for mental health state hospital services |
|
under Strategy G.2.1., Mental Health State Hospitals, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 26. HEALTH AND HUMAN SERVICES COMMISSION: EARLY |
|
CHILDHOOD INTERVENTION. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$1,500,000 is appropriated from the general revenue fund to the |
|
Health and Human Services Commission for the state fiscal year |
|
ending August 31, 2019, for early childhood intervention under |
|
Strategy D.1.3., Early Childhood Intervention Services, as listed |
|
in Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 27. HEALTH AND HUMAN SERVICES COMMISSION: STATE |
|
SUPPORTED LIVING CENTERS. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$10,100,000 is appropriated from the general revenue fund to the |
|
Health and Human Services Commission for the state fiscal year |
|
ending August 31, 2019, for state supported living centers under |
|
Strategy G.1.1., State Supported Living Centers, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 28. HEALTH AND HUMAN SERVICES COMMISSION: REPURPOSE |
|
OF EXPENDITURE OF FUNDS. Notwithstanding Section 20 of the Special |
|
Provisions Relating to All Health and Human Services Agencies, page |
|
II-124, Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act), the Health and |
|
Human Services Commission may use $63,832,747 of the amount |
|
appropriated under that Act to the commission for Goal A, Medicaid |
|
Client Services, as listed in that Act and designated under that |
|
rider for use only for the health insurance providers fee, for |
|
Medicaid client services. |
|
SECTION 29. APPROPRIATION REDUCTION: TEXAS EDUCATION |
|
AGENCY; SUM-CERTAIN APPROPRIATION FOR FOUNDATION SCHOOL PROGRAM. |
|
(a) The unencumbered appropriations from the Foundation School |
|
Fund, general revenue account number 0193, to the Texas Education |
|
Agency made by Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act), for use |
|
during the state fiscal biennium ending August 31, 2019, for |
|
Strategy A.1.1., FSP - Equalized Operations, as listed in that Act, |
|
are reduced by $903,300,000. |
|
(b) Notwithstanding Rider 3, page III-5, Chapter 605 (S.B. |
|
1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act), to the bill pattern of the |
|
appropriations to the Texas Education Agency, the sum-certain |
|
appropriation to the Foundation School Program for the state fiscal |
|
year ending August 31, 2019, is $21,495,735,602. |
|
SECTION 30. TEXAS EDUCATION AGENCY: SPECIAL EDUCATION |
|
SUPPORTS AND MAINTENANCE OF STATE FINANCIAL SUPPORT FOR SPECIAL |
|
EDUCATION. (a) In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, the following |
|
amounts are appropriated from the general revenue fund to the Texas |
|
Education Agency for the two-year period beginning on the effective |
|
date of this Act for the following purposes: |
|
(1) $33,302,428 to offset federal funds withheld or |
|
expected to be withheld as a result of a failure to maintain state |
|
financial support for special education under 20 U.S.C. Section |
|
1412(a)(18) during the state fiscal year ending August 31, 2012; |
|
(2) $74,626,551 to negotiate a settlement agreement |
|
with the federal government to prevent the withholding of federal |
|
funds as a result of a failure to maintain state financial support |
|
for special education under 20 U.S.C. Section 1412(a)(18) during |
|
the state fiscal years ending August 31, 2017 (estimated to be |
|
$41,594,326), and August 31, 2018 (estimated to be $33,032,225); |
|
and |
|
(3) $111,625,833 for the following strategies as |
|
listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act), to prevent |
|
a failure to maintain state financial support for special education |
|
under 20 U.S.C. Section 1412(a)(18) during the state fiscal year |
|
ending August 31, 2019: |
|
(A) $50,000,000 for Strategy A.2.3., Students |
|
with Disabilities, for grants to reimburse school districts for: |
|
(i) providing extended school year services |
|
to students enrolled in a special education program under |
|
Subchapter A, Chapter 29, Education Code; |
|
(ii) costs related to identification of |
|
students eligible to participate in a school district's special |
|
education program under Section 29.003, Education Code, including |
|
full individual and initial evaluations and independent education |
|
evaluations; and |
|
(iii) compensatory services costs related |
|
to the provision of services to students under the Individuals with |
|
Disabilities Education Act (20 U.S.C. Section 1400 et seq.); |
|
(B) $478,500 for information technology needs |
|
related to special education supports under Strategy B.3.5., |
|
Information Systems - Technology; and |
|
(C) $61,147,333 for special education funding |
|
under Strategy A.1.1., FSP - Equalized Operations. |
|
(b) The amount appropriated under Subsection (a)(1) of this |
|
section must be used in the same manner and for the same purposes as |
|
the withheld federal funds would have been provided. |
|
(c) The amounts appropriated under Subsections (a)(2) and |
|
(3)(C) of this section must be used to provide funding for public |
|
schools under Strategy A.1.1., FSP - Equalized Operations, as |
|
listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act), to be |
|
distributed for each full-time equivalent student in average daily |
|
attendance in a special education program under Subchapter A, |
|
Chapter 29, Education Code, in proportion to the applicable weight |
|
for the student under the public school finance system. |
|
(d) Not later than December 31, 2020, the Texas Education |
|
Agency shall report to the Legislative Budget Board and the office |
|
of the governor regarding the use of funds appropriated under |
|
Subsection (a)(3)(A) of this section. |
|
SECTION 31. TEXAS EDUCATION AGENCY: POST-DISASTER SCHOOL |
|
SAFETY. (a) In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $10,930,000 is |
|
appropriated from the economic stabilization fund to the Texas |
|
Education Agency for the two-year period beginning on the effective |
|
date of this Act to provide a grant to a school district that |
|
experienced a school shooting resulting in one or more fatalities |
|
that occurred during the state fiscal biennium ending August 31, |
|
2019. |
|
(b) The Texas Education Agency may provide a grant to a |
|
school district with funding appropriated under Subsection (a) of |
|
this section only for uses relating to necessary and appropriate |
|
post-disaster recovery approved by the agency in accordance with |
|
procedures adopted under general law. |
|
SECTION 32. TEXAS EDUCATION AGENCY: ADDITIONAL |
|
APPROPRIATIONS FOR SCHOOL SAFETY. In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $100,000,000 is appropriated from the economic |
|
stabilization fund to the Texas Education Agency for the two-year |
|
period beginning on the effective date of this Act to provide |
|
funding to public schools, including the School for the Blind and |
|
Visually Impaired and the School for the Deaf, under Strategy |
|
B.2.2., Health and Safety, as listed in Chapter 605 (S.B. 1), Acts |
|
of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), for: |
|
(1) exterior doors with push bars; |
|
(2) metal detectors at school entrances; |
|
(3) erected vehicle barriers; |
|
(4) security systems that monitor and record school |
|
entrances, exits, and hallways; |
|
(5) campus-wide active shooter alarm systems that are |
|
separate from fire alarms; |
|
(6) two-way radio systems; |
|
(7) perimeter security fencing; |
|
(8) bullet-resistant glass or film for school |
|
entrances; and |
|
(9) door-locking systems. |
|
SECTION 33. TEXAS EDUCATION AGENCY: EXPENSES RELATED TO |
|
HURRICANE HARVEY. (a) In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
the following amounts are appropriated from the economic |
|
stabilization fund to the Texas Education Agency for the state |
|
fiscal year ending August 31, 2019, for Strategy A.1.1., FSP - |
|
Equalized Operations, as listed in Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), for the following purposes related to |
|
increased state costs under the Foundation School Program resulting |
|
from Hurricane Harvey: |
|
(1) $271,300,000 for: |
|
(A) increased student costs; |
|
(B) the reduction in school district property |
|
values; and |
|
(C) the reduction of the amount owed by school |
|
districts under Chapter 41, Education Code, due to disaster |
|
remediation costs as provided by Section 41.0931, Education Code; |
|
and |
|
(2) $535,200,000 for the adjustment of school district |
|
property values under Section 42.2523, Education Code, and |
|
reimbursement to school districts for disaster remediation costs |
|
under Section 42.2524, Education Code. |
|
(b) In addition to other amounts appropriated for the state |
|
fiscal year ending August 31, 2019, $636,000,000 is appropriated |
|
from the economic stabilization fund to the Texas Education Agency |
|
for the two-year period beginning on the effective date of this Act |
|
for the increased state costs under the Foundation School Program |
|
resulting from the reduction in school district property values |
|
associated with Hurricane Harvey. |
|
SECTION 34. TEXAS EDUCATION AGENCY: ADULT HIGH SCHOOL |
|
DIPLOMA AND INDUSTRY CERTIFICATION CHARTER SCHOOL PILOT PROGRAM. |
|
In addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, $37,657 is appropriated from the |
|
general revenue fund to the Texas Education Agency for the state |
|
fiscal year ending August 31, 2019, for the adult high school |
|
diploma and industry certification charter school pilot program |
|
under Section 29.259, Education Code, under Strategy A.2.1., |
|
Statewide Educational Programs, as listed in Chapter 605 (S.B. 1), |
|
Acts of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act). |
|
SECTION 35. UNIVERSITY OF TEXAS AT AUSTIN: MARINE SCIENCE |
|
INSTITUTE. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $10,200,000 is |
|
appropriated from the economic stabilization fund to The University |
|
of Texas at Austin for the two-year period beginning on the |
|
effective date of this Act for storm damage prevention and |
|
compliance and the mitigation of damages related to Hurricane |
|
Harvey under Strategy C.2.1., Marine Science Institute, as listed |
|
in Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 36. UNIVERSITY OF HOUSTON: EXPENSES RELATED TO |
|
HURRICANE HARVEY. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $20,288,883 |
|
is appropriated from the economic stabilization fund to the |
|
University of Houston for the two-year period beginning on the |
|
effective date of this Act for expenses related to Hurricane |
|
Harvey. |
|
SECTION 37. UNIVERSITY OF HOUSTON - CLEAR LAKE: EXPENSES |
|
RELATED TO HURRICANE HARVEY. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$83,668 is appropriated from the economic stabilization fund to the |
|
University of Houston - Clear Lake for the two-year period |
|
beginning on the effective date of this Act for expenses related to |
|
Hurricane Harvey. |
|
SECTION 38. UNIVERSITY OF HOUSTON - DOWNTOWN: EXPENSES |
|
RELATED TO HURRICANE HARVEY. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$4,000,000 is appropriated from the economic stabilization fund to |
|
the University of Houston - Downtown for the two-year period |
|
beginning on the effective date of this Act for expenses related to |
|
Hurricane Harvey. |
|
SECTION 39. UNIVERSITY OF HOUSTON - VICTORIA: EXPENSES |
|
RELATED TO HURRICANE HARVEY. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$1,703,828 is appropriated from the economic stabilization fund to |
|
the University of Houston - Victoria for the two-year period |
|
beginning on the effective date of this Act for expenses related to |
|
Hurricane Harvey. |
|
SECTION 40. TEXAS SOUTHERN UNIVERSITY: THERMAL PLANT AND |
|
STEAM TUNNEL MAINTENANCE. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$16,000,000 is appropriated from the economic stabilization fund to |
|
Texas Southern University for the two-year period beginning on the |
|
effective date of this Act for the maintenance of the university's |
|
central thermal plant and site/steam tunnels. |
|
SECTION 41. LAMAR UNIVERSITY: PROPERTY DAMAGE RELATED TO |
|
HURRICANE HARVEY. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $1,418,585 is |
|
appropriated from the economic stabilization fund to Lamar |
|
University for the two-year period beginning on the effective date |
|
of this Act for property damage related to Hurricane Harvey. |
|
SECTION 42. LAMAR INSTITUTE OF TECHNOLOGY: PROPERTY DAMAGE |
|
RELATED TO HURRICANE HARVEY. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$1,312,657 is appropriated from the economic stabilization fund to |
|
Lamar Institute of Technology for the two-year period beginning on |
|
the effective date of this Act for property damage related to |
|
Hurricane Harvey. |
|
SECTION 43. LAMAR STATE COLLEGE - ORANGE: PROPERTY DAMAGE |
|
RELATED TO HURRICANE HARVEY. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$406,112 is appropriated from the economic stabilization fund to |
|
Lamar State College - Orange for the two-year period beginning on |
|
the effective date of this Act for property damage related to |
|
Hurricane Harvey. |
|
SECTION 44. LAMAR STATE COLLEGE - PORT ARTHUR: PROPERTY |
|
DAMAGE RELATED TO HURRICANE HARVEY. In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $6,319,458 is appropriated from the economic |
|
stabilization fund to Lamar State College - Port Arthur for the |
|
two-year period beginning on the effective date of this Act for |
|
property damage related to Hurricane Harvey. |
|
SECTION 45. TEXAS STATE TECHNICAL COLLEGE SYSTEM |
|
ADMINISTRATION: FACILITY ABATEMENT AND DEMOLITION. In addition to |
|
amounts previously appropriated for the state fiscal biennium |
|
ending August 31, 2019, $29,644,640 is appropriated from the |
|
general revenue fund to the Texas State Technical College System |
|
Administration for the two-year period beginning on the effective |
|
date of this Act for the abatement and demolition of certain |
|
facilities on the system's Waco campus. The legislature finds |
|
there is a demonstrated need to undertake this abatement and |
|
demolition. |
|
SECTION 46. TEXAS A&M FOREST SERVICE: EXPENSES RELATED TO |
|
HURRICANE HARVEY. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $2,458,240 is |
|
appropriated from the economic stabilization fund to the Texas A&M |
|
Forest Service for the state fiscal year ending August 31, 2019, for |
|
expenses related to Hurricane Harvey. |
|
SECTION 47. TEXAS A&M FOREST SERVICE: WILDFIRES. In |
|
addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, $54,909,580 is appropriated from |
|
the economic stabilization fund to the Texas A&M Forest Service for |
|
the state fiscal year ending August 31, 2019, for expenses related |
|
to wildfires. |
|
SECTION 48. KILGORE COLLEGE: HIGHER EDUCATION GROUP |
|
INSURANCE CONTRIBUTIONS. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$1,238,238 is appropriated from the general revenue fund to Kilgore |
|
College for the state fiscal year ending August 31, 2019, to provide |
|
for state contributions for health benefits. |
|
SECTION 49. LONE STAR COLLEGE SYSTEM: EXPENSES RELATED TO |
|
HURRICANE HARVEY. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $13,100,000 |
|
is appropriated from the economic stabilization fund to the Lone |
|
Star College System for the two-year period beginning on the |
|
effective date of this Act for expenses related to Hurricane |
|
Harvey. |
|
SECTION 50. JUDICIARY SECTION, COMPTROLLER'S DEPARTMENT: |
|
VISITING JUDGES PROGRAM. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$400,000 is appropriated from the general revenue fund to the |
|
Judiciary Section, Comptroller's Department, for the state fiscal |
|
year ending August 31, 2019, for visiting judge assignments to fill |
|
district court vacancies under Strategy A.1.2., Visiting Judges - |
|
Regions, as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act). |
|
SECTION 51. JUDICIARY SECTION, COMPTROLLER'S DEPARTMENT: |
|
LONGEVITY PAY. In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $523,295 is |
|
appropriated from the general revenue fund to the Judiciary |
|
Section, Comptroller's Department, for the state fiscal year ending |
|
August 31, 2019, for reimbursing counties for longevity pay made to |
|
eligible assistant district attorneys under Strategy D.1.1., |
|
Assistant Prosecutor Longevity Pay, as listed in Chapter 605 (S.B. |
|
1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act). |
|
SECTION 52. DEPARTMENT OF CRIMINAL JUSTICE: SURVEILLANCE |
|
CAMERAS. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $26,000,000 is |
|
appropriated from the economic stabilization fund to the Department |
|
of Criminal Justice for the two-year period beginning on the |
|
effective date of this Act for surveillance cameras under Strategy |
|
C.1.2., Correctional Support Operations, as listed in Chapter 605 |
|
(S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act). |
|
SECTION 53. DEPARTMENT OF CRIMINAL JUSTICE: CORRECTIONS |
|
INFORMATION TECHNOLOGY SYSTEM PROJECT. In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $24,164,000 is appropriated from the economic |
|
stabilization fund to the Department of Criminal Justice for the |
|
two-year period beginning on the effective date of this Act for |
|
corrections information technology system projects under Strategy |
|
G.1.4., Information Resources, as listed in Chapter 605 (S.B. 1), |
|
Acts of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act). |
|
SECTION 54. DEPARTMENT OF CRIMINAL JUSTICE: REPAIR AND |
|
REHABILITATION OF BUILDINGS AND FACILITIES. In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $54,000,000 is appropriated from the economic |
|
stabilization fund to the Department of Criminal Justice for the |
|
two-year period beginning on the effective date of this Act for the |
|
repair and rehabilitation of buildings and facilities under |
|
Strategy D.1.1., Major Repair of Facilities, as listed in Chapter |
|
605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 |
|
(the General Appropriations Act). |
|
SECTION 55. DEPARTMENT OF CRIMINAL JUSTICE: CORRECTIONAL |
|
MANAGED HEALTH CARE. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$190,000,000 is appropriated from the general revenue fund to the |
|
Department of Criminal Justice for the state fiscal year ending |
|
August 31, 2019, for correctional managed health care under |
|
Strategy C.1.9., Hospital and Clinical Care, as listed in Chapter |
|
605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 |
|
(the General Appropriations Act). |
|
SECTION 56. DEPARTMENT OF CRIMINAL JUSTICE: REPLACEMENT OF |
|
MONEY TRANSFERRED TO ADDRESS NEEDS RESULTING FROM HURRICANE HARVEY. |
|
In addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, $38,600,000 is appropriated from |
|
the economic stabilization fund to the Department of Criminal |
|
Justice for the state fiscal year ending August 31, 2019, for agency |
|
operations expenses under Strategy C.1.1., Correctional Security |
|
Operations, as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act), to replace money transferred from that strategy to disaster |
|
assistance programs to address needs resulting from Hurricane |
|
Harvey. |
|
SECTION 57. DEPARTMENT OF CRIMINAL JUSTICE: CORRECTIONAL |
|
OFFICER OVERTIME. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $30,000,000 |
|
is appropriated from the general revenue fund to the Department of |
|
Criminal Justice for the state fiscal year ending August 31, 2019, |
|
for correctional officer overtime under Strategy C.1.1., |
|
Correctional Security Operations, as listed in Chapter 605 (S.B. |
|
1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act). |
|
SECTION 58. JUVENILE JUSTICE DEPARTMENT: SURVEILLANCE |
|
CAMERAS. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $7,547,000 is |
|
appropriated from the economic stabilization fund to the Juvenile |
|
Justice Department for the two-year period beginning on the |
|
effective date of this Act for surveillance cameras under Strategy |
|
F.1.2., Information Resources, as listed in Chapter 605 (S.B. 1), |
|
Acts of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act). |
|
SECTION 59. DEPARTMENT OF PUBLIC SAFETY: HELICOPTER |
|
REPLACEMENT. In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $6,229,489 is |
|
appropriated from the economic stabilization fund to the Department |
|
of Public Safety for the two-year period beginning on the effective |
|
date of this Act for the replacement of one helicopter under |
|
Strategy A.1.2., Criminal Interdiction, as listed in Chapter 605 |
|
(S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act). |
|
SECTION 60. DEPARTMENT OF PUBLIC SAFETY: CRIME |
|
LABORATORIES. In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $5,770,426 is |
|
appropriated from the general revenue fund to the Department of |
|
Public Safety for the state fiscal year ending August 31, 2019, for |
|
crime laboratory operations under Strategy E.1.1., Crime |
|
Laboratory Services, as listed in Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act). |
|
SECTION 61. DEPARTMENT OF PUBLIC SAFETY: EXPENSES RELATED |
|
TO HURRICANE HARVEY AND OTHER NATURAL DISASTERS. In addition to |
|
amounts previously appropriated for the state fiscal biennium |
|
ending August 31, 2019, the following amounts are appropriated from |
|
the economic stabilization fund to the Department of Public Safety |
|
for the state fiscal year ending August 31, 2019, for the following |
|
strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act), for agency operations expenses related to Hurricane Harvey |
|
and other natural disasters: |
|
(1) $34,954,409 for Strategy A.1.1., Organized Crime; |
|
(2) $60,000,000 for Strategy C.1.1., Traffic |
|
Enforcement; and |
|
(3) $2,000,000 for Strategy G.1.3., Information |
|
Technology. |
|
SECTION 62. COMMISSION ON ENVIRONMENTAL QUALITY: EXPEDITED |
|
PROCESSING OF PERMIT APPLICATIONS. Notwithstanding Rider 29, page |
|
VI-24, Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act), to the bill pattern |
|
of the appropriations to the Commission on Environmental Quality, |
|
in addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, the commission is appropriated for |
|
the state fiscal year ending August 31, 2019, all fee revenues |
|
collected from expedited permit review surcharges assessed under |
|
Section 382.05155, Health and Safety Code, and deposited to the |
|
Clean Air Account No. 151 in excess of the estimated amount of those |
|
revenues in the comptroller's biennial revenue estimate for the |
|
state fiscal biennium ending August 31, 2019, for costs incurred to |
|
support the expedited processing of permit applications. |
|
SECTION 63. COMMISSION ON ENVIRONMENTAL QUALITY: |
|
LITIGATION EXPENSES. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$1,400,000 is appropriated from the general revenue fund to the |
|
Commission on Environmental Quality for the state fiscal year |
|
ending August 31, 2019, for litigation expenses under Strategy |
|
E.1.4., Rio Grande River Compact, as listed in Chapter 605 (S.B. 1), |
|
Acts of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act). |
|
SECTION 64. COMMISSION ON ENVIRONMENTAL QUALITY: CAPITAL |
|
EXPENDITURES. (a) Notwithstanding Rider 2, page VI-18, Chapter |
|
605 (S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 |
|
(the General Appropriations Act), to the bill pattern of the |
|
appropriations to the Commission on Environmental Quality, the |
|
total amount that the commission may spend for capital budget items |
|
for the state fiscal year ending August 31, 2019, is increased by |
|
$1,700,000 for security upgrades and replacing carpet. |
|
(b) Notwithstanding Section 14.03, Limitation on |
|
Expenditures - Capital Budget, Article IX, Chapter 605 (S.B. 1), |
|
Acts of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), the Commission on Environmental Quality may |
|
transfer capital budget item appropriations as necessary to make |
|
the security upgrades and replace carpet as authorized under |
|
Subsection (a) of this section. |
|
SECTION 65. GENERAL LAND OFFICE: EXPENSES RELATED TO |
|
HURRICANE HARVEY. (a) In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
the following amounts are appropriated from the economic |
|
stabilization fund to the General Land Office for the two-year |
|
period beginning on the effective date of this Act for the following |
|
strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act), to remove vessels and repair or replace structures or |
|
equipment damaged by Hurricane Harvey: |
|
(1) $696,921 for Strategy A.2.1., Asset Management; |
|
(2) $20,459,797 for Strategy B.1.1., Coastal |
|
Management; |
|
(3) $430,000 for Strategy B.1.2., Coastal Erosion |
|
Control Grants; and |
|
(4) $2,047,454 for Strategy B.2.1., Oil Spill |
|
Response. |
|
(b) Contingent on the nonrenewal by the effective date of |
|
this Act of federal grant funding awarded by the Federal Emergency |
|
Management Agency for the building of emergency short-term housing, |
|
in addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, $2,108,755 is appropriated from |
|
the economic stabilization fund to the General Land Office for the |
|
two-year period beginning on the effective date of this Act for |
|
full-time equivalent employees (FTEs) assigned to build emergency |
|
short-term housing under Strategy D.1.1., Rebuild Housing, as |
|
listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act). |
|
SECTION 66. GENERAL LAND OFFICE: ABANDONED VESSEL REMOVAL. |
|
In addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, $2,000,000 is appropriated from |
|
the Coastal Protection Account, general revenue dedicated account |
|
number 27, to the General Land Office for the two-year period |
|
beginning on the effective date of this Act for the removal of |
|
vessels abandoned as a result of Hurricane Harvey. |
|
SECTION 67. APPROPRIATION REDUCTION: GENERAL LAND OFFICE. |
|
The unencumbered appropriations from the general revenue fund to |
|
the General Land Office made by Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), for use during the state fiscal biennium |
|
ending August 31, 2019, for Strategy D.1.1., Rebuild Housing, as |
|
listed in that Act, are reduced by $48,600,000. |
|
SECTION 68. GENERAL LAND OFFICE: MATCHING FUNDS FOR U.S. |
|
ARMY CORPS OF ENGINEERS PROGRAMS. In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $200,000,000 is appropriated from the economic |
|
stabilization fund to the General Land Office for the two-year |
|
period beginning on the effective date of this Act to provide state |
|
matching funds to meet federal requirements for studies and |
|
projects planned to be conducted in the state by the United States |
|
Army Corps of Engineers. |
|
SECTION 69. PARKS AND WILDLIFE DEPARTMENT: BATTLESHIP |
|
"TEXAS." (a) Contingent on Senate Bill No. 1511 or similar |
|
legislation of the 86th Legislature, Regular Session, 2019, |
|
relating to the operation of the Battleship "Texas" becoming law, |
|
in addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, the following amounts are |
|
appropriated from the economic stabilization fund to the Parks and |
|
Wildlife Department for the two-year period beginning on the |
|
effective date of this Act for the following strategies as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act), for the Battleship |
|
"Texas": |
|
(1) $35,000,000 for Strategy D.1.1., Improvements and |
|
Major Repairs; and |
|
(2) $500,000 for Strategy B.1.1., State Park |
|
Operations. |
|
(b) The amount appropriated under Subsection (a)(2) may be |
|
used only to conduct a curatorial study of artifacts associated |
|
with the Battleship "Texas." |
|
SECTION 70. PARKS AND WILDLIFE DEPARTMENT: EXPENSES RELATED |
|
TO HURRICANE HARVEY. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$8,000,000 is appropriated from the economic stabilization fund to |
|
the Parks and Wildlife Department for the two-year period beginning |
|
on the effective date of this Act for Strategy D.1.1., Improvements |
|
and Major Repairs, as listed in Chapter 605 (S.B. 1), Acts of the |
|
85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), to repair structures or equipment damaged by |
|
Hurricane Harvey. |
|
SECTION 71. PARKS AND WILDLIFE DEPARTMENT: PURCHASE OF |
|
INTEROPERABLE RADIOS. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$5,000,000 is appropriated from the economic stabilization fund to |
|
the Parks and Wildlife Department for the state fiscal year ending |
|
August 31, 2019, for the purchase of interoperable radios under |
|
Strategy C.1.1., Enforcement Programs, as listed in Chapter 605 |
|
(S.B. 1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act). |
|
SECTION 72. PARKS AND WILDLIFE DEPARTMENT: WYLER AERIAL |
|
TRAMWAY. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $5,000,000 is |
|
appropriated from the economic stabilization fund to the Parks and |
|
Wildlife Department for the two-year period beginning on the |
|
effective date of this Act for overhaul and necessary construction |
|
related to the Wyler Aerial Tramway and the related tramway system |
|
under Strategy D.1.1., Improvements and Major Repairs, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act). |
|
SECTION 73. SOIL AND WATER CONSERVATION BOARD: DAM |
|
INFRASTRUCTURE PROJECTS. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$150,000,000 is appropriated from the economic stabilization fund |
|
to the Soil and Water Conservation Board for the two-year period |
|
beginning on the effective date of this Act for dam infrastructure |
|
projects. |
|
SECTION 74. WATER DEVELOPMENT BOARD: MATCHING FUNDS FOR |
|
FEMA HAZARD MITIGATION GRANT PROGRAM. (a) In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $273,000,000 is appropriated from the economic |
|
stabilization fund to the Water Development Board for the two-year |
|
period beginning on the effective date of this Act for the purpose |
|
of providing matching funds for projects sponsored by |
|
municipalities and counties in this state and approved for the |
|
Hazard Mitigation Grant program administered by the Federal |
|
Emergency Management Agency. |
|
(b) Contingent on Senate Bill No. 7 or similar legislation |
|
of the 86th Legislature, Regular Session, 2019, relating to flood |
|
control planning and the funding of flood planning, mitigation, and |
|
infrastructure projects becoming law: |
|
(1) the appropriation of money made in Subsection (a) |
|
of this section has no effect; and |
|
(2) in addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $273,000,000 is |
|
appropriated from the Texas infrastructure resiliency fund to the |
|
Water Development Board for the two-year period beginning on the |
|
effective date of this Act for the purpose of providing matching |
|
funds for projects sponsored by municipalities and counties in this |
|
state and approved for the Hazard Mitigation Grant program |
|
administered by the Federal Emergency Management Agency. |
|
SECTION 75. WATER DEVELOPMENT BOARD: MATCHING FUNDS FOR |
|
FEMA PUBLIC ASSISTANCE GRANT PROGRAM. (a) In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $365,000,000 is appropriated from the economic |
|
stabilization fund to the Water Development Board for the two-year |
|
period beginning on the effective date of this Act for the purpose |
|
of providing matching funds for projects sponsored by |
|
municipalities and counties in this state and approved for the |
|
Public Assistance grant program administered by the Federal |
|
Emergency Management Agency. |
|
(b) Contingent on Senate Bill No. 7 or similar legislation |
|
of the 86th Legislature, Regular Session, 2019, relating to flood |
|
control planning and the funding of flood planning, mitigation, and |
|
infrastructure projects becoming law: |
|
(1) the appropriation of money made in Subsection (a) |
|
of this section has no effect; and |
|
(2) in addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $365,000,000 is |
|
appropriated from the Texas infrastructure resiliency fund to the |
|
Water Development Board for the two-year period beginning on the |
|
effective date of this Act for the purpose of providing matching |
|
funds for projects sponsored by municipalities and counties in this |
|
state and approved for the Public Assistance grant program |
|
administered by the Federal Emergency Management Agency. |
|
(c) Out of the amount appropriated under Subsection (a) or |
|
(b) of this section, as applicable, $30,000,000 may be used only to |
|
provide a grant to Harris County to remove accumulated siltation |
|
and sediment deposits located at the confluence of the San Jacinto |
|
River and Lake Houston. |
|
SECTION 76. WATER DEVELOPMENT BOARD: STATE FLOOD RISK MAPS |
|
AND STATE FLOOD PLAN. (a) In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
and in addition to other amounts appropriated by this Act, the |
|
following amounts are appropriated from the economic stabilization |
|
fund to the Water Development Board for the two-year period |
|
beginning on the effective date of this Act for the following |
|
strategies as listed in Chapter 605 (S.B. 1), Acts of the 85th |
|
Legislature, Regular Session, 2017 (the General Appropriations |
|
Act), for developing or updating flood risk maps in the state, using |
|
current data and technology standards, to support development of a |
|
state flood plan: |
|
(1) $43,970,000 for Strategy A.4.1., Perform |
|
Community Assistance Related to NFIP; |
|
(2) $1,330,000 for Strategy D.1.1., Central |
|
Administration; and |
|
(3) $1,700,000 for Strategy D.1.2., Information |
|
Resources. |
|
(b) Contingent on Senate Bill No. 7 or similar legislation |
|
of the 86th Legislature, Regular Session, 2019, relating to flood |
|
control planning and the funding of flood planning, mitigation, and |
|
infrastructure projects becoming law: |
|
(1) the appropriation of money made in Subsection (a) |
|
of this section has no effect; and |
|
(2) in addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, and in addition to |
|
other amounts appropriated by this Act, the following amounts are |
|
appropriated from the floodplain management account 0330 in the |
|
Texas infrastructure resiliency fund to the Water Development Board |
|
for the two-year period beginning on the effective date of this Act |
|
for the following strategies as listed in Chapter 605 (S.B. 1), Acts |
|
of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act), for developing or updating flood risk maps in |
|
the state, using current data and technology standards, to support |
|
development of a state flood plan: |
|
(A) $43,970,000 for Strategy A.4.1., Perform |
|
Community Assistance Related to NFIP; |
|
(B) $1,330,000 for Strategy D.1.1., Central |
|
Administration; and |
|
(C) $1,700,000 for Strategy D.1.2., Information |
|
Resources. |
|
(c) Using money appropriated by Subsection (a) or (b) of |
|
this section, as applicable, the Water Development Board may employ |
|
22.0 full-time equivalent employees (FTEs) during the state fiscal |
|
year ending August 31, 2020, and 36.0 FTEs during the state fiscal |
|
year ending August 31, 2021, in addition to the number of FTEs the |
|
board is authorized by other law to employ during those state fiscal |
|
years. |
|
SECTION 77. WATER DEVELOPMENT BOARD: FLOOD INFRASTRUCTURE |
|
PROJECTS. (a) In addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, and in addition to |
|
other amounts appropriated by this Act, the following amounts are |
|
appropriated from the economic stabilization fund to the Water |
|
Development Board for the two-year period beginning on the |
|
effective date of this Act for the following strategies as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act), for infrastructure |
|
projects related to drainage, flood mitigation, or flood control |
|
and for necessary and reasonable expenses of the board in |
|
administering those projects: |
|
(1) $790,750,000 for Strategy A.4.1., Perform |
|
Community Assistance Related to NFIP; |
|
(2) $995,000 for Strategy D.1.1., Central |
|
Administration; and |
|
(3) $1,255,000 for Strategy D.1.2., Information |
|
Resources. |
|
(b) Contingent on Senate Bill No. 7 or similar legislation |
|
of the 86th Legislature, Regular Session, 2019, relating to flood |
|
control planning and the funding of flood planning, mitigation, and |
|
infrastructure projects becoming law and the constitutional |
|
amendment proposed by the 86th Legislature, Regular Session, 2019, |
|
providing for the creation of the flood infrastructure fund to |
|
assist in the financing of drainage, flood mitigation, and flood |
|
control projects being approved by the voters: |
|
(1) the appropriation of money made in Subsection (a) |
|
of this section has no effect; and |
|
(2) in addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, and in addition to |
|
other amounts appropriated by this Act, the following amounts are |
|
appropriated from the flood infrastructure fund to the Water |
|
Development Board for the two-year period beginning on the |
|
effective date of this Act for the following strategies as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act), for infrastructure |
|
projects related to drainage, flood mitigation, or flood control |
|
and for necessary and reasonable expenses of the board in |
|
administering those projects: |
|
(A) $790,750,000 for Strategy A.4.1., Perform |
|
Community Assistance Related to NFIP; |
|
(B) $995,000 for Strategy D.1.1., Central |
|
Administration; and |
|
(C) $1,255,000 for Strategy D.1.2., Information |
|
Resources. |
|
(c) Using money appropriated by Subsection (a) or (b) of |
|
this section, as applicable, the Water Development Board may employ |
|
9.0 full-time equivalent employees (FTEs) during the state fiscal |
|
year ending August 31, 2020, and 15.0 FTEs during the state fiscal |
|
year ending August 31, 2021, in addition to the number of FTEs the |
|
board is authorized by other law to employ during those state fiscal |
|
years to administer the project funding. |
|
SECTION 78. DEPARTMENT OF TRANSPORTATION: TRANSPORTATION |
|
INFRASTRUCTURE FUND. In addition to amounts previously |
|
appropriated for the state fiscal biennium ending August 31, 2019, |
|
$125,000,000 is appropriated from the economic stabilization fund |
|
to the Department of Transportation for the two-year period |
|
beginning on the effective date of this Act for Strategy A.1.8., |
|
Construction Grants and Services, as listed in Chapter 605 (S.B. |
|
1), Acts of the 85th Legislature, Regular Session, 2017 (the |
|
General Appropriations Act), to provide grants for transportation |
|
infrastructure projects under Subchapter C, Chapter 256, |
|
Transportation Code. |
|
SECTION 79. DEPARTMENT OF TRANSPORTATION: EMERGENCY AND |
|
FIRST RESPONDER AIRPORT FACILITIES. In addition to amounts |
|
previously appropriated for the state fiscal biennium ending August |
|
31, 2019, $5,000,000 is appropriated from the economic |
|
stabilization fund to the Department of Transportation for the |
|
two-year period beginning on the effective date of this Act to |
|
expand an airport hangar at the South Texas International Airport |
|
used by the Department of Public Safety for emergency and first |
|
responders, including facilities used for Department of Public |
|
Safety aircraft staging and storage purposes, under Strategy |
|
C.5.1., Aviation Services, as listed in Chapter 605 (S.B. 1), Acts |
|
of the 85th Legislature, Regular Session, 2017 (the General |
|
Appropriations Act). |
|
SECTION 80. DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS: |
|
AFFORDABLE RENTAL HOUSING IN CERTAIN AREAS AFFECTED BY NATURAL |
|
DISASTERS. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $4,000,000 is |
|
appropriated from the economic stabilization fund to the Department |
|
of Housing and Community Affairs for the two-year period beginning |
|
on the effective date of this Act for the provision of affordable |
|
rental housing in areas of the state most affected by natural |
|
disasters. |
|
SECTION 81. TEXAS WORKFORCE COMMISSION: EXPENSES RELATED TO |
|
HURRICANE HARVEY. In addition to amounts previously appropriated |
|
for the state fiscal biennium ending August 31, 2019, $8,931,385 is |
|
appropriated from the economic stabilization fund to the Texas |
|
Workforce Commission for the state fiscal year ending August 31, |
|
2019, for Strategy A.2.1., Vocational Rehabilitation, as listed in |
|
Chapter 605 (S.B. 1), Acts of the 85th Legislature, Regular |
|
Session, 2017 (the General Appropriations Act), for vocational |
|
rehabilitation services expenses related to Hurricane Harvey. |
|
SECTION 82. BOARD OF PHARMACY: PRESCRIPTION MONITORING |
|
PROGRAM. In addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $6,099,312 is |
|
appropriated from the general revenue fund to the Board of Pharmacy |
|
for the two-year period beginning on the effective date of this Act |
|
for statewide integration of and upgrades to the prescription |
|
monitoring program database under Strategy B.1.1., Enforcement, as |
|
listed in Chapter 605 (S.B. 1), Acts of the 85th Legislature, |
|
Regular Session, 2017 (the General Appropriations Act). |
|
SECTION 83. TEACHER RETIREMENT SYSTEM: ADDITIONAL PAYMENT. |
|
Contingent on compliance with the requirements regarding the |
|
amortization period of the unfunded actuarial liabilities of the |
|
Teacher Retirement System under Section 821.006, Government Code, |
|
in addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, $589,000,000 is appropriated from |
|
the economic stabilization fund to the Teacher Retirement System |
|
for the two-year period beginning on the effective date of this Act |
|
for the purpose of providing a one-time additional payment to |
|
certain annuitants. |
|
SECTION 84. TEACHER RETIREMENT SYSTEM: STATE CONTRIBUTION. |
|
Contingent on Senate Bill No. 12 or similar legislation of the 86th |
|
Legislature, Regular Session, 2019, relating to the contributions |
|
and benefits under the Teacher Retirement System becoming law, in |
|
addition to amounts previously appropriated for the state fiscal |
|
biennium ending August 31, 2019, the following amounts are |
|
appropriated from the economic stabilization fund to the Teacher |
|
Retirement System for the following periods for the purpose of |
|
immediately depositing that amount as a state contribution in the |
|
Teacher Retirement System Trust Account number 0960: |
|
(1) $263,000,000 for the state fiscal year ending |
|
August 31, 2020; and |
|
(2) $261,000,000 for the state fiscal year ending |
|
August 31, 2021. |
|
SECTION 85. COMPTROLLER OF PUBLIC ACCOUNTS: TEXAS |
|
INFRASTRUCTURE RESILIENCY FUND. (a) Contingent on Senate Bill |
|
No. 7 or similar legislation of the 86th Legislature, Regular |
|
Session, 2019, relating to flood control planning and the funding |
|
of flood planning, mitigation, and infrastructure projects |
|
becoming law, in addition to amounts previously appropriated for |
|
the state fiscal biennium ending August 31, 2019, $857,000,000 is |
|
appropriated from the economic stabilization fund to the |
|
comptroller of public accounts for the state fiscal year ending |
|
August 31, 2019, for the purpose of immediately depositing that |
|
amount to the credit of the Texas infrastructure resiliency fund. |
|
(b) Of the amount appropriated under Subsection (a) of this |
|
section, the comptroller of public accounts shall deposit at least |
|
$47,000,000 to the credit of the floodplain management account 0330 |
|
in the Texas infrastructure resiliency fund. |
|
SECTION 86. COMPTROLLER OF PUBLIC ACCOUNTS: FLOOD |
|
INFRASTRUCTURE FUND. Contingent on Senate Bill No. 7 or similar |
|
legislation of the 86th Legislature, Regular Session, 2019, |
|
relating to flood control planning and the funding of flood |
|
planning, mitigation, and infrastructure projects becoming law and |
|
the constitutional amendment proposed by the 86th Legislature, |
|
Regular Session, 2019, providing for the creation of the flood |
|
infrastructure fund to assist in the financing of drainage, flood |
|
mitigation, and flood control projects being approved by the |
|
voters, in addition to amounts previously appropriated for the |
|
state fiscal biennium ending August 31, 2019, $793,000,000 is |
|
appropriated from the economic stabilization fund to the |
|
comptroller of public accounts for the state fiscal year ending |
|
August 31, 2019, for the purpose of immediately depositing that |
|
amount to the credit of the flood infrastructure fund. |
|
SECTION 87. REIMBURSEMENT TO ECONOMIC STABILIZATION FUND. |
|
If any state agency or public institution of higher education |
|
receives reimbursement from the federal government, an insurer, or |
|
another source for an expenditure paid from money appropriated by |
|
this Act: |
|
(1) the agency or institution shall reimburse the |
|
state in an amount equal to the lesser of the amount appropriated |
|
under this Act and spent for that expenditure or the amount |
|
reimbursed by the other source for that expenditure; and |
|
(2) the comptroller of public accounts shall deposit |
|
the amount of the reimbursement to the credit of the economic |
|
stabilization fund. |
|
SECTION 88. EFFECTIVE DATE. (a) Subject to Subsections |
|
(b) and (c) of this section, this Act takes effect immediately. |
|
(b) Sections 1, 5, 7, 8, 9, 10, 16, 17, 20, 21, 31, 32, 33, |
|
35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 46, 47, 49, 52, 53, 54, 56, |
|
58, 59, 61, 65, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, |
|
81, 83, 84, 85, and 86 of this Act take effect only if this Act |
|
receives a vote of two-thirds of the members present in each house |
|
of the legislature, as provided by Section 49-g(m), Article III, |
|
Texas Constitution. |
|
(c) Section 45 of this Act takes effect only if this Act |
|
receives a vote of two-thirds of each house of the legislature, as |
|
provided by Section 17(j), Article VII, Texas Constitution. |
|
|
|
|
|
|
______________________________ |
______________________________ |
|
President of the Senate |
Speaker of the House |
|
|
I hereby certify that S.B. No. 500 passed the Senate on March 13, |
|
2019, by the following vote: Yeas 31, Nays 0; April 17, 2019, Senate |
|
refused to concur in House amendments and requested appointment of |
|
Conference Committee; April 18, 2019, House granted request of the |
|
Senate; May 26, 2019, Senate adopted Conference Committee Report by the |
|
following vote: Yeas 30, Nays 1; passed subject to the provisions of |
|
Article III, Section 49a, of the Constitution of Texas. |
|
|
|
|
______________________________ |
|
Secretary of the Senate |
|
|
I hereby certify that S.B. No. 500 passed the House, with |
|
amendments, on March 27, 2019, by the following vote: Yeas 149, |
|
Nays 0; April 18, 2019, House granted request of the Senate for |
|
appointment of Conference Committee; May 26, 2019, House adopted |
|
Conference Committee Report by the following vote: Yeas 146, Nays 1, |
|
one present not voting; passed subject to the provisions of |
|
Article III, Section 49a, of the Constitution of Texas. |
|
|
|
|
______________________________ |
|
Chief Clerk of the House |
|
|
|
|
|
Approved: |
|
I, Glenn Hegar, Comptroller of |
|
______________________________ Public Accounts, do hereby |
|
Date certify that the amounts |
|
appropriated in the herein |
|
S.B. No. 500, Regular Session, |
|
______________________________ 86th Legislature, are within the |
|
Governor amount estimated to be available |
|
in the affected fund. |
|
Certified _____________, 2019. |
|
|
|
______________________________ |
______________________________
|
Comptroller of Public Accounts |
Comptroller of Public Accounts