System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.
Amend Amendment No. 8 by Lucio to CSHB 11 on page 1 by striking lines 19-24 and substituting the following:
(b) The procedure for auditing emergency operations plans must:
(1) require an entity described by Subsection (a) to file an updated emergency operations plan if the Public Utility Commission of Texas finds that the entity's emergency operations plan on file does not contain adequate information to determinate whether the entity can provide adequate services during an emergency; and
(2) ensure that the plans will allow each generation facility in the plan to meet minimum reliability standards or guidelines adopted by the North American Electric Reliability Corporation in or before 2021.