Amend the floor amendment to CSHB 1556 by Tinderholt by striking lines 10-14 and substituting the following:
(2) commits to generate, onsite or through a secured contract for replacement power, at least 59 percent of the installed capacity of the facility during the highest 72 summer and winter load hours.