Amend CSSB 3 (house committee printing) as follows:
(1)  On page 45, line 5, between "SECTION 35." and "Not", insert "(a)".
(2)  On page 45, between lines 13 and 14, insert the following:
(b)  The Railroad Commission of Texas shall require a gas supply chain facility operator or gas pipeline facility operator, as applicable, to comply with the rules described by Subsection (a) of this section not later than six months after the effective date of those rules.
(3)  On page 45, line 14, between "SECTION 36." and "Not", insert "(a)".
(4)  On page 45, between lines 20 and 21, insert the following:
(b)  The Public Utility Commission of Texas shall require a municipally owned utility, electric cooperative, power generation company, exempt wholesale generator, or transmission and distribution utility, as applicable, to comply with the rules described by Subsection (a) of this section not later than six months after the effective date of those rules.