Amend CSSB 3 (senate committee printing), in SECTION 14 of the bill, in added Section 38.075, Utilities Code (page 8, between lines 9 and 10), by adding a new Subsection (f) to read as follows:
(f) After each load shedding event, the commission may conduct an examination of the implementation of load shedding, including whether each electric cooperative, municipally owned utility, and transmission and distribution utility complied with its plan as filed with the commission under Subsection (c)(2).