               A BILL TO BE ENTITLED
             | 
         
         
            | 
                
			 | 
            
               AN ACT
             | 
         
         
            | 
                
			 | 
            relating to the eligibility of land to continue to be appraised for  | 
         
         
            | 
                
			 | 
            ad valorem tax purposes as qualified open-space land if the land is  | 
         
         
            | 
                
			 | 
            temporarily used for sand mining operations; authorizing a fee. | 
         
         
            | 
                
			 | 
                   BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | 
         
         
            | 
                
			 | 
                   SECTION 1.  Subchapter D, Chapter 23, Tax Code, is amended by  | 
         
         
            | 
                
			 | 
            adding Section 23.527 to read as follows: | 
         
         
            | 
                
			 | 
                   Sec. 23.527.  TEMPORARY CESSATION OF AGRICULTURAL USE FOR  | 
         
         
            | 
                
			 | 
            SAND MINING OPERATION.  (a) In this section: | 
         
         
            | 
                
			 | 
                         (1)  "Commission" means the Texas Commission on  | 
         
         
            | 
                
			 | 
            Environmental Quality. | 
         
         
            | 
                
			 | 
                         (2)  "Executive director" means the executive director  | 
         
         
            | 
                
			 | 
            of the commission. | 
         
         
            | 
                
			 | 
                         (3)  "Marketable material" means sand mined and  | 
         
         
            | 
                
			 | 
            processed for sale. | 
         
         
            | 
                
			 | 
                         (4)  "Sand mining operation" means an aggregate  | 
         
         
            | 
                
			 | 
            production operation registered under Chapter 28A, Water Code, at  | 
         
         
            | 
                
			 | 
            which sand is removed or extracted.  | 
         
         
            | 
                
			 | 
                         (5)  "Unmarketable material" means material excavated  | 
         
         
            | 
                
			 | 
            or mined other than marketable material and includes surface soil,  | 
         
         
            | 
                
			 | 
            unmarketable sand, and overburden and interburden encountered  | 
         
         
            | 
                
			 | 
            during mining and processing operations. | 
         
         
            | 
                
			 | 
                   (b)  This section applies only to a sand mining operation  | 
         
         
            | 
                
			 | 
            that overlies the Carrizo Aquifer and is located within: | 
         
         
            | 
                
			 | 
                         (1)  30 miles of the boundary of a municipality with a  | 
         
         
            | 
                
			 | 
            population of more than 500,000; or | 
         
         
            | 
                
			 | 
                         (2)  one mile of a building in use as a single-family or  | 
         
         
            | 
                
			 | 
            multifamily residence. | 
         
         
            | 
                
			 | 
                   (c)  The measurement of distance for purposes of Subsection  | 
         
         
            | 
                
			 | 
            (b) shall be taken from the point on the sand mining operation that  | 
         
         
            | 
                
			 | 
            is nearest to the municipal boundary or residence toward the point  | 
         
         
            | 
                
			 | 
            on the municipal boundary or residence that is nearest to the sand  | 
         
         
            | 
                
			 | 
            mining operation. | 
         
         
            | 
                
			 | 
                   (d)  The eligibility of land for appraisal under this  | 
         
         
            | 
                
			 | 
            subchapter does not end because the land ceases to be devoted  | 
         
         
            | 
                
			 | 
            principally to agricultural use to the degree of intensity  | 
         
         
            | 
                
			 | 
            generally accepted in the area if: | 
         
         
            | 
                
			 | 
                         (1)  the owner of the land intends that the use of the  | 
         
         
            | 
                
			 | 
            land in that manner and to that degree of intensity be resumed; | 
         
         
            | 
                
			 | 
                         (2)  the land is used for a sand mining operation; and | 
         
         
            | 
                
			 | 
                         (3)  the land is reclaimed according to the standard  | 
         
         
            | 
                
			 | 
            best practices adopted under this section not later than the first  | 
         
         
            | 
                
			 | 
            anniversary of the date sand mining operations began on the land. | 
         
         
            | 
                
			 | 
                   (e)  The owner of land to which this section applies must  | 
         
         
            | 
                
			 | 
            notify the appraisal office in writing not later than the 30th day  | 
         
         
            | 
                
			 | 
            after the date sand mining operations begin on the land that the  | 
         
         
            | 
                
			 | 
            owner intends to ensure that the requirements of Subsection (d) are  | 
         
         
            | 
                
			 | 
            met. | 
         
         
            | 
                
			 | 
                   (f)  The commission by rule shall adopt standard best  | 
         
         
            | 
                
			 | 
            practices for reclamation of land used for a sand mining operation  | 
         
         
            | 
                
			 | 
            to be used for the purposes of this section.  The standards must: | 
         
         
            | 
                
			 | 
                         (1)  provide for the protection of surface water,  | 
         
         
            | 
                
			 | 
            groundwater, agricultural land, wildlife habitat, and wetlands; | 
         
         
            | 
                
			 | 
                         (2)  require reclamation to: | 
         
         
            | 
                
			 | 
                               (A)  occur concurrently with sand mining  | 
         
         
            | 
                
			 | 
            operations by managing the movement of marketable and unmarketable  | 
         
         
            | 
                
			 | 
            material encountered during the operations; and | 
         
         
            | 
                
			 | 
                               (B)  incorporate best practices adopted by the  | 
         
         
            | 
                
			 | 
            Natural Resources Conservation Service of the United States  | 
         
         
            | 
                
			 | 
            Department of Agriculture; | 
         
         
            | 
                
			 | 
                         (3)  include post-mining reclamation grade standards; | 
         
         
            | 
                
			 | 
                         (4)  establish slope stabilization requirements,  | 
         
         
            | 
                
			 | 
            including by grading perpendicular to the gradient; | 
         
         
            | 
                
			 | 
                         (5)  require unmarketable material from the land to be  | 
         
         
            | 
                
			 | 
            stockpiled on the land and used as backfill for site restoration; | 
         
         
            | 
                
			 | 
                         (6)  prohibit the inclusion of material not excavated  | 
         
         
            | 
                
			 | 
            from the land in the backfill used for site restoration; | 
         
         
            | 
                
			 | 
                         (7)  prohibit the stockpiling of unmarketable material  | 
         
         
            | 
                
			 | 
            at a horizontal to vertical slope greater than a 3 to 1 ratio; | 
         
         
            | 
                
			 | 
                         (8)  require surface soil removed during sand mining  | 
         
         
            | 
                
			 | 
            operations to be used as the uppermost layer of the final  | 
         
         
            | 
                
			 | 
            reclamation grade; | 
         
         
            | 
                
			 | 
                         (9)  require a reclaimed area to be left for successive  | 
         
         
            | 
                
			 | 
            vegetation growth after final reclamation grade standard best  | 
         
         
            | 
                
			 | 
            practices have been satisfied; and | 
         
         
            | 
                
			 | 
                         (10)  encourage the construction of ponds to catch  | 
         
         
            | 
                
			 | 
            runoff in locations that are outside critical runoff zones for  | 
         
         
            | 
                
			 | 
            rivers. | 
         
         
            | 
                
			 | 
                   (g)  The commission shall establish a process to allow an  | 
         
         
            | 
                
			 | 
            owner of land who submits a notice under Subsection (e) to obtain  | 
         
         
            | 
                
			 | 
            from the executive director a letter determining whether the land  | 
         
         
            | 
                
			 | 
            that is the subject of the notice was reclaimed according to the  | 
         
         
            | 
                
			 | 
            standard best practices adopted under this section in the time  | 
         
         
            | 
                
			 | 
            frame required under Subsection (d).  The owner must apply to the  | 
         
         
            | 
                
			 | 
            executive director for the determination not later than the 90th  | 
         
         
            | 
                
			 | 
            day after the first anniversary of the date sand mining operations  | 
         
         
            | 
                
			 | 
            began on the land. | 
         
         
            | 
                
			 | 
                   (h)  The executive director shall: | 
         
         
            | 
                
			 | 
                         (1)  send notice by regular mail or by electronic means  | 
         
         
            | 
                
			 | 
            to the chief appraiser of the appraisal district for the county in  | 
         
         
            | 
                
			 | 
            which the land is located that the owner has applied for a  | 
         
         
            | 
                
			 | 
            determination letter for the land; | 
         
         
            | 
                
			 | 
                         (2)  issue a letter to the owner stating the executive  | 
         
         
            | 
                
			 | 
            director's determination of whether the land has been reclaimed  | 
         
         
            | 
                
			 | 
            according to the standard best practices adopted under this section  | 
         
         
            | 
                
			 | 
            in the time frame required under Subsection (d); and | 
         
         
            | 
                
			 | 
                         (3)  send a copy of the determination letter by regular  | 
         
         
            | 
                
			 | 
            mail or by electronic means to the chief appraiser of the appraisal  | 
         
         
            | 
                
			 | 
            district for the county in which the land is located. | 
         
         
            | 
                
			 | 
                   (i)  Not later than the 20th day after the date of receipt of  | 
         
         
            | 
                
			 | 
            the letter issued by the executive director, the owner seeking the  | 
         
         
            | 
                
			 | 
            determination or the chief appraiser may appeal the executive  | 
         
         
            | 
                
			 | 
            director's determination to the commission. The commission shall  | 
         
         
            | 
                
			 | 
            consider the appeal at the next regularly scheduled meeting of the  | 
         
         
            | 
                
			 | 
            commission for which adequate notice may be given. The owner  | 
         
         
            | 
                
			 | 
            seeking the determination and the chief appraiser may testify at  | 
         
         
            | 
                
			 | 
            the meeting. The commission may remand the matter to the executive  | 
         
         
            | 
                
			 | 
            director for a new determination or deny the appeal and affirm the  | 
         
         
            | 
                
			 | 
            executive director's determination. On issuance of a new  | 
         
         
            | 
                
			 | 
            determination, the executive director shall issue a letter to the  | 
         
         
            | 
                
			 | 
            owner seeking the determination and provide a copy to the chief  | 
         
         
            | 
                
			 | 
            appraiser as provided by Subsection (h). A new determination of the  | 
         
         
            | 
                
			 | 
            executive director may be appealed to the commission in the manner  | 
         
         
            | 
                
			 | 
            provided by this subsection. A proceeding under this subsection is  | 
         
         
            | 
                
			 | 
            not a contested case for purposes of Chapter 2001, Government Code. | 
         
         
            | 
                
			 | 
                   (j)  The executive director shall issue a determination  | 
         
         
            | 
                
			 | 
            letter required by Subsection (h) to the owner seeking the  | 
         
         
            | 
                
			 | 
            determination, and the commission shall take final action on the  | 
         
         
            | 
                
			 | 
            initial appeal under Subsection (i) if an appeal is made, not later  | 
         
         
            | 
                
			 | 
            than the first anniversary of the date the executive director  | 
         
         
            | 
                
			 | 
            receives the request from the owner for the determination. | 
         
         
            | 
                
			 | 
                   (k)  The commission may charge an owner seeking a  | 
         
         
            | 
                
			 | 
            determination letter under this section a fee not to exceed its  | 
         
         
            | 
                
			 | 
            administrative costs for making the determination and issuing the  | 
         
         
            | 
                
			 | 
            letter required by this section. | 
         
         
            | 
                
			 | 
                   (l)  The chief appraiser shall accept a final determination  | 
         
         
            | 
                
			 | 
            by the executive director as conclusive evidence that land was  | 
         
         
            | 
                
			 | 
            reclaimed according to the standard best practices adopted under  | 
         
         
            | 
                
			 | 
            this section in the time frame required under Subsection (d). | 
         
         
            | 
                
			 | 
                   SECTION 2.  (a)  This section applies only to land on which a  | 
         
         
            | 
                
			 | 
            sand mining operation began before the effective date of this Act. | 
         
         
            | 
                
			 | 
                   (b)  Notwithstanding Section 23.527(e), Tax Code, as added  | 
         
         
            | 
                
			 | 
            by this Act, the eligibility of the land for appraisal under  | 
         
         
            | 
                
			 | 
            Subchapter D, Chapter 23, Tax Code, does not end because the land  | 
         
         
            | 
                
			 | 
            ceases to be devoted principally to agricultural use to the degree  | 
         
         
            | 
                
			 | 
            of intensity generally accepted in the area if: | 
         
         
            | 
                
			 | 
                         (1)  the owner of the land provides the notice required  | 
         
         
            | 
                
			 | 
            by Section 23.527(e), Tax Code, as added by this Act, not later than  | 
         
         
            | 
                
			 | 
            the 90th day after the effective date of this Act; and | 
         
         
            | 
                
			 | 
                         (2)  the chief appraiser of the appraisal district in  | 
         
         
            | 
                
			 | 
            which the land is located has not, as of the effective date of this  | 
         
         
            | 
                
			 | 
            Act, made a determination under Section 23.55, Tax Code, that a  | 
         
         
            | 
                
			 | 
            change in use of the land has occurred. | 
         
         
            | 
                
			 | 
                   SECTION 3.  This Act takes effect immediately if it receives  | 
         
         
            | 
                
			 | 
            a vote of two-thirds of all the members elected to each house, as  | 
         
         
            | 
                
			 | 
            provided by Section 39, Article III, Texas Constitution.  If this  | 
         
         
            | 
                
			 | 
            Act does not receive the vote necessary for immediate effect, this  | 
         
         
            | 
                
			 | 
            Act takes effect September 1, 2021. |