A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the winter weather emergency preparedness of facilities |
|
for providing electric service. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter A, Chapter 35, Utilities Code, is |
|
amended by adding Section 35.0025 to read as follows: |
|
Sec. 35.0025. WINTER WEATHER EMERGENCY PREPAREDNESS. (a) |
|
The commission by rule shall establish best practices and |
|
procedures for providers of generation in the ERCOT power region |
|
for: |
|
(1) winterization, including supplies, equipment, |
|
personnel, and preventative action checklists for preparations for |
|
extreme weather events; |
|
(2) plant design for new plants and modifications to |
|
existing plants to ensure the plants can operate at the lowest |
|
recorded ambient temperature for the nearest municipality for which |
|
historical data is available; |
|
(3) maintenance and inspections, especially of freeze |
|
protection elements; |
|
(4) heat tracing; |
|
(5) thermal insulation; |
|
(6) the erection of adequate windbreaks and |
|
enclosures; |
|
(7) annual winter-specific and plant-specific |
|
operator awareness and maintenance training; |
|
(8) prioritizing winter preparation each fall; |
|
(9) establishing personnel accountability and audit |
|
procedures; and |
|
(10) updating facility procedures at least annually as |
|
needed. |
|
(b) The commission by rule shall require each provider of |
|
generation in the ERCOT power region to: |
|
(1) prepare, submit to the commission, and update as |
|
necessary a plan for: |
|
(A) using the best practices and procedures to |
|
provide adequate electric generation service during a winter |
|
weather emergency; |
|
(B) conducting regular preventative maintenance |
|
for freeze protection elements; |
|
(C) inspecting freeze protection elements before |
|
and during the winter; |
|
(D) testing and evaluating freeze protection |
|
elements after winter to identify potential improvements, required |
|
maintenance, and any necessary component replacement; and |
|
(E) making any needed repairs or improvements |
|
before the next winter; and |
|
(2) implement the plan submitted under Subdivision |
|
(1). |
|
(c) The commission shall regularly inspect facilities of |
|
providers of generation for compliance with rules adopted under |
|
this section. |
|
SECTION 2. Subchapter D, Chapter 38, Utilities Code, is |
|
amended by adding Section 38.074 to read as follows: |
|
Sec. 38.074. WINTER WEATHER EMERGENCY PREPAREDNESS. (a) |
|
The commission by rule shall establish best practices and |
|
procedures for electric cooperatives, municipally owned utilities, |
|
and transmission and distribution utilities providing transmission |
|
or distribution service in the ERCOT power region for: |
|
(1) winterization, including supplies, equipment, |
|
personnel, and preventative action checklists for preparations for |
|
extreme weather events; |
|
(2) maintenance and inspections, especially of freeze |
|
protection elements; |
|
(3) heat tracing; |
|
(4) thermal insulation; |
|
(5) the erection of adequate windbreaks and |
|
enclosures; |
|
(6) annual winter-specific operator awareness and |
|
maintenance training; |
|
(7) prioritizing winter preparation each fall; |
|
(8) establishing personnel accountability and audit |
|
procedures; and |
|
(9) updating facility procedures at least annually as |
|
needed. |
|
(b) The commission by rule shall require each electric |
|
cooperative, municipally owned utility, and transmission and |
|
distribution utility providing transmission or distribution |
|
service in the ERCOT power region to: |
|
(1) prepare, submit to the commission, and update as |
|
necessary a plan for: |
|
(A) using the best practices and procedures to |
|
maintain service quality and reliability during a winter weather |
|
emergency; |
|
(B) conducting regular preventative maintenance |
|
for freeze protection elements; |
|
(C) inspecting freeze protection elements before |
|
and during the winter; |
|
(D) testing and evaluating freeze protection |
|
elements after winter to identify potential improvements, required |
|
maintenance, and any necessary component replacement; and |
|
(E) making any needed repairs or improvements |
|
before the next winter; and |
|
(2) implement the plan submitted under Subdivision |
|
(1). |
|
(c) The commission shall regularly inspect facilities of |
|
electric cooperatives, municipally owned utilities, and |
|
transmission and distribution utilities providing transmission or |
|
distribution service in the ERCOT power region for compliance with |
|
rules adopted under this section. |
|
SECTION 3. This Act takes effect September 1, 2021. |