A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the responsibility for ancillary services costs |
|
incurred for the operation of intermittent generation resources. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 35.004(e), Utilities Code, is amended to |
|
read as follows: |
|
(e) The commission shall ensure that ancillary services |
|
necessary to facilitate the transmission of electric energy are |
|
available at reasonable prices with terms and conditions that are |
|
not unreasonably preferential, prejudicial, discriminatory, |
|
predatory, or anticompetitive. The commission shall require, |
|
consistent with cost-causation principles, intermittent generation |
|
resources in the ERCOT power region to purchase ancillary services |
|
and replacement power sufficient to manage net load variability. |
|
In this subsection, "ancillary services" means services necessary |
|
to facilitate the transmission of electric energy including load |
|
following, standby power, backup power, reactive power, and any |
|
other services as the commission may determine by rule. On the |
|
introduction of customer choice in the ERCOT power region, |
|
acquisition of generation-related ancillary services on a |
|
nondiscriminatory basis by the independent organization in ERCOT on |
|
behalf of entities selling electricity at retail shall be deemed to |
|
meet the requirements of this subsection. |
|
SECTION 2. The Public Utility Commission of Texas shall |
|
adopt any rules required to implement Section 35.004(e), Utilities |
|
Code, as amended by this Act, not later than January 1, 2022. The |
|
commission shall ensure that the rules do not unreasonably impede |
|
or impair performance under contracts entered into before the |
|
effective date of this Act. |
|
SECTION 3. This Act takes effect September 1, 2021. |