A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the responsibility for ancillary services costs |
|
incurred for the operation of intermittent wind and solar |
|
resources. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 35.004(e), Utilities Code, is amended to |
|
read as follows: |
|
(e) The commission shall ensure that ancillary services |
|
necessary to facilitate the transmission of electric energy are |
|
available at reasonable prices with terms and conditions that are |
|
not unreasonably preferential, prejudicial, discriminatory, |
|
predatory, or anticompetitive. Ancillary services costs incurred |
|
by the ERCOT independent system operator to address reliability |
|
issues arising from the operation of intermittent wind and solar |
|
resources must be directly assigned by the ERCOT independent system |
|
operator to those resources. In this subsection, "ancillary |
|
services" means services necessary to facilitate the transmission |
|
of electric energy including load following, standby power, backup |
|
power, reactive power, and any other services as the commission may |
|
determine by rule. On the introduction of customer choice in the |
|
ERCOT power region, acquisition of generation-related ancillary |
|
services on a nondiscriminatory basis by the independent |
|
organization in ERCOT on behalf of entities selling electricity at |
|
retail shall be deemed to meet the requirements of this subsection. |
|
SECTION 2. The Public Utility Commission of Texas shall |
|
adopt any rules required to implement Section 35.004(e), Utilities |
|
Code, as amended by this Act, not later than January 1, 2022. |
|
SECTION 3. This Act takes effect September 1, 2021. |