BILL ANALYSIS

 

 

Senate Research Center

C.S.S.B. 1741

88R19342 DIO-D

By: Zaffirini

 

Transportation

 

3/29/2023

 

Committee Report (Substituted)

 

 

 

AUTHOR'S / SPONSOR'S STATEMENT OF INTENT

 

In 2014 the Legislature passed H.B. 2861 designating specific highways and roads as an overweight corridor for commercial trucks crossing the United States-Mexico border. Since that time, however, increased commerce has resulted in more transit to the Laredo-Colombia Solidarity International Bridge via routes that are not a part of the overweight corridor. This results in a highly inefficient process in which oversized loads are dividing their shipments among multiple trucks before crossing the border in Laredo.

 

S.B. 1741 would grant the City of Laredo permitting authority for overweight and overside along SH 255 between the Laredo-Colombia Solidarity International Bridge and its intersection with Farm-to-Market Road 1472, and Farm-to-Market Road 3338 between SH 255 and Farm-to-Market Road 1472. This change would reduce traffic congestion and promote the smoother cross-border commerce the Legislature intended, leading to reduced costs for companies and consumers.

 

(Original Author's/Sponsor's Statement of Intent)

 

C.S.S.B. 1741 amends current law relating to the route designation for the issuance of a permit for the movement of oversize and overweight vehicles in Webb County.

 

RULEMAKING AUTHORITY

 

This bill does not expressly grant any additional rulemaking authority to a state officer, institution, or agency.

 

SECTION BY SECTION ANALYSIS

 

SECTION 1. Amends Section 623.382(a), Transportation Code, as follows:

 

(a) Authorizes the Texas Transportation Commission to authorize the City of Laredo to issue permits for the movement of oversize or overweight vehicles carrying cargo in Webb County on the following roadways:

 

(1) makes no changes to this subdivision;

 

(2) Farm-to-Market Road 1472 between the northernmost of its intersections with World Trade Center Loop and its intersection with State Highway 255, rather than with Hachar Loop, if the Hachar Loop project in Webb County is constructed;

 

(3)-(4) makes nonsubstantive changes to these subdivisions;

 

(5) State Highway 255 between the Laredo-Colombia Solidarity International Bridge and its intersection with Interstate Highway 35; and

 

(6) Farm-to-Market Road 3338 between its intersection with State Highway 255 and its intersection with Farm-to-Market Road 1472.

 

SECTION 2. Effective date: September 1, 2023.