|
|
|
A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to an exemption from the severance tax for gas produced |
|
from certain wells that is consumed on site and would otherwise have |
|
been lawfully vented or flared. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter B, Chapter 201, Tax Code, is amended |
|
by adding Section 201.061 to read as follows: |
|
Sec. 201.061. EXEMPTION FOR GAS PRODUCED THAT WOULD |
|
OTHERWISE HAVE BEEN VENTED OR FLARED. (a) In this section: |
|
(1) "Commission" means the Railroad Commission of |
|
Texas. |
|
(2) "Qualifying well" means a well that: |
|
(A) is connected to a pipeline on which pipeline |
|
takeaway capacity is not expected to meet the demand for gas |
|
produced from the well; |
|
(B) is not connected to a pipeline and for which |
|
connection to a pipeline is technically or commercially unfeasible |
|
but is operated by a well operator who has contractually dedicated |
|
the well, the gas produced from the well, or the land or lease on |
|
which the well is located to a pipeline operator; or |
|
(C) is not connected to a pipeline and is |
|
operated by a well operator who has not contractually dedicated the |
|
well, the gas produced from the well, or the land or lease on which |
|
the well is located to a pipeline operator. |
|
(3) "Well operator" means the person responsible for |
|
the actual physical operation of an oil or gas well. |
|
(b) Gas produced from a qualifying well that is consumed on |
|
the well site and would otherwise have been lawfully vented or |
|
flared is not subject to the tax imposed by this chapter. |
|
(c) A well operator and a pipeline operator, as applicable, |
|
may apply to the commission in the manner provided by Subsection |
|
(d), (e), or (f), as applicable, for certification that a well is a |
|
qualifying well. |
|
(d) An application that relates to a well described by |
|
Subsection (a)(2)(A) must: |
|
(1) include an attestation that pipeline takeaway |
|
capacity is not expected to meet the demand for gas produced from |
|
the well; |
|
(2) be submitted jointly by the well operator and the |
|
pipeline operator; and |
|
(3) certify that the commission authorized gas from |
|
the well to be flared for at least 30 days during the year preceding |
|
the year in which the application is filed. |
|
(e) An application that relates to a well described by |
|
Subsection (a)(2)(B) must: |
|
(1) attest that: |
|
(A) the well is not connected to a pipeline; and |
|
(B) it is technically or commercially unfeasible |
|
to connect the well to a pipeline; |
|
(2) be submitted jointly by the well operator and the |
|
pipeline operator; and |
|
(3) certify that the commission authorized gas from |
|
the well to be flared for at least 30 days during the year preceding |
|
the year in which the application is filed. |
|
(f) An application that relates to a well described by |
|
Subsection (a)(2)(C) must: |
|
(1) attest that the well: |
|
(A) is not connected to a pipeline; and |
|
(B) is operated by a well operator who has not |
|
contractually dedicated the well, the gas produced from the well, |
|
or the land or lease on which the well is located to a pipeline |
|
operator; |
|
(2) be submitted by the well operator; and |
|
(3) certify that the commission authorized gas from |
|
the well to be flared for at least 30 days during the year preceding |
|
the year in which the application is filed. |
|
(g) The commission may require an applicant described by |
|
Subsection (c) to provide the commission with any information the |
|
commission determines is relevant to determining whether a well is |
|
a qualifying well. If the commission approves an application |
|
submitted under Subsection (c), the commission shall issue a |
|
certificate designating the well as a qualifying well. A |
|
certificate issued under this subsection expires one year after the |
|
date on which the commission issues the certificate. |
|
(h) A well described by Subsection (a)(2)(A) for which the |
|
commission issues a certificate under Subsection (g) must use all |
|
available pipeline takeaway capacity before consuming gas on the |
|
well site and receiving an exemption under this section. |
|
(i) To qualify for the exemption provided by this section, |
|
the person responsible for paying the tax imposed by this chapter |
|
must apply to the comptroller. The application must contain the |
|
certificate issued by the commission under Subsection (g). The |
|
comptroller may require a person applying for the exemption to |
|
provide any additional information the comptroller determines is |
|
relevant to determining whether the gas is eligible for the |
|
exemption. |
|
(j) The commission, well operator, or pipeline operator |
|
shall notify the comptroller in writing immediately if a well |
|
certified under this section is no longer a qualifying well. |
|
(k) The commission and the comptroller may adopt rules |
|
necessary to implement and administer this section. |
|
SECTION 2. The change in law made by this Act does not |
|
affect tax liability accruing before the effective date of this |
|
Act. That liability continues in effect as if this Act had not been |
|
enacted, and the former law is continued in effect for the |
|
collection of taxes due and for civil and criminal enforcement of |
|
the liability for those taxes. |
|
SECTION 3. This Act takes effect September 1, 2023. |