A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to a requirement that an applicant for a permit to drill an |
|
oil or gas well submit a gas capture plan for the well. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter F, Chapter 86, Natural Resources |
|
Code, is amended by adding Section 86.186 to read as follows: |
|
Sec. 86.186. GAS CAPTURE PLAN. (a) The commission may not |
|
issue a permit to drill, deepen, plug back, or reenter an oil or gas |
|
well unless the applicant submits with the application a gas |
|
capture plan to minimize flaring from the well. |
|
(b) The gas capture plan must include: |
|
(1) the volume of gas anticipated to be produced from |
|
the well annually, measured in thousands of cubic feet; |
|
(2) the volume of oil anticipated to be produced from |
|
the well annually, measured in barrels; |
|
(3) the volume of condensate anticipated to be |
|
produced from the well annually, measured in barrels; |
|
(4) a detailed map depicting each existing, planned, |
|
and anticipated gas gathering system in the general area of the |
|
well; |
|
(5) the following information with regard to the gas |
|
gathering system that the operator of the well has contracted to use |
|
or, if the operator has not entered into a contract, the gas |
|
gathering system that is closest to the well: |
|
(A) the name of the operator of the gas gathering |
|
system; |
|
(B) a description of the approximate route of the |
|
pipeline required to connect the well to the gas gathering system; |
|
(C) the distance in feet of the pipeline required |
|
to connect the well to the gas gathering system; |
|
(D) the volume of gas in thousands of cubic feet |
|
per day that the gas gathering system is capable of transporting; |
|
(E) the volume of gas in thousands of cubic feet |
|
per day that the gas gathering system is currently transporting; |
|
(F) the volume of gas in thousands of cubic feet |
|
per day that the gas gathering system is anticipated to be |
|
transporting on the date of first sale of gas from the well; |
|
(G) the reliability of the gas gathering system, |
|
including the average annual downtime of the system; and |
|
(H) the name and location of the gas processing |
|
plant that receives or is anticipated to receive gas from the gas |
|
gathering system; |
|
(6) any plans for expanding the gas gathering systems |
|
in the general area of the well; |
|
(7) any other issues affecting the gathering of gas in |
|
the general area of the well; |
|
(8) a plan for connecting the well to a gas gathering |
|
system, including: |
|
(A) a description of any potential right-of-way |
|
issues; |
|
(B) the schedule for constructing any necessary |
|
gas gathering facilities; |
|
(C) the date a gas gathering line will be |
|
available; |
|
(D) a statement of whether the gas gathering |
|
system described by Subdivision (5) has the capacity to accept the |
|
volume of gas anticipated to be produced from the well at the time |
|
of application for the permit; and |
|
(E) a description of any discussions the operator |
|
of the well has had with other upstream operators regarding the |
|
construction or availability of a gas gathering line; and |
|
(9) a description of any options available to the |
|
operator of the well for the beneficial use of gas from the well if |
|
the well cannot be connected to a gas gathering system, including: |
|
(A) on-site use of the gas; |
|
(B) the processing of liquids in the gas; |
|
(C) the use of the gas for electric power |
|
generation; |
|
(D) the conversion of the gas to liquid fuels; |
|
(E) the compression of the gas on the lease on |
|
which the well is located; |
|
(F) the reinjection of the gas for underground |
|
storage; |
|
(G) the reinjection of the gas for temporary |
|
storage; |
|
(H) the reinjection of the gas for enhanced oil |
|
recovery; and |
|
(I) shutting in the well, taking into account the |
|
effect of doing so on the reservoir as well as public health, |
|
safety, and the environment. |
|
SECTION 2. The change in law made by this Act applies only |
|
to a permit the application for which is filed with the Railroad |
|
Commission of Texas on or after the effective date of this Act. A |
|
permit the application for which is filed before the effective date |
|
of this Act is subject to the law in effect on the date the |
|
application is filed, and that law is continued in effect for that |
|
purpose. |
|
SECTION 3. This Act takes effect September 1, 2023. |