A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the approval of a certificate of public convenience and |
|
necessity for certain transmission projects. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 37.056, Utilities Code, is amended by |
|
amending Subsections (c-1) and (d) and adding Subsections (d-1) and |
|
(d-2) to read as follows: |
|
(c-1) In considering the need for additional service under |
|
Subsection (c)(2) for a reliability transmission project that |
|
serves the ERCOT power region, the commission must consider the |
|
historical load, forecasted load growth, and additional load |
|
currently seeking interconnection, including load for which the |
|
electric utility has yet to sign an interconnection agreement, as |
|
determined by the electric utility with the responsibility for |
|
serving the load. |
|
(d) The commission by rule shall establish criteria, in |
|
addition to the criteria described by Subsection (c), for granting |
|
a certificate for a transmission project that serves the ERCOT |
|
power region, that is not necessary to meet state or federal |
|
reliability standards, and that is not included in a plan developed |
|
under Section 39.904(g). [The criteria must include a comparison |
|
of the estimated cost of the transmission project for consumers and |
|
the estimated congestion cost savings for consumers that may result |
|
from the transmission project, considering both current and future |
|
expected congestion levels and the transmission project's ability |
|
to reduce those congestion levels.] The commission shall include |
|
with its decision on an application for a certificate to which this |
|
subsection applies findings on the criteria. The criteria must: |
|
(1) include a comparison of the estimated cost of the |
|
transmission project to consumers and the estimated congestion cost |
|
savings for consumers that may result from the project, considering |
|
both current and expected congestion levels and the project's |
|
ability to reduce those levels; |
|
(2) address: |
|
(A) other benefits of the transmission project, |
|
including deferral of reliability upgrade costs, reduction of |
|
transmission system losses, and reduction of operating reserve |
|
costs; |
|
(B) solutions to relieve generic transmission |
|
constraints; |
|
(C) potential for increasing transmission system |
|
reliability, resiliency, and operational flexibility; |
|
(D) potential for minimizing outage moratoria |
|
and transmission system congestion by employing planning criteria |
|
that include contingencies for a planned outage followed by an |
|
unplanned outage under peak conditions; and |
|
(E) the operational benefits and reduced impacts |
|
on affected landowners of constructing new transmission lines |
|
operating at or below 345 kilovolts as double circuit capable |
|
lines; |
|
(3) evaluate: |
|
(A) the costs of the transmission project on a |
|
levelized basis over the life of the project; and |
|
(B) the benefits of the transmission project on a |
|
levelized basis over the life of the project or the longest period |
|
determined to be reasonable by the commission; and |
|
(4) in high growth areas and areas experiencing or |
|
expected to experience rapid growth in power demand, including |
|
coastal regions, oil and gas producing, processing, or refining |
|
regions, and semiconductor manufacturing regions, prioritize the |
|
development of additional and sufficient transmission capacity to |
|
provide flexibility to serve new load. |
|
(d-1) For a transmission project described by Subsection |
|
(d), the commission shall require all new transmission lines |
|
operating at or below 345 kilovolts to be constructed as double |
|
circuit capable lines unless the electric utility requests an |
|
exception. |
|
(d-2) For a transmission project described by Subsection |
|
(d)(4), the applicant for the transmission project certificate |
|
shall submit a copy of the application to the independent |
|
organization certified under Section 39.151 for the ERCOT power |
|
region. The independent organization shall review and provide the |
|
commission with the organization's recommendations regarding the |
|
application not later than the 90th day after the date the |
|
application is received. If the organization fails to provide the |
|
commission with its recommendations before the 91st day after the |
|
date the application is received, the commission shall consider the |
|
transmission project to be a project that meets the need for |
|
additional service under this section. |
|
SECTION 2. Section 37.057, Utilities Code, is amended to |
|
read as follows: |
|
Sec. 37.057. DEADLINE FOR APPLICATION FOR NEW TRANSMISSION |
|
FACILITY. The commission must approve or deny an application for a |
|
certificate for a new transmission facility not later than the |
|
181st day after [the first anniversary of] the date the application |
|
is filed. If the commission does not approve or deny the |
|
application on or before that date, a party may seek a writ of |
|
mandamus in a district court of Travis County to compel the |
|
commission to decide on the application. |
|
SECTION 3. The changes in law made by this Act apply only to |
|
a proceeding affecting a certificate of public convenience and |
|
necessity that commences on or after the effective date of this Act. |
|
A proceeding affecting a certificate of public convenience and |
|
necessity that commenced before the effective date of this Act is |
|
governed by the law in effect on the date the proceeding is |
|
commenced, and that law is continued in effect for that purpose. |
|
SECTION 4. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2023. |