A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the security of the electricity supply chain. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 38.077, Utilities Code, is amended to |
|
read as follows: |
|
Sec. 38.077. RELIABILITY [LOAD SHEDDING] EXERCISES. (a) |
|
In this section, "critical facility" means a transmission |
|
substation and any associated control centers that, if rendered |
|
inoperable or damaged because of a physical attack, could cause |
|
widespread instability, uncontrolled separation, or cascading |
|
outages within an interconnection. |
|
(b) The commission and the independent organization |
|
certified for the ERCOT power region shall conduct simulated or |
|
tabletop load shedding exercises with providers of electric |
|
generation service and transmission and distribution service in the |
|
ERCOT power region. |
|
[(b)] The commission shall ensure that each year at least |
|
one simulated or tabletop exercise is conducted during a summer |
|
month and one simulated or tabletop exercise is conducted during a |
|
winter month. |
|
(c) The commission and the independent organization |
|
certified for the ERCOT power region shall conduct simulated or |
|
tabletop load shedding exercises with providers of electric |
|
generation service and transmission and distribution service in the |
|
ERCOT power region to mitigate and prepare for a threat of an attack |
|
or an actual physical attack on a critical facility. The exercises |
|
required by this subsection are in addition to the exercises |
|
required by Subsection (b) and any requirements of the North |
|
American Electric Reliability Corporation Critical Infrastructure |
|
Protection plan standards. The commission and the independent |
|
organization shall conduct the exercises under this subsection at |
|
least once every two years. |
|
(d) A simulated or tabletop load shedding exercise |
|
conducted under Subsection (c) must identify the roles and |
|
responsibilities of the following in the event of a threat of an |
|
attack or an actual physical attack on a critical facility: |
|
(1) transmission and distribution service providers; |
|
(2) law enforcement; |
|
(3) the independent organization certified for the |
|
ERCOT power region; and |
|
(4) the commission. |
|
(e) A transmission and distribution service provider is not |
|
required to disclose the specific location of the provider's |
|
critical substations to the commission or the independent |
|
organization certified for the ERCOT power region for the purposes |
|
of a simulated or tabletop load shedding exercise conducted under |
|
Subsection (c). |
|
SECTION 2. Subchapter F, Chapter 38, Utilities Code, is |
|
amended by adding Section 38.205 to read as follows: |
|
Sec. 38.205. PHYSICAL SECURITY OF CRITICAL FACILITIES. (a) |
|
In this section, "critical facility" means a transmission |
|
substation and any associated control center the inoperability of |
|
which could result in widespread instability, uncontrolled |
|
separation, or cascading outages within an interconnection. |
|
(b) The commission shall require each electric utility, |
|
electric cooperative, municipally owned utility, river authority |
|
that owns electric transmission assets, and transmission and |
|
distribution utility to provide to the chair of the committee the |
|
following information: |
|
(1) the location of any critical facility owned or |
|
operated by the utility, cooperative, or authority; |
|
(2) security measures in place to protect each |
|
critical facility against physical attack; and |
|
(3) contact information for the applicable utility, |
|
cooperative, or authority. |
|
(c) The chair of the committee may share information |
|
provided to the chair under Subsection (b) related to a physical |
|
attack or a threat of a physical attack on a critical facility with |
|
a law enforcement agency that has jurisdiction over the critical |
|
facility. |
|
(d) The chair of the committee shall provide the Department |
|
of Public Safety with access to the information provided to the |
|
chair of the committee under Subsection (b). |
|
(e) Information provided to the chair of the committee or |
|
the Department of Public Safety under this section is confidential |
|
under Section 418.181, Government Code, and not subject to |
|
disclosure under Chapter 552, Government Code. |
|
SECTION 3. Not later than December 31, 2024, the commission |
|
and the independent organization certified under Section 39.151, |
|
Utilities Code, for the ERCOT power region shall conduct a |
|
simulated or tabletop load shedding exercise with each provider of |
|
electric generation service and of transmission and distribution |
|
service as required by Section 38.077(c), Utilities Code, as added |
|
by this Act. |
|
SECTION 4. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2023. |