AN ACT
|
|
relating to funding mechanisms to support the construction, |
|
maintenance, modernization, and operation of electric generating |
|
facilities. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. This Act may be cited as the Powering Texas |
|
Forward Act. |
|
SECTION 2. Subtitle B, Title 2, Utilities Code, is amended |
|
by adding Chapter 34 to read as follows: |
|
CHAPTER 34. FACILITY FUNDING |
|
SUBCHAPTER A. TEXAS ENERGY FUND; GRANTS AND LOANS |
|
Sec. 34.0101. DEFINITIONS. In this subchapter: |
|
(1) "Advisory committee" means the Texas Energy Fund |
|
Advisory Committee. |
|
(2) "Fund" means the Texas energy fund established by |
|
Section 49-q, Article III, Texas Constitution. |
|
(3) "Trust company" means the Texas Treasury |
|
Safekeeping Trust Company. |
|
Sec. 34.0102. FUND. (a) The fund is a special fund in the |
|
state treasury outside the general revenue fund to be administered |
|
and used by the commission for the purposes authorized by this |
|
chapter. The commission may establish separate accounts in the |
|
fund. |
|
(b) The fund and the fund's accounts are kept and held by the |
|
trust company for and in the name of the commission. |
|
(c) Money deposited to the credit of the fund may be used |
|
only as provided by this chapter. |
|
(d) The fund consists of: |
|
(1) money appropriated, credited, transferred, or |
|
deposited to the credit of the fund by or as authorized by law, |
|
including money from any source transferred or deposited to the |
|
credit of the fund at the commission's discretion; |
|
(2) revenue that the legislature by statute dedicates |
|
for deposit to the credit of the fund; |
|
(3) investment earnings and interest earned on money |
|
in the fund; and |
|
(4) gifts, grants, and donations contributed to the |
|
fund. |
|
Sec. 34.0103. GRANTS FOR FACILITIES OUTSIDE ERCOT POWER |
|
REGION. (a) The commission may use money in the fund without |
|
further appropriation to provide grants to be used for transmission |
|
and distribution infrastructure and electric generating facilities |
|
in this state outside the ERCOT power region for: |
|
(1) facility modernization; |
|
(2) facility weatherization; |
|
(3) reliability and resiliency facility enhancements; |
|
or |
|
(4) vegetation management. |
|
(b) In evaluating an application for a grant under this |
|
section, the commission: |
|
(1) shall evaluate whether the project for which the |
|
grant is requested is reasonable; and |
|
(2) may consider any other appropriate factors. |
|
(c) Information submitted to the commission in an |
|
application for a grant under this section is confidential and not |
|
subject to disclosure under Chapter 552, Government Code. |
|
(d) Proceeds of a grant received under this section may not |
|
be used for: |
|
(1) compliance with weatherization standards adopted |
|
before December 1, 2023; or |
|
(2) debt payments. |
|
Sec. 34.0104. LOANS FOR ERCOT POWER REGION. (a) The |
|
commission may use money in the fund without further appropriation |
|
to provide loans to finance upgrades to existing dispatchable |
|
electric generating facilities providing power for the ERCOT power |
|
region that result in a net increase of at least 100 megawatts of |
|
capacity for each facility or the construction of dispatchable |
|
electric generating facilities providing power for the ERCOT power |
|
region that each have a generation capacity of at least 100 |
|
megawatts. For the purposes of this section, a generating facility |
|
is considered to be dispatchable if the facility's output can be |
|
controlled primarily by forces under human control. An electric |
|
energy storage facility is not eligible for a loan under this |
|
section. |
|
(b) The commission may provide a construction loan under |
|
this section only: |
|
(1) for construction of a facility that will have a |
|
generation capacity of at least 100 megawatts and that does not meet |
|
the planning model requirements necessary to be included in the |
|
Capacity Demand and Reserves Report of the independent organization |
|
certified under Section 39.151 for the ERCOT power region before |
|
June 1, 2023; |
|
(2) in an amount that does not exceed 60 percent of the |
|
estimated cost of the facility to be constructed; and |
|
(3) if the agreement ensures that the loan is to be the |
|
senior debt secured by the facility. |
|
(c) The commission shall evaluate an application for a loan |
|
under this section based on: |
|
(1) the applicant's: |
|
(A) quality of services and management; |
|
(B) efficiency of operations; |
|
(C) history of electricity generation operations |
|
in this state and this country; |
|
(D) resource operation attributes; |
|
(E) ability to address regional and reliability |
|
needs; |
|
(F) access to resources essential for operating |
|
the facility for which the loan is requested, such as land, water, |
|
and reliable infrastructure, as applicable; and |
|
(G) evidence of creditworthiness and ability to |
|
repay the loan on the terms established in the loan agreement, |
|
including the applicant's total assets, total liabilities, net |
|
worth, and credit ratings issued by major credit rating agencies; |
|
(2) the generation capacity and estimated costs of the |
|
project for which the loan is requested; and |
|
(3) any other factors the commission considers |
|
appropriate. |
|
(d) Outstanding loans provided under this section and |
|
grants provided under Section 34.0105, considered together, may not |
|
support the addition or construction of more than 10,000 megawatts |
|
of generation capacity. |
|
(e) An electric utility other than a river authority may not |
|
receive a loan under this section. |
|
(f) A loan provided under this section must: |
|
(1) have a term of 20 years; |
|
(2) be payable ratably starting on the third |
|
anniversary of the estimated commercial operation date of the |
|
facility for which the loan was provided, as stated in the loan |
|
application; and |
|
(3) bear an interest rate of three percent. |
|
(g) The commission shall require each recipient of a loan |
|
under this section to deposit in an escrow account held by the |
|
comptroller an amount of money equal to three percent of the |
|
estimated cost of the project for which the loan is provided. The |
|
deposit must be made before the initial loan funds are disbursed. |
|
The loan recipient may not withdraw the deposit unless authorized |
|
by the commission. |
|
(h) For money deposited under Subsection (g) for a loan for |
|
the construction of a new facility, the commission: |
|
(1) shall authorize the loan recipient to withdraw the |
|
deposit from the escrow account if the facility for which the loan |
|
was provided is interconnected in the ERCOT power region before the |
|
fourth anniversary of the date the initial loan funds were |
|
disbursed; or |
|
(2) after the fourth anniversary of the date the |
|
initial loan funds were disbursed, may authorize the loan recipient |
|
to withdraw the deposit from the escrow account if the facility for |
|
which the loan was provided is interconnected in the ERCOT power |
|
region not later than the fifth anniversary of the date the initial |
|
loan funds were disbursed and the commission determines that |
|
extenuating circumstances justify the delay in completion. |
|
(i) For money deposited under Subsection (g) for a loan for |
|
an upgrade to an existing facility, the commission: |
|
(1) shall authorize the loan recipient to withdraw the |
|
deposit from the escrow account if the project for which the loan |
|
was provided is completed before the third anniversary of the date |
|
the initial loan funds were disbursed; or |
|
(2) after the third anniversary of the date the |
|
initial loan funds were disbursed, may authorize the loan recipient |
|
to withdraw the deposit from the escrow account if the project for |
|
which the loan was provided is completed not later than the fourth |
|
anniversary of the date the initial loan funds were disbursed and |
|
the commission determines that extenuating circumstances justify |
|
the delay in completion. |
|
(j) The comptroller shall deposit to the credit of the fund |
|
any escrow funds described by Subsection (g) that the commission |
|
may not authorize to be withdrawn by a loan recipient. |
|
(k) Information submitted to the commission in an |
|
application for a loan under this section is confidential and not |
|
subject to disclosure under Chapter 552, Government Code. |
|
(l) The commission may not disburse the initial funds for a |
|
loan under this section after December 31, 2025. |
|
(m) This section expires September 1, 2050. |
|
Sec. 34.0105. COMPLETION BONUS GRANTS. (a) The commission |
|
shall provide, using money available in the fund for the purpose |
|
without further appropriation, a completion bonus grant for the |
|
construction of dispatchable electric generating facilities in the |
|
ERCOT power region. For the purposes of this section, a generating |
|
facility is considered to be dispatchable if the facility's output |
|
can be controlled primarily by forces under human control. An |
|
electric energy storage facility is not eligible for a grant under |
|
this section. |
|
(b) The amount of a grant under this section must be based on |
|
the megawatts of capacity provided to the ERCOT power region by the |
|
facility. |
|
(c) The commission may provide a grant under this section |
|
only for construction of a facility that: |
|
(1) will have a generation capacity of at least 100 |
|
megawatts; and |
|
(2) does not meet the planning model requirements |
|
necessary to be included in the Capacity Demand and Reserves Report |
|
of the independent organization certified under Section 39.151 for |
|
the ERCOT power region before June 1, 2023. |
|
(d) The commission shall evaluate an application for a grant |
|
under this section based on: |
|
(1) the applicant's: |
|
(A) quality of services and management; |
|
(B) efficiency of operations; |
|
(C) history of electricity generation operations |
|
in this state and this country; |
|
(D) resource operation attributes; and |
|
(E) ability to address regional and reliability |
|
needs; |
|
(2) the generation capacity and estimated |
|
construction costs of the facility for which the grant is |
|
requested; and |
|
(3) any other factors the commission considers |
|
appropriate. |
|
(e) Information submitted to the commission in an |
|
application for a grant under this section is confidential and not |
|
subject to disclosure under Chapter 552, Government Code. |
|
(f) Unless the commission determines that extenuating |
|
circumstances justify extending the deadlines provided by this |
|
subsection, the commission may not provide a grant under this |
|
section of more than: |
|
(1) $120,000 per megawatt of capacity provided by a |
|
facility that is interconnected in the ERCOT power region before |
|
June 1, 2026; or |
|
(2) $80,000 per megawatt of capacity provided by a |
|
facility that is interconnected in the ERCOT power region on or |
|
after June 1, 2026, and before June 1, 2029. |
|
(g) Unless the commission determines that extenuating |
|
circumstances justify extending the deadline provided by this |
|
subsection, the commission may not provide a grant under this |
|
section for a facility that is interconnected in the ERCOT power |
|
region on or after June 1, 2029. |
|
(h) The commission shall provide for the proceeds of each |
|
grant awarded under this section to be disbursed to the grant |
|
recipient by equal annual payments over a 10-year period that |
|
begins on the first anniversary of the commercial operations date |
|
of the facility for which the grant is provided. The annual |
|
payments are subject to being withheld or discounted in accordance |
|
with Subsection (i). The total of the annual disbursements may not |
|
exceed the maximum amount as limited by Subsection (f). |
|
(i) The commission by rule shall establish performance |
|
standards for grant recipients based on reliability metrics, |
|
appropriate for the types of facilities for which grants may be |
|
provided, for performance during the 100 hours with the least |
|
quantity of operating reserves for each year. The commission may |
|
not disburse a grant recipient's annual payment under Subsection |
|
(h) if the performance of the facility for which the grant was |
|
provided is equal to or below the median performance standard |
|
established under this subsection during a test period designated |
|
by the commission for that year. The commission may disburse a |
|
discounted amount of a grant recipient's annual payment under |
|
Subsection (h) if the performance of the facility for which the |
|
grant was provided is above the median performance standard |
|
established under this subsection during a test period designated |
|
by the commission for that year but less than an optimal performance |
|
standard established by the commission. The commission shall by |
|
rule adopt a system for determining the amount by which the |
|
commission will discount an annual payment based on facility |
|
performance under this subsection. |
|
(j) This section expires December 1, 2040. |
|
Sec. 34.0106. LOAN AND GRANT RESTRICTIONS. (a) If the |
|
commission has more than four pending applications for loans to be |
|
made from the fund on the date the commission awards a loan, the |
|
amount of the loan awarded may not exceed 25 percent of the fund |
|
balance on that date. |
|
(b) The commission may not provide a loan or a grant under |
|
this chapter: |
|
(1) for a facility that will be used primarily to serve |
|
an industrial load or private use network; or |
|
(2) for the construction or operation of a natural gas |
|
transmission pipeline. |
|
(c) The commission shall require each recipient of a loan |
|
under this chapter to enter into a debt covenant that requires the |
|
recipient to meet facility performance standards adopted by the |
|
commission. The commission by rule shall adopt performance |
|
standards for the purposes of this subsection based on reliability |
|
metrics appropriate for the types of facilities for which loans may |
|
be provided. |
|
(d) Each facility for which a loan or grant is provided |
|
under Section 34.0104 or 34.0105 must participate in the ERCOT |
|
wholesale electricity market. |
|
(e) The commission may provide from the fund: |
|
(1) for grants under Section 34.0103, not more than $1 |
|
billion; |
|
(2) for loans and grants under Sections 34.0104 and |
|
34.0105, not more than $7.2 billion; and |
|
(3) for grants or loans under Subchapter B, not more |
|
than $1.8 billion. |
|
Sec. 34.0107. MANAGEMENT AND INVESTMENT OF FUND. (a) The |
|
trust company shall hold and invest the fund, and any accounts |
|
established in the fund, for and in the name of the commission, |
|
taking into account the purposes for which money in the fund may be |
|
used. The fund may be invested with the state treasury pool and |
|
commingled with other investments. |
|
(b) The overall objective for the investment of the fund is |
|
to maintain sufficient liquidity to meet the needs of the fund while |
|
striving to preserve the purchasing power of the fund over a full |
|
economic cycle. |
|
(c) In managing the assets of the fund, the trust company |
|
may acquire, exchange, sell, supervise, manage, or retain any kind |
|
of investment that a prudent investor, exercising reasonable care, |
|
skill, and caution, would acquire or retain in light of the |
|
purposes, terms, distribution requirements, and other |
|
circumstances of the fund then prevailing, taking into |
|
consideration the investment of all the assets of the fund rather |
|
than a single investment. |
|
(d) The reasonable expenses of managing the fund's assets |
|
shall be paid from the fund. |
|
(e) The trust company annually shall provide a written |
|
report to the commission and to the advisory committee with respect |
|
to the investment of the fund. |
|
(f) The trust company shall adopt a written investment |
|
policy that is appropriate for the fund. The trust company shall |
|
present the investment policy to the investment advisory board |
|
established under Section 404.028, Government Code. The investment |
|
advisory board shall submit to the trust company recommendations |
|
regarding the policy. |
|
(g) The commission annually shall provide to the trust |
|
company a forecast of the cash flows into and out of the fund. The |
|
commission shall provide updates to the forecasts as appropriate to |
|
ensure that the trust company is able to achieve the objective |
|
specified by Subsection (b). |
|
(h) The trust company shall disburse money from the fund as |
|
directed by the commission. |
|
Sec. 34.0108. RECEIVERSHIP OF DEFAULT GENERATING FACILITY. |
|
(a) In this section, "default" means: |
|
(1) default in payment of the principal of or interest |
|
on a loan; or |
|
(2) a failure to perform any of the terms of a loan. |
|
(b) The state, including the commission, the advisory |
|
committee, and the trust company, may not retain an ownership |
|
interest in a project or facility for which a loan is provided under |
|
this chapter. |
|
(c) In the event of a default on a loan made under this |
|
chapter, at the request of the commission, the attorney general |
|
shall bring suit in a district court in Travis County for the |
|
appointment of a receiver to collect the assets and carry on the |
|
business of a loan recipient if the action is necessary to cure a |
|
default by the recipient. |
|
(d) The court shall vest a receiver appointed by the court |
|
with any power or duty the court finds necessary to cure the |
|
default, including the power or duty to: |
|
(1) perform audits; |
|
(2) direct ongoing operation of the assets; |
|
(3) fund reserve accounts; |
|
(4) make payments of the principal of or interest on |
|
bonds, securities, or other obligations; and |
|
(5) take any other action necessary to prevent or to |
|
remedy the default, including the sale of assets. |
|
(e) The receiver shall execute a bond in an amount to be set |
|
by the court to ensure the proper performance of the receiver's |
|
duties. |
|
(f) After appointment and execution of bond, the receiver |
|
shall take possession of the books, records, accounts, and assets |
|
of the defaulting loan recipient specified by the court. Until |
|
discharged by the court, the receiver shall perform the duties that |
|
the court directs and shall strictly observe the final order |
|
involved. |
|
(g) On a showing of good cause by the defaulting loan |
|
recipient, the court may dissolve the receivership. |
|
Sec. 34.0109. TEXAS ENERGY FUND ADVISORY COMMITTEE. (a) |
|
The advisory committee is composed of the following six members: |
|
(1) three members of the senate appointed by the |
|
lieutenant governor, including: |
|
(A) a member of the committee of the senate |
|
having primary jurisdiction over matters relating to the generation |
|
of electricity; and |
|
(B) a member of the committee of the senate |
|
having primary jurisdiction over finance; and |
|
(2) three members of the house of representatives |
|
appointed by the speaker of the house of representatives, |
|
including: |
|
(A) a member of the committee of the house of |
|
representatives having primary jurisdiction over the generation of |
|
electricity; and |
|
(B) a member of the committee of the house of |
|
representatives having primary jurisdiction over finance. |
|
(b) A member of the advisory committee serves at the will of |
|
the person who appointed the member. |
|
(c) The lieutenant governor shall appoint a co-presiding |
|
officer of the advisory committee from among the members appointed |
|
by the lieutenant governor. The speaker of the house of |
|
representatives shall appoint a co-presiding officer of the |
|
advisory committee from among the members appointed by the speaker. |
|
(d) The advisory committee may hold public hearings, formal |
|
meetings, and work sessions. Either co-presiding officer of the |
|
advisory committee may call a public hearing, formal meeting, or |
|
work session of the advisory committee at any time. The advisory |
|
committee may not take formal action at a public hearing, formal |
|
meeting, or work session unless a quorum of the committee is |
|
present. |
|
(e) Except as otherwise provided by this subsection, a |
|
member of the advisory committee is not entitled to receive |
|
compensation for service on the committee or reimbursement for |
|
expenses incurred in the performance of official duties as a member |
|
of the committee. Service on the advisory committee by a member of |
|
the senate or house of representatives is considered legislative |
|
service for which the member is entitled to reimbursement and other |
|
benefits in the same manner and to the same extent as for other |
|
legislative service. |
|
(f) The advisory committee: |
|
(1) may provide comments and recommendations to the |
|
commission for the commission to use in adopting rules regarding |
|
the use of the fund or on any other matter; and |
|
(2) shall review the overall operation, function, and |
|
structure of the fund at least semiannually. |
|
(g) The advisory committee may adopt rules, procedures, and |
|
policies as needed to administer this section and implement its |
|
responsibilities. |
|
(h) Chapter 2110, Government Code, does not apply to the |
|
size, composition, or duration of the advisory committee. |
|
(i) The advisory committee is subject to Chapter 325, |
|
Government Code (Texas Sunset Act). Unless continued in existence |
|
as provided by that chapter, the advisory committee is abolished |
|
September 1, 2035. |
|
Sec. 34.0110. RULES. (a) The commission by rule may |
|
establish procedures for: |
|
(1) the application for and award of a grant or loan |
|
under this chapter; and |
|
(2) the administration of the fund. |
|
(b) The commission shall give full consideration to |
|
comments and recommendations of the advisory committee. |
|
SUBCHAPTER B. TEXAS POWER PROMISE: BACKUP POWER PACKAGES |
|
Sec. 34.0201. DEFINITION. In this subchapter, "Texas |
|
backup power package" means a stand-alone, behind-the-meter, |
|
multiday backup power source that can be used for islanding. |
|
Sec. 34.0202. PURPOSE. The purpose of this subchapter is to |
|
facilitate and provide funding for the design, procurement, |
|
installation, and use of Texas backup power packages to ensure the |
|
reliability or adequacy of an electric power grid in this state for |
|
facilities on which communities rely for health, safety, and |
|
well-being. |
|
Sec. 34.0203. COMMISSION DUTIES. (a) The commission shall |
|
convene an advisory committee in the manner provided by Chapter |
|
2110, Government Code. |
|
(b) The advisory committee shall recommend criteria for the |
|
commission to employ in making a grant or loan under this |
|
subchapter. |
|
(c) The commission shall contract with a research entity |
|
that has experience in microgrid design to analyze critical |
|
facility characteristics and requirements in this state and develop |
|
for Texas backup power packages: |
|
(1) sets of specifications for standard backup power |
|
packages of various sizes that can serve most critical facilities |
|
in this state; and |
|
(2) specifications for standard interconnection, |
|
communications, and controls for Texas backup power packages. |
|
Sec. 34.0204. TEXAS BACKUP POWER PACKAGES. The commission |
|
may use money in the Texas energy fund without further |
|
appropriation to provide a grant or loan for the operation of a |
|
Texas backup power package that: |
|
(1) is engineered to minimize operation costs; |
|
(2) uses interconnection technology and controls that |
|
enable immediate islanding from the power grid and stand-alone |
|
operation for the host facility; |
|
(3) is capable of operating for at least 48 continuous |
|
hours without refueling or connecting to a separate power source; |
|
(4) is designed so that one or more Texas backup power |
|
packages can be aggregated on-site to serve not more than 2.5 |
|
megawatts of load at the host facility; |
|
(5) provides power sourced from: |
|
(A) a combination of natural gas or propane with |
|
photovoltaic panels and battery storage; or |
|
(B) battery storage on an electric school bus; |
|
and |
|
(6) is not used by the owner or host facility for the |
|
sale of energy or ancillary services. |
|
Sec. 34.0205. GRANTS AND LOANS. (a) The commission by rule |
|
may establish procedures for the application for and award of a |
|
grant or loan under this subchapter. |
|
(b) The amount of a grant provided under this subchapter may |
|
not exceed $500 per kilowatt of capacity. |
|
(c) The commission may provide a loan under this subchapter |
|
for procurement and operating costs. |
|
(d) The commission shall maintain and publish a list of |
|
approved vendors eligible to assist with the sale, installation, |
|
operation, and ongoing maintenance of Texas backup power packages. |
|
(e) The commission may not provide a grant or loan under |
|
this subchapter for: |
|
(1) a commercial energy system, a private school, or a |
|
for-profit entity that does not directly serve public safety and |
|
human health; or |
|
(2) a source of backup power that does not follow the |
|
design and use standards of a Texas backup power package. |
|
SECTION 3. Section 35.005, Utilities Code, is amended by |
|
adding Subsections (d), (e), (f), and (g) to read as follows: |
|
(d) This subsection applies only to a facility in the ERCOT |
|
power region for which a loan or grant is provided under Subchapter |
|
A, Chapter 34. The independent organization certified under |
|
Section 39.151 for the ERCOT power region shall work with electric |
|
utilities to ensure that each facility in the ERCOT power region for |
|
which a loan or grant is provided is fully interconnected in the |
|
region not later than the date the facility is ready for commercial |
|
operation. The independent organization certified under Section |
|
39.151 for the ERCOT power region shall give priority to |
|
interconnecting each facility for which a loan or grant is provided |
|
except that the organization shall prioritize transmission |
|
projects that the organization has formally designated as critical |
|
for reliability over a facility for which a loan or grant is |
|
provided. An electric utility that enters into an interconnection |
|
agreement for a facility for which a loan or grant is provided shall |
|
give priority to interconnecting the facility and complete |
|
construction of any other facilities necessary to interconnect the |
|
facility not later than the date the facility is ready for |
|
commercial operation except that the utility shall prioritize |
|
transmission projects that the independent organization certified |
|
under Section 39.151 for the ERCOT power region has formally |
|
designated as critical for reliability over a facility for which a |
|
loan or grant is provided. |
|
(e) If the commission receives an application under Chapter |
|
37 for a certificate of convenience and necessity related to |
|
facilities necessary to interconnect a facility to which Subsection |
|
(d) applies and does not approve the application before the 90th day |
|
after the date the commission received the application, the |
|
deadline established by Subsection (d) is extended one day for each |
|
day after the 90th day in which the commission does not approve the |
|
application. |
|
(f) The commission may extend the deadline established by |
|
Subsection (d) after notice, hearing, and a determination on a |
|
showing of good cause that fully interconnecting the facility |
|
before the deadline is not feasible. |
|
(g) In this subsection, "Texas backup power package" has the |
|
meaning assigned by Section 34.0201. The commission by rule shall |
|
adopt procedures to expedite an electric utility interconnection |
|
request for a Texas backup power package for which a loan or grant |
|
is awarded under Chapter 34. |
|
SECTION 4. Subchapter C, Chapter 382, Health and Safety |
|
Code, is amended by adding Section 382.069 to read as follows: |
|
Sec. 382.069. TEXAS BACKUP POWER PACKAGE. (a) In this |
|
section, "Texas backup power package" has the meaning assigned by |
|
Section 34.0201, Utilities Code. |
|
(b) The commission by rule shall adopt a process to expedite |
|
the permitting of a Texas backup power package for which a permit is |
|
required under this chapter and for which a loan or grant is awarded |
|
under Chapter 34, Utilities Code. |
|
SECTION 5. Not later than June 1, 2024, the Public Utility |
|
Commission of Texas shall begin accepting loan applications for |
|
loans authorized by Subchapter A, Chapter 34, Utilities Code, as |
|
added by this Act. Not later than December 31, 2025, the Public |
|
Utility Commission of Texas shall approve or deny each loan |
|
application and disburse initial loan funds for each approved |
|
applicant. |
|
SECTION 6. This Act takes effect on the date on which the |
|
constitutional amendment proposed by the 88th Legislature, Regular |
|
Session, 2023, providing for the creation of the Texas energy fund |
|
to support the construction, maintenance, modernization, and |
|
operation of electric generating facilities takes effect. If that |
|
amendment is not approved by the voters, this Act has no effect. |
|
|
|
|
|
|
|
|
|
|
______________________________ |
______________________________ |
|
President of the Senate |
Speaker of the House |
|
|
I hereby certify that S.B. No. 2627 passed the Senate on |
|
May 4, 2023, by the following vote: Yeas 27, Nays 4; |
|
May 25, 2023, Senate refused to concur in House amendments and |
|
requested appointment of Conference Committee; May 26, 2023, House |
|
granted request of the Senate; May 28, 2023, Senate adopted |
|
Conference Committee Report by the following vote: Yeas 30, |
|
Nays 1. |
|
|
|
|
______________________________ |
|
Secretary of the Senate |
|
|
I hereby certify that S.B. No. 2627 passed the House, with |
|
amendments, on May 23, 2023, by the following vote: Yeas 118, |
|
Nays 23, one present not voting; May 26, 2023, House granted |
|
request of the Senate for appointment of Conference Committee; |
|
May 28, 2023, House adopted Conference Committee Report by the |
|
following vote: Yeas 114, Nays 20, two present not voting. |
|
|
|
|
______________________________ |
|
Chief Clerk of the House |
|
|
|
|
|
Approved: |
|
|
|
______________________________ |
|
Date |
|
|
|
|
|
______________________________ |
|
Governor |