Amend CSSB 6 (senate committee report) as follows:
(1) In SECTION 1 of the bill, in added Section 35.004(c-1), Utilities Code (page 1, line 31), strike "transmission" and substitute "utility's".
(2) In SECTION 1 of the bill, in added Section 35.004(c-2), Utilities Code (page 1, lines 36-37), strike "to the transmission system".
(3) In SECTION 2 of the bill, in added Section 37.0561(a), Utilities Code (page 1, line 45), between "costs" and the underlined period, insert "and maintaining system reliability".
(4) In SECTION 2 of the bill, in added Section 37.0561(c), Utilities Code (page 1, line 60, through page 2, line 1), strike "not require project specific" and substitute "withhold or anonymize competitively sensitive".
(5) In SECTION 2 of the bill, in added Section 37.0561(f), Utilities Code (page 2, line 47), strike "where the load will be located" and substitute "for the proposed load location".
(6) In SECTION 2 of the bill, in added Section 37.0561(h), Utilities Code (page 2, lines 67-69), strike "as the large load customer meets the customer's load ramp milestones and sustains operations for a prescribed period as determined by the commission" and substitute:
after the security is applied to any outstanding amounts owed:
(1) as the large load customer meets the customer's load ramp milestones and sustains operations for a prescribed period as determined by the commission; or
(2) if the large load customer withdraws the customer's request for all or a portion of the requested capacity
(7) In SECTION 2 of the bill, in added Section 37.0561(i), Utilities Code (page 3, line 1), between "must" and "allow", insert "establish a procedure to".
(8) In SECTION 2 of the bill, in added Section 37.0561(i), Utilities Code (page 3, line 3), strike "from" and substitute "by".
(9) In SECTION 2 of the bill, in added Section 37.0561(i), Utilities Code (page 3, lines 4 and 5), strike ", using procedures established by the commission,".
(10) In SECTION 2 of the bill, in added Section 37.0561, Utilities Code (page 3, between lines 14 and 15), insert the following:
(k) Notwithstanding the forecasted load growth and additional load currently seeking interconnection required to be considered under Section 37.056(c-1), the commission by rule shall establish criteria by which the independent organization certified under Section 39.151 for the ERCOT power region includes forecasted large load of any peak demand in the organization's transmission planning and resource adequacy models and reports.
(11) In SECTION 4 of the bill, in added Section 39.169(f), Utilities Code (page 4, line 2), strike "electric utility" and substitute "electric cooperative, electric utility,".
(12) In SECTION 4 of the bill, in added Section 39.170(b), Utilities Code (page 4, lines 24 and 25), strike "in advance of an anticipated energy emergency alert event" and substitute "in the event of an anticipated emergency condition".
(13) In SECTION 6 of the bill (page 5, line 5), strike "made" and substitute "agreement entered into".