  relating to the time frame required for excavation notification.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Section 251.002, Utilities Code, is amended by
  amending Subdivision (1) and adding Subdivision (1-a) to read as
  follows:
               (1)  "Business day" means a day other than:
                     (A)  a Saturday or Sunday; or
                     (B)  a legal holiday.
               (1-a) "Class A underground facility" means an
  underground facility that is used to produce, store, convey,
  transmit, or distribute:
                     (A)  electrical energy;
                     (B)  natural or synthetic gas;
                     (C)  petroleum or petroleum products;
                     (D)  steam;
                     (E)  any form of telecommunications service,
  including voice, data, video, or optical transmission, or cable
  television service; or
                     (F)  any other liquid, material, or product not
  defined as a Class B underground facility.
         SECTION 2.  Section 251.151(a), Utilities Code, is amended
  to read as follows:
         (a)  Except as provided by Sections 251.155 and 251.156, a
  person who intends to excavate shall notify a notification center
  not earlier than the 14th business day or later than the 3rd
  business day before the date the excavation is to begin [or later
  than the 48th hour before the time the excavation is to begin,
  excluding Saturdays, Sundays, and legal holidays].
         SECTION 3.  Sections 251.157(a) and (d), Utilities Code, are
  amended to read as follows:
         (a)  Each Class A underground facility operator contacted by
  the notification system shall mark the approximate location of its
  underground facilities at or near the site of the proposed
  excavation if the operator believes that marking the location is
  necessary. The operator shall mark the location not later than:
               (1)  11:59 p.m. on the second business day [48th hour]
  after the date [time] the excavator gives to the notification
  system notice of intent to excavate[, excluding Saturdays, Sundays,
  and legal holidays]; or
               (2)  [11:59 a.m. on the Tuesday following a Saturday
  notification unless the intervening Monday is a holiday;
               [(3)  11:59 a.m. on the Wednesday following a Saturday
  notification if the intervening Monday is a holiday; or
               [(4)]  a time agreed to by the operator and the
  excavator.
         (d)  Not later than 11:59 p.m. on the second business day
  [48th hour] after the date [time] the excavator gives to the
  notification center notice of intent to excavate, an operator
  contacted by the notification center shall notify the excavator of
  the operator's plans to not mark the proximate location of an
  underground facility at or near the site of the proposed
  excavation.  The operator must provide the notification by e-mail
  or facsimile or by another verifiable electronic method approved by
  the board.
         SECTION 4.  The following provisions of the Utilities Code
  are repealed:
               (1)  Section 251.002(14); and
               (2)  Section 251.151(b).
         SECTION 5.  This Act takes effect September 1, 2025.