89R13572 SCL-D
 
  By: Money H.B. No. 4007
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the authority of a county to adopt subdivision
  requirements that include reasonable specifications for lot size,
  setback lines, and side lot lines.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Section 232.003, Local Government Code, is
  amended to read as follows:
         Sec. 232.003.  SUBDIVISION REQUIREMENTS.  By an order
  adopted and entered in the minutes of the commissioners court, and
  after a notice is published in a newspaper of general circulation in
  the county, the commissioners court may:
               (1)  require a right-of-way on a street or road that
  functions as a main artery in a subdivision, of a width of not less
  than 50 feet or more than 100 feet;
               (2)  require a right-of-way on any other street or road
  in a subdivision of not less than 40 feet or more than 70 feet;
               (3)  require that the shoulder-to-shoulder width on
  collectors or main arteries within the right-of-way be not less
  than 32 feet or more than 56 feet, and that the shoulder-to-shoulder
  width on any other street or road be not less than 25 feet or more
  than 35 feet;
               (4)  adopt, based on the amount and kind of travel over
  each street or road in a subdivision, reasonable specifications
  relating to the construction of each street or road;
               (5)  adopt reasonable specifications to provide
  adequate drainage for each street or road in a subdivision in
  accordance with standard engineering practices;
               (6)  require that each purchase contract made between a
  subdivider and a purchaser of land in the subdivision contain a
  statement describing the extent to which water will be made
  available to the subdivision and, if it will be made available, how
  and when;
               (7)  require that the owner of the tract to be
  subdivided execute a good and sufficient bond in the manner
  provided by Section 232.004;
               (8)  adopt reasonable specifications that provide for
  drainage in the subdivision to:
                     (A)  efficiently manage the flow of stormwater
  runoff in the subdivision; and
                     (B)  coordinate subdivision drainage with the
  general storm drainage pattern for the area; [and]
               (9)  require lot and block monumentation to be set by a
  registered professional surveyor before recordation of the plat;
  and
               (10)  adopt reasonable specifications for lot size,
  setback lines, and side lot lines.
         SECTION 2.  This Act takes effect immediately if it receives
  a vote of two-thirds of all the members elected to each house, as
  provided by Section 39, Article III, Texas Constitution.  If this
  Act does not receive the vote necessary for immediate effect, this
  Act takes effect September 1, 2025.