A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the use of grid enhancing technologies and |
|
high-performance conductors in the ERCOT power region. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter E, Chapter 36, Utilities Code, is |
|
amended by adding Section 36.216 to read as follows: |
|
Sec. 36.216. GRID ENHANCING TECHNOLOGIES AND |
|
HIGH-PERFORMANCE CONDUCTORS. (a) In this section: |
|
(1) "Advanced power flow controller" means hardware |
|
and software used to reroute electric energy from overloaded |
|
transmission lines to underutilized transmission corridors by |
|
adjusting circuit impedance. |
|
(2) "Dynamic line rating system" means hardware or |
|
software used to calculate the true capacity of transmission lines |
|
using real-time and forecasted weather conditions. |
|
(3) "Grid enhancing technology" means any hardware or |
|
software technology that enables enhanced or more efficient |
|
performance from the electric transmission system, including a |
|
dynamic line rating system, advanced power flow controller |
|
technology, dynamic contingency response, or a topology |
|
optimization system or another technology identified by the |
|
independent organization certified under Section 39.151 for the |
|
ERCOT power region. |
|
(4) "High-performance conductors" means modern |
|
conductor technologies, including carbon and composite core |
|
conductors and carbon and composite superconductors, with greater |
|
performance characteristics than aluminum-conductor |
|
steel-reinforced conductors, such as increased capacity, higher |
|
efficiency, and reduced or no thermal sag. |
|
(5) "Topology optimization system" means software |
|
technology that identifies reconfigurations of the transmission |
|
grid to reroute electric energy from overloaded lines to |
|
underutilized corridors. |
|
(b) The commission shall ensure that the independent |
|
organization certified under Section 39.151, Utilities Code, for |
|
the ERCOT power region considers the technical feasibility and |
|
cost-effectiveness using of grid enhancing technologies and |
|
high-performance conductors in its evaluation of economic and |
|
reliability projects during annual regional transmission planning |
|
to increase transmission capacity, reduce transmission system |
|
congestion, increase electric reliability, and reduce the risk of |
|
wildfires. The independent organization may decline to recommend |
|
the use of grid enhancing technologies in a particular instance it |
|
determines that it would not be prudent. |
|
SECTION 2. (a) The Public Utility Commission of Texas shall |
|
adopt any necessary rules required by Section 36.216, Utilities |
|
Code, as added by this Act, not later than January 1, 2026. |
|
SECTION 3. This Act takes effect September 1, 2025. |