A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to requiring backup generation at certain wastewater |
|
treatment facilities. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Subchapter B, Chapter 26, Water Code, is amended |
|
by adding Section 26.054 to read as follows: |
|
Sec. 26.054. STANDARDS OF EMERGENCY OPERATIONS FOR PACKAGE |
|
PLANT. (a) In this section: |
|
(1) "Emergency operations" means the operation of a |
|
package plant during an extended power outage that impacts the |
|
package plant. |
|
(2) "Extended power outage" means a power outage |
|
lasting for more than 24 hours. |
|
(3) "Package plant" means a pre-manufactured |
|
wastewater treatment facility with a capacity of less than 500,000 |
|
gallons per day. The term includes an extended aeration plant, |
|
sequencing batch reactor, or oxidation ditch. |
|
(b) The operator of a package plant shall: |
|
(1) ensure the emergency operation of the package |
|
plant during an extended power outage as soon as safe and |
|
practicable following the occurrence of a natural disaster; and |
|
(2) adopt and submit to the commission for its |
|
approval: |
|
(A) an emergency preparedness plan that |
|
demonstrates the operator's ability to provide the emergency |
|
operations described by Subdivision (1); and |
|
(B) a timeline for implementing the plan |
|
described by Paragraph (A). |
|
(c) The commission shall review an emergency preparedness |
|
plan submitted under Subsection (b). If the commission determines |
|
that the plan is not acceptable, the commission shall recommend |
|
changes to the plan. The commission must make its recommendations |
|
on or before the 90th day after the date the commission receives the |
|
plan. In accordance with commission rules, an emergency |
|
preparedness plan for a package plant shall provide for one or more |
|
of the following: |
|
(1) the maintenance of automatically starting |
|
auxiliary generators; |
|
(2) the sharing of auxiliary generator capacity with |
|
one or more operators of wastewater treatment facilities affected |
|
by an extended power outage, including through participation in a |
|
statewide mutual aid program; |
|
(3) the negotiation of leasing and contracting |
|
agreements, including emergency mutual aid agreements with other |
|
operators of wastewater treatment facilities, if the agreements |
|
provide for coordination with the division of emergency management |
|
in the governor's office; |
|
(4) the use of portable generators capable of serving |
|
multiple facilities equipped with quick-connect systems; |
|
(5) the use of on-site electrical generation or |
|
distributed generation facilities; |
|
(6) hardening the electric transmission and |
|
distribution system serving the package plant; |
|
(7) emergency wastewater treatment service capacity |
|
rules to maintain emergency operations; or |
|
(8) any other alternative determined by the commission |
|
to be acceptable. |
|
(d) Each operator of a package plant shall include in the |
|
package plant's emergency preparedness plan under Subsection (b) |
|
provisions for demonstrating the capability of the package plant to |
|
provide wastewater treatment service to its customers during |
|
emergencies. This subsection does not apply to wastewater |
|
treatment services that are unnecessary or otherwise subject to |
|
interruption or curtailment during emergencies under a contract. |
|
(e) The commission shall adopt rules to implement this |
|
section. |
|
(f) The commission shall provide an operator of a package |
|
plant with access to the commission's financial, managerial, and |
|
technical contractors to assist the operator in complying with the |
|
applicable emergency preparedness plan submission deadline. |
|
(g) The commission by rule shall create an emergency |
|
preparedness plan template for use by an operator of a package plant |
|
when submitting a plan under this section. The emergency |
|
preparedness plan template shall contain: |
|
(1) a list and explanation of the preparations an |
|
operator of a package plant may make under Subsection (c) for the |
|
commission to approve the package plant's emergency preparedness |
|
plan; and |
|
(2) a list of all commission rules and standards |
|
pertaining to emergency preparedness plans. |
|
(h) An emergency generator used as part of an approved |
|
emergency preparedness plan under Subsection (c) must be operated |
|
and maintained according to the manufacturer's specifications. |
|
(i) The commission shall inspect each package plant to |
|
ensure that the operator of the package plant complies with the |
|
approved plan. |
|
(j) The commission shall consider whether compliance with |
|
this section will cause a significant financial burden on customers |
|
of an operator of a package plant. |
|
(k) An operator of a package plant may adopt and enforce |
|
limitations on wastewater treatment service while the package plant |
|
is providing emergency operations. |
|
(l) Except as specifically required by this section, |
|
information provided by an operator of a package plant under this |
|
section is confidential and is not subject to disclosure under |
|
Chapter 552, Government Code. |
|
(m) The commission shall coordinate with the Public Utility |
|
Commission of Texas in the administration of this section. |
|
SECTION 2. (a) Not later than January 1, 2026, the Texas |
|
Commission on Environmental Quality shall adopt rules necessary to |
|
implement Section 26.054, Water Code, as added by this Act. |
|
(b) Not later than May 1, 2026, each operator of a package |
|
plant shall submit to the Texas Commission on Environmental Quality |
|
the emergency preparedness plan required by Section 26.054, Water |
|
Code, as added by this Act. |
|
(c) Not later than September 1, 2026, or upon final approval |
|
by the Texas Commission on Environmental Quality, each operator of |
|
a package plant shall implement the emergency preparedness plan |
|
required by Section 26.054, Water Code, as added by this Act. |
|
SECTION 3. This Act takes effect September 1, 2025. |