|
|
|
A BILL TO BE ENTITLED
|
|
AN ACT
|
|
relating to the operation of a cement kiln and the production of |
|
aggregates near a semiconductor wafer manufacturing facility. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Chapter 382, Health and Safety Code, is amended |
|
by adding Subchapters M and M-1 to read as follows: |
|
SUBCHAPTER M. CEMENT PRODUCTION AND SEMICONDUCTOR WAFER |
|
MANUFACTURING FACILITY |
|
Sec. 382.601. DEFINITIONS. In this subchapter: |
|
(1) "Portland cement kiln" means a system, including |
|
any solid, gaseous, or liquid fuel combustion equipment, used to |
|
calcine and fuse raw materials, including limestone and clay, to |
|
produce portland cement clinker. |
|
(2) "Semiconductor wafer manufacturing facility" |
|
means a manufacturing facility that conducts any of the following |
|
processes with respect to semiconductor production: |
|
(A) growing single-crystal ingots or boules; |
|
(B) wafer slicing; |
|
(C) etching and polishing; |
|
(D) bonding; |
|
(E) cleaning; |
|
(F) epitaxial deposition; or |
|
(G) metrology. |
|
Sec. 382.602. LIMITATION OF LIABILITY. An owner or |
|
operator of a facility operating under a new source review permit |
|
issued under this chapter that authorizes the operation of a |
|
portland cement kiln is not liable for damages to a semiconductor |
|
wafer manufacturing facility resulting from seismic or vibrational |
|
disturbances caused by the cement facility owner or operator's |
|
activities on the site of the cement facility if the cement facility |
|
began operating before the date the semiconductor wafer |
|
manufacturing facility began operating. |
|
SUBCHAPTER M-1. CEMENT PRODUCTION AND SEMICONDUCTOR WAFER |
|
MANUFACTURING FACILITY PILOT PROGRAM: GRAYSON COUNTY |
|
Sec. 382.651. DEFINITIONS. In this subchapter: |
|
(1) "Aggregate production operation" has the meaning |
|
assigned by Section 28A.001, Water Code. |
|
(2) "Bureau" means the Bureau of Economic Geology of |
|
The University of Texas at Austin. |
|
(3) "Portland cement kiln" means a system, including |
|
any solid, gaseous, or liquid fuel combustion equipment, used to |
|
calcine and fuse raw materials, including limestone and clay, to |
|
produce portland cement clinker. |
|
(4) "Semiconductor wafer manufacturing facility" has |
|
the meaning assigned by Section 382.601. |
|
Sec. 382.652. GRAYSON COUNTY PILOT PROGRAM. This |
|
subchapter applies only to: |
|
(1) a semiconductor wafer manufacturing facility that |
|
begins operation after January 1, 2025, and before December 31, |
|
2025; and |
|
(2) a facility that: |
|
(A) is proposed to be constructed under or is |
|
operating under a new source review permit that authorizes the |
|
construction or operation of a portland cement kiln; and |
|
(B) includes or is sited adjacent to an aggregate |
|
production operation. |
|
Sec. 382.653. STUDY AND REPORT. (a) The bureau shall |
|
conduct a study, in consultation with owners or operators of |
|
facilities described by Section 382.652 in Grayson County, to: |
|
(1) analyze seismological data related to aggregate |
|
production operations; |
|
(2) assess the vibrational impact of the production of |
|
aggregates on bedrock; |
|
(3) analyze vibrational parameters necessary to |
|
ensure the successful operation of a semiconductor wafer |
|
manufacturing facility within 10 miles of a facility described by |
|
Section 382.652(2); and |
|
(4) determine whether a minimum distance of more than |
|
10 miles between a facility described by Section 382.652(2) and a |
|
semiconductor wafer manufacturing facility is necessary to prevent |
|
seismic or vibrational disruption to the operation of the |
|
semiconductor wafer manufacturing facility. |
|
(b) In conducting the study under this section, the bureau |
|
may: |
|
(1) collaborate with: |
|
(A) the commission and any other state agency, |
|
political subdivision, or institution of higher education; and |
|
(B) any other stakeholder or private entity as |
|
necessary; and |
|
(2) enter into a nondisclosure agreement with a |
|
private entity. |
|
(c) In addition to money appropriated by the legislature to |
|
the bureau for the purpose of this section, the bureau may accept |
|
gifts, grants, and other donations for the purposes of conducting |
|
the study under this section. |
|
(d) Not later than March 31, 2026, the bureau shall prepare |
|
and submit to the governor, the lieutenant governor, the speaker of |
|
the house of representatives, and each standing legislative |
|
committee with primary jurisdiction over the environment or natural |
|
resources a report on the results of the study conducted under this |
|
section and any recommendations for legislative or other action. |
|
Sec. 382.654. CEMENT PRODUCTION OPERATIONS WITHIN STUDY |
|
AREA. The commission may not issue, renew, or amend a permit or |
|
authorize the use of a standard permit under this chapter for the |
|
construction or operation of a facility described by Section |
|
382.652(2) within 10 miles of a facility described by Section |
|
382.652(1) in Grayson County. |
|
Sec. 382.655. EXPIRATION. This subchapter expires |
|
September 1, 2031. |
|
SECTION 2. Section 382.602, Health and Safety Code, as |
|
added by this Act, applies only to a cause of action that accrues on |
|
or after the effective date of this Act. A cause of action that |
|
accrues before the effective date of this Act is governed by the law |
|
applicable to the cause of action immediately before the effective |
|
date of this Act, and that law is continued in effect for that |
|
purpose. |
|
SECTION 3. This Act takes effect immediately if it receives |
|
a vote of two-thirds of all the members elected to each house, as |
|
provided by Section 39, Article III, Texas Constitution. If this |
|
Act does not receive the vote necessary for immediate effect, this |
|
Act takes effect September 1, 2025. |