AN ACT
|
|
relating to electric service quality and reliability; providing an |
|
administrative penalty. |
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
SECTION 1. Section 36.402, Utilities Code, is amended by |
|
adding Subsection (b-1) to read as follows: |
|
(b-1) Notwithstanding Subsection (b), if an electric |
|
utility fails to comply with the standards required by Section |
|
38.006 and the utility's system is damaged by a weather-related |
|
event or natural disaster, the commission may at the utility's next |
|
rate proceeding reduce the utility's return on equity for |
|
infrastructure used or installed to repair or replace the damaged |
|
portion of the system. |
|
SECTION 2. Section 38.005(b), Utilities Code, is amended to |
|
read as follows: |
|
(b) The commission may take appropriate enforcement action |
|
under this section, including action against a utility, if any of |
|
the utility's feeders with 10 or more customers has had a SAIDI or |
|
SAIFI average that is more than 200 [300] percent greater than the |
|
system average of all feeders during any two-year period[, |
|
beginning in the year 2000]. In determining the appropriate |
|
enforcement action, the commission shall consider: |
|
(1) the feeder's operating and maintenance history; |
|
(2) the cause of each interruption in the feeder's |
|
service; |
|
(3) the duration of each interruption in the feeder's |
|
service; |
|
(4) any action taken by a utility to address the |
|
feeder's performance; |
|
(5) [(4)] the estimated cost and benefit of |
|
remediating a feeder's performance; and |
|
(6) [(5)] any other relevant factor as determined by |
|
the commission. |
|
SECTION 3. Subchapter A, Chapter 38, Utilities Code, is |
|
amended by adding Section 38.006 to read as follows: |
|
Sec. 38.006. STRUCTURAL INTEGRITY STANDARDS FOR |
|
TRANSMISSION AND DISTRIBUTION POLES. (a) This section applies |
|
only to an electric utility, municipally owned utility, or electric |
|
cooperative that operates transmission or distribution assets. |
|
(b) The commission by rule shall adopt standards for the |
|
structural integrity of transmission and distribution poles. |
|
(c) The standards adopted under this section must: |
|
(1) require an electric utility to: |
|
(A) inspect, maintain, remediate, and replace |
|
transmission and distribution poles as necessary on a timeline |
|
established by the commission; and |
|
(B) maintain records of the actions described by |
|
Paragraph (A); |
|
(2) account for geographic and weather |
|
characteristics of this state; |
|
(3) consider national guidelines such as the National |
|
Electrical Safety Code and guidelines developed by the Rural |
|
Utilities Service of the United States Department of Agriculture; |
|
(4) establish a classification system to assess the |
|
serviceability of transmission and distribution poles that |
|
accounts for pole maintenance and extending the service life of |
|
transmission and distribution poles; and |
|
(5) consider the characteristics of electric utility, |
|
municipally owned utility, and electric cooperative transmission |
|
and distribution systems throughout this state. |
|
(d) The governing body of a municipally owned utility or an |
|
electric cooperative shall adopt for the utility or cooperative, as |
|
applicable, the standards adopted by the commission under |
|
Subsection (b). If the commission revises the standards adopted |
|
under Subsection (b), the governing body of each municipally owned |
|
utility and electric cooperative shall adopt the revised standards |
|
not later than the 120th day after the effective date of the |
|
commission's revised standards. |
|
(e) Not later than May 1 of each year, each electric |
|
utility, municipally owned utility, and electric cooperative shall |
|
submit to the commission a report on: |
|
(1) the implementation of the utility's or |
|
cooperative's transmission and distribution pole maintenance |
|
schedule; |
|
(2) the results of the utility's or cooperative's |
|
inspection of transmission and distribution poles, including the |
|
number of poles inspected and any remediation or replacement action |
|
taken; and |
|
(3) any other information the commission requires. |
|
(f) A municipally owned utility or electric cooperative |
|
shall include with the first report required under Subsection (e) |
|
after the utility or cooperative adopts initial or revised |
|
standards under Subsection (d) an attestation from the utility's or |
|
cooperative's highest-ranking representative, official, or officer |
|
with binding authority over the utility or cooperative stating that |
|
the utility or cooperative has adopted standards in compliance with |
|
this section. |
|
(g) The commission may impose an administrative penalty |
|
under Section 15.023 against a municipally owned utility or |
|
electric cooperative for a violation of this section or a rule |
|
adopted under this section. |
|
SECTION 4. The heading to Subchapter E, Chapter 38, |
|
Utilities Code, is amended to read as follows: |
|
SUBCHAPTER E. INFRASTRUCTURE IMPROVEMENT AND MAINTENANCE [REPORT] |
|
SECTION 5. Section 38.101(a), Utilities Code, is amended to |
|
read as follows: |
|
(a) Not later than May 1 of each year, each electric utility |
|
shall submit to the commission a report describing the utility's |
|
activities related to: |
|
(1) identifying areas that are susceptible to damage |
|
during severe weather and hardening transmission and distribution |
|
facilities in those areas; and |
|
(2) vegetation management[; and |
|
[(3) inspecting distribution poles]. |
|
SECTION 6. (a) The changes in law made by this Act to |
|
Section 38.005, Utilities Code, apply only to an enforcement action |
|
initiated by the Public Utility Commission of Texas on or after the |
|
effective date of this Act. An enforcement action initiated before |
|
the effective date of this Act is governed by the law in effect |
|
immediately before the effective date of this Act, and the former |
|
law is continued in effect for that purpose. |
|
(b) In adopting rules under Section 38.006, Utilities Code, |
|
as added by this Act, the Public Utility Commission of Texas shall |
|
allow an electric utility to complete any required inspection, |
|
remediation, or replacement of transmission and distribution poles |
|
installed before the effective date of the rules according to a |
|
reasonable timeline approved by the commission that allows the |
|
utility to prioritize high-risk transmission and distribution |
|
poles. |
|
(c) A municipally owned utility or an electric cooperative |
|
operating on the effective date of the initial standards adopted by |
|
the Public Utility Commission of Texas under Section 38.006(b), |
|
Utilities Code, as added by this Act, shall adopt the standards as |
|
required by Section 38.006(d), Utilities Code, as added by this |
|
Act, not later than the 120th day after the date the Public Utility |
|
Commission of Texas adopts the standards required by Section |
|
38.006(b), Utilities Code, as added by this Act. |
|
SECTION 7. This Act takes effect September 1, 2025. |
|
|
|
|
|
|
|
|
|
|
______________________________ |
______________________________ |
|
President of the Senate |
Speaker of the House |
|
|
I hereby certify that S.B. No. 1789 passed the Senate on |
|
April 23, 2025, by the following vote: Yeas 31, Nays 0; and that |
|
the Senate concurred in House amendments on May 26, 2025, by the |
|
following vote: Yeas 31, Nays 0. |
|
|
|
|
______________________________ |
|
Secretary of the Senate |
|
|
I hereby certify that S.B. No. 1789 passed the House, with |
|
amendments, on May 20, 2025, by the following vote: Yeas 107, |
|
Nays 40, two present not voting. |
|
|
|
|
______________________________ |
|
Chief Clerk of the House |
|
|
|
|
|
Approved: |
|
|
|
______________________________ |
|
Date |
|
|
|
|
|
______________________________ |
|
Governor |