The bill would amend Utilities Code, Section 35.004 to require each distribution-owning utility in the Electric Reliability Council of Texas (ERCOT) power region, for purposes of establishing the postage stamp rate, to report the additional billing determinants that would be created by applying the minimum transmission charge calculation under Section 36.010 to the distribution-owning utility's service area.
The bill would add Section 36.010 to the Utilities Code, requiring the Public Utilities Commission of Texas (PUC) to ensure that all users of the transmission system in the ERCOT power region contribute to transmission cost recovery, and to implement minimum rates that require all retail customers in that region served behind-the-meter to pay retail transmission charges based on a percentage of the customer's non-coincident peak demand from the utility system as identified in the customer's service agreement.
The bill would add Section 37.0561 to the Utilities Code requiring PUC by rule to establish standards for interconnecting large load customers at transmission voltage in the ERCOT power region in a manner designed to support business development in this state while minimizing the potential for stranded infrastructure costs.
The bill would amend Utilities Code, Section 39.002 to provide applicability that Chapter 39 of the Utilities Code, other than certain provisions, including Sections 39.169, 39.170, does not apply to a municipally owned utility or an electric cooperative.
The bill would add Section 39.169 to the Utilities Code to require a power generation company, municipally owned utility, or electric cooperative to submit a notice to PUC and the independent organization certified under Section 39.151 for the ERCOT power region before implementing a new net metering arrangement between a facility registered with the independent organization as a generation resource and an unaffiliated retail customer if: the retail customer's demand would exceed 10 percent of the nameplate capacity of the existing generation resource; and the facility owner has not proposed to construct an equal amount of replacement capacity in the same general area.
The bill would add Section 39.170 to the Utilities Code requiring PUC to require the independent organization certified under Section 39.151 for the ERCOT power region to ensure that each electric cooperative, electric utility, and municipally owned utility serving a transmission-voltage large load customer that is subject to the standards adopted under Section 37.0561 installs, or requires to be installed, before the customer is interconnected, equipment that allows the load to be remotely disconnected during firm load shed. This subsection would apply only to a load interconnected after December 31, 2025, that is not load operated by a critical load industrial customer, as defined by Section 17.002, or designated as a critical natural gas facility under Section 38.074.
The bill would require PUC to evaluate whether the existing methodology used to allocate wholesale transmission costs to distribution providers under Utilities Code, Section 35.004(d) continues to appropriately assign costs for transmission investment and to also evaluate whether the current methodology, including the four coincident peak methodology, for allocating transmission costs by transmission and distribution utilities in the ERCOT power region to their customer classes results in a just and reasonable allocation.
The bill would require PUC to open a rulemaking project regarding the evaluation required under Subsection (a) of this section no later than the 90th day after the effective date of this bill and requires PUC, if PUC determines in the project that a PUC rule should be amended, to adopt the final rule no later than December 31, 2026.