A BILL TO BE ENTITLED
|
|
|
AN ACT
|
|
|
relating to the exercise of eminent domain for a demonstrated |
|
|
public necessity; limiting certain condemnation powers; requiring |
|
|
independent review, public hearings and county elections, enhanced |
|
|
compensation, repurchase rights, and revenue accounting; providing |
|
|
court review, injunctive relief, recovery of costs, and |
|
|
enforcement; contingent in part on a constitutional amendment. |
|
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
|
SECTION 1. SHORT TITLE. This Act may be cited as the Texas |
|
|
Private Property and Public Necessity Protection Act. |
|
|
SECTION 2. LEGISLATIVE PURPOSE. The legislature finds that |
|
|
involuntary acquisition of private property is an extraordinary |
|
|
governmental act, that a public benefit is not by itself proof of an |
|
|
indispensable need for a particular parcel, and that the public and |
|
|
landowners require transparent findings, genuine alternatives, |
|
|
meaningful local participation, adequate compensation, and |
|
|
judicial review before property is taken. |
|
|
SECTION 3. Chapter 2206, Government Code, is amended by |
|
|
adding Subchapter E to read as follows: |
|
|
SUBCHAPTER E. STATEWIDE PUBLIC NECESSITY STANDARDS |
|
|
Sec. 2206.201. DEFINITIONS. In this subchapter: |
|
|
(1) "Condemning authority" means any governmental or |
|
|
private person or entity asserting eminent-domain power under a |
|
|
general, local, or special law, including an agency, municipality, |
|
|
county, special district, water supply corporation, public |
|
|
utility, railway, common carrier, corporation created or |
|
|
controlled by a governmental entity, or agent acting on behalf of |
|
|
another entity. |
|
|
(2) "Covered project" means the entire undertaking for |
|
|
which property acquisition by eminent domain is proposed, including |
|
|
related reservoirs, roads, pipelines, power facilities, |
|
|
transmission lines, mitigation areas, access facilities, storage, |
|
|
development phases, and improvements under common control or |
|
|
coordinated funding. A connected project may not be artificially |
|
|
divided to avoid a statutory requirement. |
|
|
(3) "Public necessity" means an objectively |
|
|
demonstrated, immediate and critical need for essential public |
|
|
infrastructure or services directly benefiting the general public, |
|
|
including the local population where a taking occurs, that cannot |
|
|
reasonably be supplied by a feasible, less intrusive alternative. |
|
|
"Immediate" requires a presently established need and an |
|
|
objectively justified implementation schedule; speculative growth |
|
|
projections alone are insufficient. This definition does not limit |
|
|
a more protective standard in the Texas Constitution. |
|
|
(4) "Feasible alternative" means a lawful, |
|
|
technically capable option reasonably implementable within an |
|
|
objectively justified period, including a combination of options, |
|
|
even if not the condemnor's least expensive or preferred option. |
|
|
Substantiated disproportionate cost and infeasibility may be |
|
|
considered; an avoidable or self-created deadline is not proof of |
|
|
necessity. |
|
|
(5) "Protected land" means prime farmland identified |
|
|
under United States Department of Agriculture soil |
|
|
classifications, active timberland, watershed or recharge land, |
|
|
bottomland hardwood forest, a multigenerational ranch held |
|
|
continuously in family ownership for at least 25 years, or a |
|
|
homestead occupied or qualified for homestead treatment under |
|
|
applicable law. The claimant may supply reasonable records; |
|
|
absence of a tax exemption does not defeat otherwise qualifying |
|
|
land. |
|
|
(6) "Affected owner" means a record title owner, |
|
|
including a cotenant group treated as one ownership unit for a |
|
|
particular parcel, whose land is sought through eminent domain for |
|
|
the covered project. Affiliates may not fabricate or consolidate |
|
|
owners to evade a threshold. A person owning multiple parcels is |
|
|
counted once for the separate-owner threshold. |
|
|
(7) "Taking" includes acquiring fee title, easements, |
|
|
options secured by threatened condemnation, long-term exclusive |
|
|
occupancy, or another compensable property interest; the |
|
|
imposition of project-related restrictions may be examined under |
|
|
applicable takings law. |
|
|
Sec. 2206.202. STATEWIDE APPLICATION; PREEMPTION OF STATE |
|
|
EXCEPTIONS. (a) This subchapter governs every proposed |
|
|
condemnation under state law by a public or private condemnor, |
|
|
regardless of size or location, and supplements Chapter 21, |
|
|
Property Code. |
|
|
(b) Notwithstanding Section 2206.001(c), Section |
|
|
2206.053(f) or (g), or a conflicting general, special, or local |
|
|
law, a permit, franchise, common-carrier designation, certificate |
|
|
of convenience, water plan, declaration of public use, funding |
|
|
award, or vote of an appointed board does not dispense with this |
|
|
subchapter. |
|
|
(c) The subchapter applies to transportation, water, |
|
|
wastewater, drainage, ports, public buildings, schools, parks, |
|
|
utilities, transmission, pipelines, storage facilities, and other |
|
|
undertakings alike, but confers no new condemnation authority. No |
|
|
private contract, joint venture, subsidiary, proxy, affiliate, |
|
|
interlocal agreement, route change, condemnation threat, or staged |
|
|
acquisition may evade the requirements. |
|
|
(d) A federal agency's exercise of independent federal |
|
|
eminent-domain authority is not regulated by this state Act. Its |
|
|
application to a federally certificated or preempted project is |
|
|
limited to the extent consistent with controlling federal law; a |
|
|
condemnor invoking preemption shall identify the specific federal |
|
|
authority in a verified public filing before asserting the |
|
|
exception. No broader exception is implied. |
|
|
Sec. 2206.203. PROHIBITED PURPOSES AND NONDELEGATION. (a) |
|
|
A taking is prohibited if its primary purpose is speculative |
|
|
population or tax-base growth, private development, private |
|
|
commerce, increased private profit, assembly for resale, or a |
|
|
public-private venture principally supplying private economic |
|
|
return. A subsequent private lease or transfer is evidence to be |
|
|
considered, but the economic substance controls. |
|
|
(b) An entity created to profit from acquiring condemned |
|
|
property, a private for-profit company, or an unelected governing |
|
|
board may not hold or exercise a new state-law delegation of |
|
|
eminent-domain power after the effective date. Only the state or an |
|
|
elected political-subdivision governing body may authorize a |
|
|
taking; an elected authorizing body must consider each affected |
|
|
project and issue written parcel-specific findings. A ministerial |
|
|
filing by staff does not replace its vote. |
|
|
(c) An entity with a preexisting claim of private |
|
|
condemnation authority is subject to the transition provisions of |
|
|
this Act, applicable constitutional law, and the express limits in |
|
|
this section. This section shall be administered consistently with |
|
|
Section 2206.215 and the Constitutions of Texas and the United |
|
|
States. |
|
|
Sec. 2206.204. BURDEN OF PROOF; NECESSITY; ALTERNATIVES. |
|
|
(a) Before filing a condemnation petition or threatening |
|
|
involuntary possession, a condemnor shall prove by clear and |
|
|
convincing evidence for each tract and each interest sought that |
|
|
(1) the project meets a present public necessity; (2) the exact |
|
|
parcel and interest are indispensable to that necessity; (3) no |
|
|
feasible combination of conservation, design changes, routes, |
|
|
sites, technology, existing property, demand reduction, voluntary |
|
|
acquisition, or a lesser estate can meet the demonstrated need; and |
|
|
(4) the taking is the least intrusive reasonably feasible means. |
|
|
(b) The purpose must be defined without reference to the |
|
|
preferred site or sponsor. Greater population, forecast taxes, |
|
|
grants, economic development, or the convenience of the sponsor |
|
|
does not create a presumption. An offer refused by an owner is not |
|
|
evidence of public necessity. |
|
|
(c) The assessment shall quantify actual local, downstream, |
|
|
and surrounding economic, agricultural, ecological, environmental, |
|
|
access, drainage, cultural, community, and cumulative effects. |
|
|
Project-specific mitigation shall be evaluated but cannot excuse a |
|
|
prohibited taking or replace the necessity proof. |
|
|
(d) A landowner is not required to retain an expert or |
|
|
design an alternative. Unresolved material uncertainty or |
|
|
unsupported assumptions are insufficient to satisfy the |
|
|
condemnor's burden. |
|
|
Sec. 2206.205. INDEPENDENT REVIEW PANEL. (a) Before the |
|
|
public hearing required by Section 2206.206, the condemnor shall |
|
|
submit the complete project and parcel-specific necessity record to |
|
|
an independent three-member review panel appointed by the district |
|
|
court in the county where the property lies from an approved public |
|
|
roster of qualified independent professionals. |
|
|
(b) One member must possess relevant engineering or |
|
|
infrastructure expertise; one must possess land valuation, |
|
|
agricultural, or environmental expertise appropriate to the |
|
|
affected property; and one must be an attorney experienced in |
|
|
property or administrative law or a qualified neutral with judicial |
|
|
experience. No member may have represented or received |
|
|
project-related compensation from the condemnor, its affiliates, |
|
|
or the acquiring beneficiary during the preceding five years. |
|
|
(c) The panel shall review alternatives, demand and supply |
|
|
assumptions, local benefits, impacts, and the proposed |
|
|
acquisition. It shall conduct a publicly noticed evidentiary |
|
|
meeting, accept written and oral objections, and publish an |
|
|
independently reasoned recommendation with its data and dissenting |
|
|
conclusions, if any, within 90 days of a complete submission. |
|
|
(d) The panel's recommendation is evidence but is not |
|
|
conclusive, creates no presumption, and does not replace judicial |
|
|
findings. The condemnor pays reasonable approved costs into a |
|
|
court-administered fund; affected owners pay no panel costs. The |
|
|
court may replace a conflicted member and may order supplementation |
|
|
of an inadequate record. |
|
|
Sec. 2206.206. FULL DISCLOSURE; PUBLIC HEARINGS. (a) At |
|
|
least 90 days before filing a condemnation petition, the condemnor |
|
|
shall provide each affected owner, county commissioners court, and |
|
|
affected municipality a complete project description, each route or |
|
|
site alternative, demand evidence, land map and ownership list, |
|
|
independent-review report, environmental and economic impact |
|
|
assessments, parcel-specific necessity findings, survey limits, |
|
|
acquisition instrument, and written notice of rights. |
|
|
(b) The documents shall be available without charge online |
|
|
and in a physical public location in each affected county. Notice |
|
|
shall be mailed to affected owners; published in an appropriate |
|
|
newspaper; and posted publicly at least 30 days before a recorded |
|
|
hearing in each affected county. The hearing must allow reasonable |
|
|
oral and written comment and address material objections in a |
|
|
written response before a vote. |
|
|
(c) A confidentiality agreement, trade-secret designation, |
|
|
contract with an intermediary, or nondisclosure clause may not |
|
|
conceal information material to condemnation necessity from an |
|
|
owner or court. Information lawfully protected from the general |
|
|
public may be examined under a judicial protective order; it may not |
|
|
be relied on to establish necessity if withheld from the affected |
|
|
owner and judge. |
|
|
Sec. 2206.207. COUNTYWIDE REFERENDUM. (a) Before a |
|
|
condemnor files the first petition for a covered project that |
|
|
proposes, in aggregate, to acquire through eminent domain more than |
|
|
100 acres or property of more than 10 separate owners, the project |
|
|
must receive an affirmative majority vote at a project-specific |
|
|
election in each county in which a project taking would occur. |
|
|
(b) An affirmative vote is required in every affected |
|
|
county; approval in another county cannot substitute. A county |
|
|
commissioners court shall order the election when it receives a |
|
|
complete, verified application and a deposit of the reasonable |
|
|
election costs from the condemnor. An elected statewide entity is |
|
|
subject to the same county elections for projects under state |
|
|
authority. |
|
|
(c) The proposition shall identify the project, maximum |
|
|
condemned acreage, general route or footprint, necessity claimed, |
|
|
beneficiaries, and maximum proposed interest to be taken, and shall |
|
|
ask whether the project may use eminent domain in that county. It |
|
|
may not package unrelated projects. Material expansion requires a |
|
|
new vote. |
|
|
(d) Elections shall be administered under the Election |
|
|
Code, including Chapter 41 and applicable notice and canvassing |
|
|
laws. An election may not be held until after the independent panel |
|
|
report and county hearing. The condemnor shall bear documented |
|
|
election costs. Failure to hold an election is denial, not deemed |
|
|
approval. |
|
|
(e) For determining thresholds, all reasonably foreseeable |
|
|
project phases, connected parcels, threatened condemnation |
|
|
acquisitions, common owners, affiliates, and substantially related |
|
|
routes or sites must be aggregated. An initial voluntary purchase |
|
|
that does not involve threatened condemnation is not itself |
|
|
condemned acreage, but a sham acquisition to evade this section |
|
|
shall be counted. |
|
|
Sec. 2206.208. PROTECTED AGRICULTURAL AND NATURAL LANDS. |
|
|
(a) Land meeting Section 2206.201(5) may be condemned only on a |
|
|
showing by clear and convincing evidence of unavoidable immediate |
|
|
public necessity for that protected tract, as independently |
|
|
reviewed and judicially determined, and only after at least |
|
|
two-thirds of votes cast on the question by the qualified voters in |
|
|
each county containing affected protected land are in favor. |
|
|
(b) This special election is required regardless of project |
|
|
acreage or number of affected owners. When both Sections 2206.207 |
|
|
and 2206.208 apply, one ballot may be used only if it clearly states |
|
|
the heightened two-thirds threshold. No approval in one county |
|
|
overrules a no vote in another. |
|
|
(c) A project sponsor must evaluate farmland, timberland, |
|
|
homestead, and watershed avoidance and demonstrate why an |
|
|
alternative route or site outside protected lands is infeasible. |
|
|
Future mitigation or payments to unrelated parties do not satisfy |
|
|
the prohibition. |
|
|
Sec. 2206.209. PRIOR JUDICIAL HEARING; NO EARLY POSSESSION. |
|
|
(a) The district court where the tract is located has original |
|
|
jurisdiction, before appointment of special commissioners under |
|
|
Chapter 21, Property Code, to decide lawful authority, public |
|
|
necessity, independent panel compliance, elections, protected |
|
|
status, the validity of a proposed interest, and the absence of |
|
|
feasible alternatives. |
|
|
(b) The condemnor must produce all evidence and establish |
|
|
each element by clear and convincing evidence. The court shall |
|
|
conduct an evidentiary hearing with reasonable discovery and |
|
|
opportunity for the owner to examine witnesses, make independent |
|
|
findings as to each parcel, and deny or dismiss a proceeding that |
|
|
fails the burden. |
|
|
(c) Neither a permit nor a condemnor's own determination |
|
|
receives deference. No court or special commissioner may permit |
|
|
possession, entry for construction, site disturbance, or transfer |
|
|
of ownership pending a final favorable necessity determination and |
|
|
completion of timely review. Lawful preliminary surveys remain |
|
|
governed by existing law and do not authorize intrusive |
|
|
construction or a permanent property right. |
|
|
(d) Either party may take an interlocutory appeal from the |
|
|
necessity ruling. The filing of a timely appeal stays all |
|
|
condemnation and possession activity for the affected parcel |
|
|
through resolution of that appeal. A deposit, bond, emergency |
|
|
declaration, or commissioners' award does not waive the stay. |
|
|
(e) An owner who obtains dismissal or an injunction for |
|
|
noncompliance, or whose condemnor voluntarily dismisses after a |
|
|
substantial contest to necessity, shall receive reasonable |
|
|
attorney, expert, appraisal, and court costs. An unsuccessful |
|
|
owner shall not owe the condemnor's professional fees solely for |
|
|
raising a good-faith challenge. |
|
|
Sec. 2206.210. COMPENSATION; DAMAGES AND COSTS. (a) The |
|
|
minimum amount for a taking permitted by this subchapter is 200 |
|
|
percent of the fair market value of the interest condemned as of the |
|
|
valuation date immediately preceding any project-caused |
|
|
diminution, plus independently established severance damages to |
|
|
the remainder and reasonable actual relocation, loss-of-access |
|
|
mitigation, restoration, fencing, drainage, |
|
|
business-interruption, moving, and necessary appraisal, legal, and |
|
|
professional expenses caused by the taking. |
|
|
(b) The 200 percent value floor applies separately to the |
|
|
interest taken. Additional categories may not be used to reduce |
|
|
that floor, and an item of actual loss may be recovered only once. |
|
|
This section provides an enhancement beyond ordinary |
|
|
constitutional compensation and does not reduce another remedy or |
|
|
federal minimum. |
|
|
(c) The condemnor shall pay or secure the required amount |
|
|
before possession. If any owner contests valuation, the undisputed |
|
|
amount shall be tendered, but tender alone does not authorize |
|
|
possession while necessity remains in litigation. The court shall |
|
|
authorize independently obtained appraisals and allow evidence of |
|
|
long-term agricultural and timber use insofar as relevant under the |
|
|
appraisal law. |
|
|
(d) For an easement, the acquired interest must be narrowly |
|
|
described by area, duration, permissible uses, access, future |
|
|
expansion, restoration duty, and termination; a condemnor may not |
|
|
treat a limited corridor award as blanket authority for unrelated |
|
|
future facilities. |
|
|
Sec. 2206.211. 10-YEAR RETURN; NO SHAM PROGRESS. (a) In |
|
|
addition to all rights under Subchapter E, Chapter 21, Property |
|
|
Code, a former owner or the owner's heirs, successors, or assigns |
|
|
has an enforceable right to repurchase an interest condemned under |
|
|
this subchapter if the property is not actually placed into the |
|
|
original specifically stated public-necessity use within 10 years |
|
|
after acquisition, even if surveying, planning, procurement, |
|
|
financing, permitting, or another preliminary act occurred. |
|
|
(b) The right also arises earlier upon cancellation, |
|
|
abandonment, disposal, or change to a substantially different use. |
|
|
A redevelopment label, partial nonproductive use, transfer to an |
|
|
affiliate, or lease may not constitute use unless the condemned |
|
|
parcel is materially serving the authorized public necessity. |
|
|
(c) The condemnor shall notify the former owner and known |
|
|
heirs promptly upon an event in Subsection (b) and not later than 30 |
|
|
days after the 10-year deadline. The person has at least 180 days |
|
|
after actual notice to accept an offer of repurchase, and 180 days |
|
|
after acceptance to close. Failure to deliver notice does not |
|
|
extinguish the right. |
|
|
(d) The repurchase price is the original compensation |
|
|
attributable to the interest reacquired, adjusted by the change in |
|
|
the United States Consumer Price Index for All Urban Consumers from |
|
|
acquisition through repurchase; the amount may not be increased for |
|
|
improvements installed solely for an abandoned purpose. The seller |
|
|
shall convey the same estate or interest reasonably capable of |
|
|
reconveyance, free of liens created by the condemnor. |
|
|
(e) The district court may compel conveyance, rescind an |
|
|
unlawful transfer, and award costs and reasonable fees to a |
|
|
prevailing former owner. The stronger of this section and |
|
|
otherwise applicable repurchase law governs a new covered |
|
|
acquisition. Existing lawful repurchase rights are not diminished. |
|
|
Sec. 2206.212. DIRECT PROPERTY REVENUE RETURN. (a) If |
|
|
receipts or revenue are obtained directly from property |
|
|
involuntarily acquired for a covered project, including leases, |
|
|
license fees, royalties, rents, sales, commercial access charges, |
|
|
concessions, or consideration for later transfer or commercial use, |
|
|
the condemnor shall annually account for and remit the attributable |
|
|
revenue in proportion to the real property interests acquired from |
|
|
the affected former owners and successors. |
|
|
(b) Revenue from a specific parcel must first be attributed |
|
|
to that parcel. Revenue inseparable among several condemned |
|
|
parcels shall be allocated using independently appraised |
|
|
contribution to the revenue-generating use, or acreage if |
|
|
contribution cannot reasonably be distinguished. No contractual |
|
|
affiliate, successor, governmental corporation, or project sponsor |
|
|
may evade payment through internal transfers or noncash |
|
|
consideration. |
|
|
(c) Public taxes and general utility tariffs collected for |
|
|
services that cannot reasonably be attributed to the affected |
|
|
parcel are not deemed property-generated receipts merely because a |
|
|
public facility crosses the parcel. This narrow identification |
|
|
rule does not exempt site-specific commercial revenue and shall be |
|
|
reviewed by legislative counsel for conformity with the proposed |
|
|
constitutional amendment and adopted legislative priority. |
|
|
(d) The condemnor shall maintain an audited annual |
|
|
property-revenue ledger and send statements and distributions to |
|
|
known former owners. An affected owner may audit the records, seek |
|
|
an accounting and injunction, and recover wrongfully withheld |
|
|
amounts, interest, and reasonable fees. A compensation award under |
|
|
Section 2206.210 may not be used as an offset to revenue due under |
|
|
this section. |
|
|
Sec. 2206.213. TRANSPARENCY; OVERSIGHT; ENFORCEMENT. (a) |
|
|
The comptroller shall maintain a free statewide registry of covered |
|
|
projects and the condemning authority; requested parcels and |
|
|
acreage; number of owners; purpose and underlying legal authority; |
|
|
assessments and alternatives; panel reports; elections; court |
|
|
rulings; use-commencement dates; disposition, repurchase, and |
|
|
revenue remittances; and compliance and enforcement actions. |
|
|
(b) The attorney general may seek injunctive or declaratory |
|
|
relief to prevent an unauthorized taking. An affected owner may |
|
|
bring an action for declaratory or injunctive relief and |
|
|
enforcement of a mandatory duty in a district court of the county |
|
|
where the land lies. Jurisdiction and a limited waiver of |
|
|
governmental and sovereign immunity to suit and liability are |
|
|
provided to the extent necessary for the prospective relief and |
|
|
specific fee and repurchase remedies expressly conferred by this |
|
|
subchapter; this subsection creates no general tort damages remedy. |
|
|
(c) Materially false verification, evasion by project |
|
|
segmentation, concealment of beneficial ownership, or retaliation |
|
|
for participation disqualifies the defective application until |
|
|
corrected and is subject to court-ordered injunctive relief. |
|
|
Additional criminal or civil penalties require independent |
|
|
Legislative Council review before inclusion. |
|
|
Sec. 2206.214. NARROW TEMPORARY LIFE-SAFETY RELIEF. A |
|
|
district court may authorize only temporary, reasonably necessary |
|
|
access or a nonpermanent property interest for a documented |
|
|
imminent threat to human life when no feasible response exists |
|
|
without immediate access. The order must specify maximum duration, |
|
|
safeguards, payment, restoration, and a hearing within 10 days. It |
|
|
does not authorize a permanent taking, ordinary growth project, |
|
|
speculative capacity expansion, or evasion of the necessity |
|
|
requirement. |
|
|
Sec. 2206.215. PROTECTED RIGHTS; FEDERAL LAW. (a) This |
|
|
subchapter applies prospectively to petitions filed on or after its |
|
|
effective date, subject to the constitutional protection of final |
|
|
judgments, interests already acquired, and legally protected |
|
|
contracts. A pending route designation, project plan, preliminary |
|
|
expenditure, or unfiled proposal alone is not a vested condemnation |
|
|
of a particular parcel. |
|
|
(b) This subchapter does not authorize the state to regulate |
|
|
direct federal condemnation or diminish rights under the |
|
|
Constitution of the United States. Any federally preempted |
|
|
application is severed only to the minimum degree required by |
|
|
controlling law; the remaining state-law duties continue where |
|
|
lawful. |
|
|
Sec. 2206.216. RULES; NO WAIVER. The comptroller, the |
|
|
attorney general, the Texas Department of Transportation, the |
|
|
Public Utility Commission, the Railroad Commission, and the Texas |
|
|
Commission on Environmental Quality may coordinate published |
|
|
implementation guidance within their lawful jurisdictions, but may |
|
|
not create exceptions or substitute implied approval for a |
|
|
statutory or constitutional protection. |
|
|
SECTION 4. Section 2206.001, Government Code, is amended by |
|
|
adding Subsection (f) to read as follows: |
|
|
(f) An exception recognized in Subsection (c) preserves |
|
|
only the underlying authority otherwise granted by law; it does not |
|
|
exempt a condemnor from the public necessity, election, independent |
|
|
review, compensation, and other requirements of Subchapter E, |
|
|
subject to controlling federal law. |
|
|
SECTION 5. Section 2206.053, Government Code, is amended by |
|
|
adding Subsection (h) to read as follows: |
|
|
(h) Notwithstanding Subsection (f) or (g), an ordinance, |
|
|
resolution, or delegation that does not identify a parcel or that |
|
|
authorizes condemnation without compliance with Subchapter E may |
|
|
not substitute for the parcel-specific public necessity findings, |
|
|
independent review, or county election required by that subchapter. |
|
|
SECTION 6. Chapter 21, Property Code, is amended by adding |
|
|
Section 21.0125 to read as follows: |
|
|
Sec. 21.0125. PRIOR PUBLIC NECESSITY DETERMINATION. (a) |
|
|
Notwithstanding Sections 21.001, 21.011, 21.014, and 21.021, |
|
|
before special commissioners are appointed or possession granted, |
|
|
the district court in the county containing the property shall make |
|
|
the findings required by Subchapter E, Chapter 2206, Government |
|
|
Code, when applicable. |
|
|
(b) No compensation award, deposit, temporary injunction |
|
|
bond, or waiver of commissioners' objections dispenses with the |
|
|
prior judicial determination and any timely interlocutory appeal. |
|
|
This section supplements Section 21.003. |
|
|
SECTION 7. Chapter 21, Property Code, is amended by adding |
|
|
Section 21.0431 to read as follows: |
|
|
Sec. 21.0431. MINIMUM COMPENSATION FOR CERTAIN TAKINGS. |
|
|
For a taking covered by Subchapter E, Chapter 2206, Government |
|
|
Code, special commissioners and courts shall award no less than the |
|
|
compensation required by Section 2206.210 of that code. A written |
|
|
settlement made with independently represented owners may |
|
|
establish different payment terms only if it does not purport to |
|
|
waive any required constitutional minimum or entitlement of another |
|
|
owner. |
|
|
SECTION 8. Section 21.101, Property Code, is amended by |
|
|
adding Subsection (d) to read as follows: |
|
|
(d) For property acquired under Subchapter E, Chapter 2206, |
|
|
Government Code, the additional triggers, ten-year actual-use |
|
|
test, notice protections, and remedies in Section 2206.211, |
|
|
Government Code, apply in addition to this subchapter; an existing |
|
|
stronger repurchase right is preserved. |
|
|
SECTION 9. Section 21.103, Property Code, is amended by |
|
|
adding Subsection (c) to read as follows: |
|
|
(c) The repurchase price for a property interest acquired |
|
|
under Subchapter E, Chapter 2206, Government Code, is governed by |
|
|
Section 2206.211, Government Code, rather than the unadjusted |
|
|
resale price in Subsection (b), without limiting another repurchase |
|
|
entitlement available for acquisitions not covered by that |
|
|
subchapter. |
|
|
SECTION 10. CONFORMING EFFECT ON OTHER CODES. The |
|
|
requirements of Subchapter E, Chapter 2206, Government Code, and |
|
|
Section 21.0125, Property Code, apply notwithstanding a |
|
|
conflicting condemnation grant or procedure in Transportation Code |
|
|
Chapter 203; Utilities Code Chapter 181 or 186; Water Code Chapter |
|
|
49; Natural Resources Code Chapter 111; Local Government Code |
|
|
Chapter 251; Education Code Section 11.155; or a special enabling |
|
|
law, subject to the supremacy of controlling federal law. An |
|
|
authorizing law that conflicts with this Act shall be read together |
|
|
with this Act to give effect to the stronger lawful protection |
|
|
against an involuntary taking. |
|
|
SECTION 11. IMPLEMENTATION; LEGISLATIVE REVIEW. (a) |
|
|
Within 180 days after this Act takes effect, the comptroller shall |
|
|
publish a consolidated list of existing state-law entities claiming |
|
|
condemnation authority and the statutes that confer it, flag |
|
|
private or unelected bodies, and submit to the legislature proposed |
|
|
conforming repeals or limitations. |
|
|
(b) No new prohibited taking may proceed solely because |
|
|
implementing rules have not yet been adopted. This Act does not |
|
|
appropriate funds. The fiscal effect of panels, elections, |
|
|
enhanced compensation, reporting, and revenue remittance must be |
|
|
addressed through the legislative appropriations process. |
|
|
SECTION 12. TRANSITION. This Act governs condemnation |
|
|
petitions filed, and new acquisitions by express threat of |
|
|
condemnation initiated, on or after the effective date. It does not |
|
|
reopen final judgments or undo an interest actually and lawfully |
|
|
acquired before that date. A preexisting permit, certificate, |
|
|
plan, or contract does not by itself grandfather a future unfiled |
|
|
condemnation proceeding. Any application to a legally protected |
|
|
preexisting right shall be resolved under the Texas and United |
|
|
States Constitutions. |
|
|
SECTION 13. SEVERABILITY. If a provision or application of |
|
|
this Act is held invalid, remaining provisions capable of |
|
|
independent application remain effective. A finding invalidating a |
|
|
referendum procedure, reimbursement formula, or delegation limit |
|
|
does not by itself authorize a taking prohibited by another |
|
|
effective provision. |
|
|
SECTION 14. EFFECTIVE DATE AND CONTINGENCY. This Act takes |
|
|
effect January 1, 2028, but only if the constitutional amendment |
|
|
proposed by the 90th Legislature, Regular Session, 2027, concerning |
|
|
the public-necessity standard for eminent domain is approved by the |
|
|
voters at the November 2, 2027 election. If that amendment is not |
|
|
approved, this Act has no effect. |