A BILL TO BE ENTITLED
|
|
|
AN ACT
|
|
|
relating to the removal of certain power facilities operated on |
|
|
leased property. |
|
|
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: |
|
|
SECTION 1. Section 301.0001, Utilities Code, is amended by |
|
|
amending Subdivisions (1) and (1-a) and adding Subdivision (1-b) to |
|
|
read as follows: |
|
|
(1) "Commission" means the Texas Commission on |
|
|
Environmental Quality. |
|
|
(1-a) "Grantee" means a person who[: |
|
|
[(A)] leases property from a landowner[; and |
|
|
[(B) operates a wind power facility on the |
|
|
property]. |
|
|
(1-b) [(1-a)] "Recycle" means the processing of an |
|
|
item to recover a usable product. |
|
|
SECTION 2. Sections 301.0004(a), (c), (e), and (g), |
|
|
Utilities Code, are amended to read as follows: |
|
|
(a) A wind power facility agreement must provide that the |
|
|
grantee shall obtain and deliver to the commission [landowner] |
|
|
evidence of financial assurance payable to the landowner that |
|
|
conforms to the requirements of this section to secure the |
|
|
performance of the grantee's obligations under Section 301.0003. |
|
|
The [Acceptable forms of] financial assurance may be [include a |
|
|
parent company guaranty with a minimum investment grade credit |
|
|
rating for the parent company issued by a major domestic credit |
|
|
rating agency, a letter of credit,] a bond[,] or another form of |
|
|
financial assurance acceptable to the landowner. |
|
|
(c) The agreement must provide that: |
|
|
(1) the estimated cost of removing the wind power |
|
|
facilities from the landowner's property, recycling or disposing of |
|
|
all the components of the wind power facilities, and restoring the |
|
|
property to as near as reasonably possible the condition of the |
|
|
property as of the date the agreement begins and the estimated |
|
|
salvage value of the wind power facilities must be determined by an |
|
|
independent, third-party professional engineer licensed in this |
|
|
state; |
|
|
(2) the grantee must deliver to the landowner and the |
|
|
commission an updated estimate, prepared by an independent, |
|
|
third-party professional engineer licensed in this state, of the |
|
|
costs and salvage value described by Subdivision (1) [cost of |
|
|
removal and recycling or disposal of the wind power facilities and |
|
|
the salvage value] at least once every five years for the remainder |
|
|
of the term of the agreement; and |
|
|
(3) the grantee is responsible for ensuring that the |
|
|
amount of the financial assurance remains sufficient to cover the |
|
|
amount required by Subsection (b), consistent with the estimates |
|
|
required by this subsection. |
|
|
(e) The agreement must provide that the grantee shall |
|
|
deliver the financial assurance to the commission not later than |
|
|
the [earlier of: |
|
|
[(1) the] date on which the wind power facility |
|
|
agreement begins [is terminated; or |
|
|
[(2) the 10th anniversary of the commercial operations |
|
|
date of the wind power facilities located on the landowner's leased |
|
|
property]. |
|
|
(g) The grantee may not cancel financial assurance before |
|
|
the date the grantee has completed the grantee's obligation to |
|
|
remove the grantee's wind power facilities located on the |
|
|
landowner's property as required [in the manner provided] by this |
|
|
chapter, unless the grantee provides the commission [landowner] |
|
|
with replacement financial assurance at the time of or before the |
|
|
cancellation. In the event of a transfer of ownership of the |
|
|
grantee's wind power facilities, the financial assurance |
|
|
[security] provided by the grantee shall remain in place until the |
|
|
date evidence of financial assurance [security] meeting the |
|
|
requirements of this chapter is provided to the commission |
|
|
[landowner]. |
|
|
SECTION 3. Section 302.0001, Utilities Code, is amended by |
|
|
amending Subdivisions (1) and (1-a) and adding Subdivision (1-b) to |
|
|
read as follows: |
|
|
(1) "Commission" means the Texas Commission on |
|
|
Environmental Quality. |
|
|
(1-a) "Grantee" means a person, other than an electric |
|
|
utility, as defined by Section 31.002, who[: |
|
|
[(A)] leases property from a landowner[; and |
|
|
[(B) operates a solar power facility on the |
|
|
property]. |
|
|
(1-b) [(1-a)] "Recycle" means the processing of an item |
|
|
to recover a usable product. |
|
|
SECTION 4. Sections 302.0005(a), (c), (e), and (g), |
|
|
Utilities Code, are amended to read as follows: |
|
|
(a) A solar power facility agreement must provide that the |
|
|
grantee shall obtain and deliver to the commission [landowner] |
|
|
evidence of financial assurance payable to the landowner that |
|
|
conforms to the requirements of this section to secure the |
|
|
performance of the grantee's obligations under Section 302.0004. |
|
|
The [Acceptable forms of] financial assurance may be [include a |
|
|
parent company guaranty with a minimum investment grade credit |
|
|
rating for the parent company issued by a major domestic credit |
|
|
rating agency, a letter of credit,] a bond[,] or another form of |
|
|
financial assurance reasonably acceptable to the landowner. |
|
|
(c) The agreement must provide that: |
|
|
(1) the estimated cost of removing the solar power |
|
|
facilities from the landowner's property, recycling or disposing of |
|
|
all the components of the solar power facilities, and restoring the |
|
|
property to as near as reasonably possible the condition of the |
|
|
property as of the date the agreement begins and the estimated |
|
|
salvage value of the solar power facilities must be determined by an |
|
|
independent, third-party professional engineer licensed in this |
|
|
state; |
|
|
(2) the grantee must deliver to the landowner and the |
|
|
commission an updated estimate, prepared by an independent, |
|
|
third-party professional engineer licensed in this state, of the |
|
|
costs and salvage value described by Subdivision (1) [cost of |
|
|
removal and recycling or disposal of the solar power facilities and |
|
|
the salvage value]: |
|
|
(A) on or before the 10th anniversary of the |
|
|
commercial operations date of the solar power facilities; and |
|
|
(B) at least once every five years after the |
|
|
commercial operations date of the solar power facilities for the |
|
|
remainder of the term of the agreement; and |
|
|
(3) the grantee is responsible for ensuring that the |
|
|
amount of the financial assurance remains sufficient to cover the |
|
|
amount required by Subsection (b), consistent with the estimates |
|
|
required by this subsection. |
|
|
(e) The agreement must provide that the grantee shall |
|
|
deliver the financial assurance to the commission not later than |
|
|
the [earlier of: |
|
|
[(1) the] date on which the solar power facility |
|
|
agreement begins [is terminated; or |
|
|
[(2) the 20th anniversary of the commercial operations |
|
|
date of the solar power facilities located on the landowner's |
|
|
leased property]. |
|
|
(g) The grantee may not cancel financial assurance before |
|
|
the date the grantee has completed the grantee's obligation to |
|
|
remove the grantee's solar power facilities located on the |
|
|
landowner's property as required [in the manner provided] by this |
|
|
chapter, unless the grantee provides the commission [landowner] |
|
|
with replacement financial assurance at the time of or before the |
|
|
cancellation. In the event of a transfer of ownership of the |
|
|
grantee's solar power facilities, the financial assurance |
|
|
[security] provided by the grantee shall remain in place until the |
|
|
date evidence of financial assurance [security] meeting the |
|
|
requirements of this chapter is provided to the commission |
|
|
[landowner]. |
|
|
SECTION 5. Section 303.0001, Utilities Code, is amended by |
|
|
adding Subdivision (4-a) to read as follows: |
|
|
(4-a) "Commission" means the Texas Commission on |
|
|
Environmental Quality. |
|
|
SECTION 6. Section 303.0005, Utilities Code, is amended by |
|
|
amending Subsections (a), (c), (d), (e), (f), and (g) and adding |
|
|
Subsection (b-1) to read as follows: |
|
|
(a) A battery energy storage facility agreement must |
|
|
provide that the grantee shall obtain and deliver to the commission |
|
|
[landowner] evidence of financial assurance payable to the |
|
|
landowner that conforms to the requirements of this section to |
|
|
secure the performance of the grantee's obligations under Section |
|
|
303.0004. The [Acceptable forms of] financial assurance may be |
|
|
[include a parent company guaranty with a minimum investment grade |
|
|
credit rating for the parent company issued by a major domestic |
|
|
credit rating agency, a letter of credit,] a bond[,] or another form |
|
|
of financial assurance reasonably acceptable to the landowner. |
|
|
(b-1) In addition to the amount required by Subsection (b), |
|
|
the amount of financial assurance must include an amount sufficient |
|
|
to compensate the landowner for any damages and restoration in the |
|
|
event of a fire, chemical spill or leak, thermal runaway, |
|
|
explosion, or any other hazard caused by the failure of the battery |
|
|
energy storage facility's system. As an alternative to including |
|
|
this amount in the financial assurance, notwithstanding Subsection |
|
|
(f), the grantee may provide an insurance policy for this amount |
|
|
that designates the landowner as an additional insured. |
|
|
(c) The agreement must provide that: |
|
|
(1) the estimated cost of removing the battery energy |
|
|
storage facilities from the landowner's property, recycling or |
|
|
disposing of all the components of the battery energy storage |
|
|
facilities, and restoring the property to as near as reasonably |
|
|
possible the condition of the property as of the date the agreement |
|
|
begins, as described by Section 303.0004, [and] the estimated |
|
|
salvage value of the battery energy storage facilities, and the |
|
|
estimated costs described by Subsection (b-1) must be determined by |
|
|
an independent, third-party professional engineer licensed in this |
|
|
state; |
|
|
(2) the grantee must deliver to the landowner and the |
|
|
commission the estimated costs and [cost of removal and recycling |
|
|
or disposal of the battery energy storage facilities and the] |
|
|
salvage value described by Subdivision (1) on or before the 10th |
|
|
anniversary of the battery operation date of the grantee's battery |
|
|
energy storage resources located on the landowner's property; and |
|
|
(3) the grantee must deliver an updated estimate of |
|
|
the costs [cost] and salvage value described by Subdivision (1) |
|
|
[(2)] at least once every five years after the initial estimate for |
|
|
the remainder of the term of the agreement. |
|
|
(d) The grantee is responsible for the costs of obtaining |
|
|
financial assurance described by this section and determining the |
|
|
estimated removal, recycling, and disposal costs and salvage value |
|
|
and costs described by Subsection (b-1). |
|
|
(e) The agreement must provide that the grantee shall |
|
|
deliver financial assurance to the commission not later than the |
|
|
[earlier of: |
|
|
[(1) the] date on which the battery energy storage |
|
|
facility agreement begins [is terminated; or |
|
|
[(2) the 15th anniversary of the battery operation |
|
|
date of the grantee's battery energy storage resources located on |
|
|
the landowner's property]. |
|
|
(f) The grantee is responsible for ensuring that the amount |
|
|
of financial assurance remains sufficient to cover the amount |
|
|
required by Subsections [Subsection] (b) and (b-1), consistent with |
|
|
the estimates required by this section. |
|
|
(g) The grantee may not cancel financial assurance before |
|
|
the date the grantee has completed the grantee's obligation to |
|
|
remove the grantee's battery energy storage facilities located on |
|
|
the landowner's property as required [in the manner provided] by |
|
|
this chapter, unless the grantee provides the commission |
|
|
[landowner] with replacement financial assurance at the time of or |
|
|
before the cancellation. In the event of a transfer of ownership of |
|
|
the grantee's battery energy storage facilities, financial |
|
|
assurance provided by the grantee shall remain in place until the |
|
|
date evidence of financial assurance meeting the requirements of |
|
|
this chapter is provided to the commission [landowner]. |
|
|
SECTION 7. Title 6, Utilities Code, is amended by adding |
|
|
Chapters 304 and 305 to read as follows: |
|
|
CHAPTER 304. ELECTRIC ENERGY STORAGE AND RENEWABLE POWER FACILITY |
|
|
AGREEMENTS |
|
|
Sec. 304.0001. DEFINITIONS. In this chapter: |
|
|
(1) "Commercial operations date" means the date on |
|
|
which a renewable power facility is approved for participation in |
|
|
market operations by a regional transmission organization and does |
|
|
not include the generation of electric energy or other operations |
|
|
conducted before that date for purposes of maintenance and testing. |
|
|
(2) "Commission" means the Texas Commission on |
|
|
Environmental Quality. |
|
|
(3) "Electric energy storage facility agreement" |
|
|
means a lease agreement between a grantee and a landowner that |
|
|
authorizes the grantee to operate an electric energy storage |
|
|
facility on the leased property. |
|
|
(4) "Grantee" means a person who leases property from |
|
|
a landowner. |
|
|
(5) "Operations date" means the date on which an |
|
|
electric energy storage resource is first used for its intended |
|
|
purposes. |
|
|
(6) "Recycle" means the processing of an item to |
|
|
recover a usable product. |
|
|
(7) "Renewable power facility" means a facility that: |
|
|
(A) generates electric energy using a renewable |
|
|
energy technology, as defined by Section 39.916, other than a |
|
|
technology that relies exclusively on wind or solar energy; and |
|
|
(B) is not an electric energy storage facility. |
|
|
(8) "Renewable power facility agreement" means a lease |
|
|
agreement between a grantee and a landowner that authorizes the |
|
|
grantee to operate a renewable power facility on the leased |
|
|
property. |
|
|
Sec. 304.0002. APPLICABILITY. (a) This chapter applies |
|
|
only to an electric energy storage facility or a renewable power |
|
|
facility that is intended to provide energy or ancillary services |
|
|
at wholesale for a power grid. |
|
|
(b) This chapter does not apply to an agreement that is |
|
|
subject to Chapter 301, 302, or 303. |
|
|
Sec. 304.0003. WAIVER VOID; REMEDIES. (a) A provision of |
|
|
an electric energy storage facility agreement or a renewable power |
|
|
facility agreement that purports to waive a right or exempt a |
|
|
grantee from liability or duty established by this chapter is void. |
|
|
(b) A person who is harmed by a violation of this chapter is |
|
|
entitled to appropriate injunctive relief to prevent further |
|
|
violation of this chapter. |
|
|
(c) The provisions of this section are not exclusive. The |
|
|
remedies provided in this section are in addition to any other |
|
|
procedures or remedies provided by law. |
|
|
Sec. 304.0004. REQUIRED AGREEMENT PROVISIONS ON ELECTRIC |
|
|
ENERGY STORAGE OR RENEWABLE POWER FACILITY REMOVAL. An electric |
|
|
energy storage facility agreement or renewable power facility |
|
|
agreement must provide that the grantee is responsible for: |
|
|
(1) removing the grantee's electric energy storage |
|
|
facilities or renewable power facilities, as applicable, from the |
|
|
landowner's property; and |
|
|
(2) restoring the property to as near as reasonably |
|
|
possible the condition of the property as of the date the agreement |
|
|
begins. |
|
|
Sec. 304.0005. REQUIRED AGREEMENT PROVISIONS ON FINANCIAL |
|
|
ASSURANCE. (a) An electric energy storage facility agreement or a |
|
|
renewable power facility agreement must provide that the grantee |
|
|
shall obtain and deliver to the commission evidence of financial |
|
|
assurance payable to the landowner that conforms to the |
|
|
requirements of this section to secure the performance of the |
|
|
grantee's obligations under Section 304.0004. The financial |
|
|
assurance may be a bond or another form of financial assurance |
|
|
reasonably acceptable to the landowner. |
|
|
(b) The amount of the financial assurance must be at least |
|
|
equal to the estimated amount by which the cost of removing the |
|
|
facilities from the landowner's property, recycling or disposing of |
|
|
all the components of the facilities, and restoring the property to |
|
|
as near as reasonably possible the condition of the property as of |
|
|
the date the agreement begins exceeds the salvage value of the |
|
|
facilities, less any portion of the value of the facilities pledged |
|
|
to secure outstanding debt. |
|
|
(c) In addition to the amount required by Subsection (b), |
|
|
the amount of financial assurance for an electric energy storage |
|
|
facility must include an amount sufficient to compensate the |
|
|
landowner for any damages and restoration in the event of a fire, |
|
|
chemical spill or leak, thermal runaway, explosion, or any other |
|
|
hazard caused by the failure of the electric energy storage |
|
|
facility's system. As an alternative to including this amount in |
|
|
the financial assurance, notwithstanding Subsection (d)(3), the |
|
|
grantee may provide an insurance policy for this amount that |
|
|
designates the landowner as an additional insured. |
|
|
(d) The agreement must provide that: |
|
|
(1) the estimated cost of removing the facilities from |
|
|
the landowner's property, recycling or disposing of all the |
|
|
components of the facilities, and restoring the property to as near |
|
|
as reasonably possible the condition of the property as of the date |
|
|
the agreement begins, the estimated salvage value of the |
|
|
facilities, and the estimated costs described by Subsection (c) |
|
|
must be determined by an independent, third-party professional |
|
|
engineer licensed in this state; |
|
|
(2) the grantee must deliver to the landowner and the |
|
|
commission an updated estimate, prepared by an independent, |
|
|
third-party professional engineer licensed in this state, of the |
|
|
costs and salvage value described by Subdivision (1): |
|
|
(A) on or before the 10th anniversary of the |
|
|
operations date or commercial operations date, as applicable, of |
|
|
the facilities; and |
|
|
(B) at least once every five years after the |
|
|
operations date or commercial operations date, as applicable, of |
|
|
the facilities for the remainder of the term of the agreement; and |
|
|
(3) the grantee is responsible for ensuring that the |
|
|
amount of the financial assurance remains sufficient to cover the |
|
|
amount required by Subsections (b) and (c), consistent with the |
|
|
estimates required by this subsection. |
|
|
(e) The grantee is responsible for the costs of obtaining |
|
|
financial assurance described by this section and costs of |
|
|
determining the estimated removal, recycling, and disposal costs |
|
|
and salvage value and costs described by Subsection (c). |
|
|
(f) The agreement must provide that the grantee shall |
|
|
deliver the financial assurance to the commission not later than |
|
|
the date the electric energy storage facility agreement or the |
|
|
renewable power facility agreement begins. |
|
|
(g) The grantee may not cancel financial assurance before |
|
|
the date the grantee has completed the grantee's obligation to |
|
|
remove the grantee's facilities located on the landowner's property |
|
|
as required by this chapter, unless the grantee provides the |
|
|
commission with replacement financial assurance at the time of or |
|
|
before the cancellation. In the event of a transfer of ownership of |
|
|
the grantee's facilities, financial assurance provided by the |
|
|
grantee shall remain in place until the date evidence of financial |
|
|
assurance meeting the requirements of this chapter is provided to |
|
|
the commission. |
|
|
CHAPTER 305. RELEASE OF FINANCIAL ASSURANCE |
|
|
Sec. 305.0001. DEFINITIONS. In this section: |
|
|
(1) "Commission" means the Texas Commission on |
|
|
Environmental Quality. |
|
|
(2) "Grantee" means a person who leases property from |
|
|
a landowner. |
|
|
Sec. 305.0002. RELEASE OF FINANCIAL ASSURANCE TO GRANTEE. |
|
|
(a) At any time, a grantee may file an application with the |
|
|
commission for the release of all or part of a bond or other |
|
|
financial assurance provided to the commission by the grantee for a |
|
|
landowner under Chapter 301, 302, 303, or 304. |
|
|
(b) The application must be on a form prescribed by the |
|
|
commission and, in addition to other information the commission may |
|
|
require, must include the type and the approximate date of removal |
|
|
and restoration work performed and a description of the results |
|
|
achieved. |
|
|
(c) The grantee shall provide a copy of the application to |
|
|
the landowner not later than the 30th day after the date the grantee |
|
|
files the application with the commission. |
|
|
(d) Not later than the 45th day after the date the grantee |
|
|
files the application, the commission shall conduct an inspection |
|
|
and evaluation of the removal and restoration work performed. |
|
|
(e) The commission may release all or part of the financial |
|
|
assurance if the commission determines that the grantee has |
|
|
completed all or part of the grantee's obligations under the |
|
|
agreement entered into under Section 301.0003, 302.0004, 303.0004, |
|
|
or 304.0004, as applicable. |
|
|
(f) If the commission disapproves the application for |
|
|
release of the financial assurance, the commission shall notify the |
|
|
grantee in writing of the reasons for disapproval and recommend |
|
|
corrective actions necessary to secure the release of the financial |
|
|
assurance. |
|
|
Sec. 305.0003. FORFEITURE OF FINANCIAL ASSURANCE TO |
|
|
LANDOWNER. (a) A landowner may file an application with the |
|
|
commission for the forfeiture of all or part of a bond or other |
|
|
financial assurance provided to the commission by a grantee for the |
|
|
landowner under this chapter if: |
|
|
(1) the grantee has not completed the grantee's |
|
|
obligations under the agreement entered into under Section |
|
|
301.0003, 302.0004, 303.0004, or 304.0004, as applicable; and |
|
|
(2) the facility that is the subject of the agreement |
|
|
is no longer being used by the grantee to generate or store energy |
|
|
in the manner provided by the agreement. |
|
|
(b) The application must be on a form prescribed by the |
|
|
commission. |
|
|
(c) The landowner shall provide a copy of the application to |
|
|
the grantee not later than the 30th day after the date the landowner |
|
|
files the application with the commission. |
|
|
(d) Not later than the 45th day after the date the landowner |
|
|
files the application, the commission shall conduct an inspection |
|
|
and evaluation of the property for which the financial assurance |
|
|
was provided. |
|
|
(e) The commission may approve the forfeiture of all or part |
|
|
of the financial assurance if the commission determines that: |
|
|
(1) the facility that is the subject of the agreement |
|
|
is no longer being used to generate or store energy in the manner |
|
|
described by the agreement; and |
|
|
(2) the forfeiture is necessary to compensate the |
|
|
landowner for any remaining removal and restoration work the |
|
|
grantee was required to but did not complete under the agreement. |
|
|
(f) If the commission disapproves the application for |
|
|
forfeiture of the financial assurance, the commission shall notify |
|
|
the landowner in writing of the reasons for disapproval. |
|
|
Sec. 305.0004. COMMISSION AUTHORITY. (a) The commission |
|
|
shall notify the Public Utility Commission of Texas if the |
|
|
commission requires forfeiture of financial assurance under |
|
|
Section 305.0003. The commission and the Public Utility Commission |
|
|
of Texas may not issue to a grantee whose financial assurance was |
|
|
forfeited under Section 305.0003 any permit, certificate, or |
|
|
registration under other law that authorizes the grantee to operate |
|
|
a facility to which Chapter 301, 302, 303, or 304 applies or renew |
|
|
any such permit, certificate, or registration. |
|
|
(b) In a suit for receivership, garnishment, or bankruptcy, |
|
|
or in any other legal action affecting the assets of a grantee that |
|
|
is a party to an agreement subject to Chapter 301, 302, 303, or 304, |
|
|
the commission may: |
|
|
(1) inform the appropriate court and parties of the |
|
|
commission's interest in obtaining notice of the proceedings; and |
|
|
(2) within the time prescribed by the applicable |
|
|
statutes, rules, and court orders, intervene and participate in any |
|
|
proceedings that affect a landowner not joined in the suit who is a |
|
|
party to the agreement with the grantee. |
|
|
SECTION 8. Section 5.013(a), Water Code, is amended to read |
|
|
as follows: |
|
|
(a) The commission has general jurisdiction over: |
|
|
(1) water and water rights including the issuance of |
|
|
water rights permits, water rights adjudication, cancellation of |
|
|
water rights, and enforcement of water rights; |
|
|
(2) continuing supervision over districts created |
|
|
under Article III, Sections 52(b)(1) and (2), and Article XVI, |
|
|
Section 59, of the Texas Constitution; |
|
|
(3) the state's water quality program including |
|
|
issuance of permits, enforcement of water quality rules, standards, |
|
|
orders, and permits, and water quality planning; |
|
|
(4) the determination of the feasibility of certain |
|
|
federal projects; |
|
|
(5) the adoption and enforcement of rules and |
|
|
performance of other acts relating to the safe construction, |
|
|
maintenance, and removal of dams; |
|
|
(6) conduct of the state's hazardous spill prevention |
|
|
and control program; |
|
|
(7) the administration of the state's program relating |
|
|
to inactive hazardous substance, pollutant, and contaminant |
|
|
disposal facilities; |
|
|
(8) the administration of a portion of the state's |
|
|
injection well program; |
|
|
(9) the administration of the state's programs |
|
|
involving underground water and water wells and drilled and mined |
|
|
shafts; |
|
|
(10) the state's responsibilities relating to regional |
|
|
waste disposal; |
|
|
(11) the responsibilities assigned to the commission |
|
|
by: |
|
|
(A) Chapters 361, 363, 376, 382, 401, 505, 506, |
|
|
and 507, Health and Safety Code; and |
|
|
(B) Title 6, Utilities Code; and |
|
|
(12) any other areas assigned to the commission by |
|
|
this code and other laws of this state. |
|
|
SECTION 9. (a) The changes in law made by this Act apply |
|
|
only to a battery energy storage facility agreement, an electric |
|
|
energy storage facility agreement, a renewable power facility |
|
|
agreement, a solar power facility agreement, or a wind power |
|
|
facility agreement entered into on or after the effective date of |
|
|
this Act. An agreement entered into before the effective date of |
|
|
this Act is governed by the law applicable to the agreement on the |
|
|
date the agreement was entered into, and that law is continued in |
|
|
effect for that purpose. |
|
|
(b) Notwithstanding Subsection (a) of this section, a |
|
|
battery energy storage facility, electric energy storage facility, |
|
|
renewable power facility, solar power facility, or wind power |
|
|
facility that has entered into a battery energy storage facility |
|
|
agreement, an electric energy storage facility agreement, a |
|
|
renewable power facility agreement, a solar power facility |
|
|
agreement, or a wind power facility agreement before the effective |
|
|
date of this Act shall deliver the financial assurance required |
|
|
under Section 301.0004, 302.0005, or 303.0005, Utilities Code, as |
|
|
amended by this Act, or Section 304.0005, Utilities Code, as added |
|
|
by this Act, to the Texas Commission on Environmental Quality not |
|
|
later than the earlier of: |
|
|
(1) the date on which the agreement is amended; or |
|
|
(2) January 1, 2028. |
|
|
SECTION 10. This Act takes effect immediately if it |
|
|
receives a vote of two-thirds of all the members elected to each |
|
|
house, as provided by Section 39, Article III, Texas Constitution. |
|
|
If this Act does not receive the vote necessary for immediate |
|
|
effect, this Act takes effect September 1, 2027. |