System updates will be applied on February 19, 2026 at 6:00 PM. These updates will include changes to the user interface. Work is expected to take approximately 30 minutes to complete, during which the site will be unavailable.


 
Bill:  SB 2008 
Legislative Session: 81(R) Author: Hegar
Add to Bill List
Introduced
Relating to consideration of water produced from exempt wells.

Senate Committee Report
Relating to the consideration by a groundwater conservation district of groundwater produced from exempt wells in issuing a permit.

Engrossed
Relating to the consideration by a groundwater conservation district of groundwater produced from exempt wells in issuing a permit.