Bill:  SB 1282 
Legislative Session: 87(R) Author: Hancock
Add to Bill List
Introduced
Relating to cost recovery for costs arising from the interconnection of certain electric generation facilities with the ERCOT transmission system.

Senate Committee Report
Relating to cost recovery for costs arising from the interconnection of certain electric generation facilities with the ERCOT transmission system.

Engrossed
Relating to cost recovery for costs arising from the interconnection of certain electric generation facilities with the ERCOT transmission system.

House Committee Report
Relating to cost recovery for costs arising from the interconnection of certain electric generation facilities with the ERCOT transmission system.